07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Receptor<br />

Effect<br />

Development<br />

Phase<br />

Sensitivity/<br />

Importance<br />

of Receptor<br />

Magnitude of<br />

Change/Effect<br />

Level of<br />

Effect (and<br />

Significance)<br />

Prior to<br />

Mitigation<br />

Mitigation<br />

Enhancement<br />

Level of<br />

Effect (and<br />

Significance)<br />

after<br />

Mitigation<br />

Nature of Effect<br />

Decommissioning Phase: Of comparable type and of similar magnitude to the construction phase effects<br />

Table 16.6 Summary of Effects – Ornithology<br />

Level of<br />

Level of<br />

Receptor<br />

Effect<br />

Development<br />

Phase<br />

Sensitivity/<br />

Importance<br />

of Receptor<br />

Magnitude of<br />

Change/Effect<br />

Effect (and<br />

Significance)<br />

Prior to<br />

Mitigation<br />

Enhancement<br />

Effect (and<br />

Significance<br />

) after<br />

Nature of Effect<br />

Mitigation<br />

Mitigation<br />

Assumes<br />

Removal (felling)<br />

theoretical loss of a<br />

Goshawk<br />

Habitat loss<br />

(nesting)<br />

Construction<br />

Regional<br />

Small (worst<br />

case scenario)<br />

Slight<br />

(not<br />

significant)<br />

of nest site prior<br />

to construction<br />

and outside of<br />

the breeding<br />

season<br />

N/A<br />

Slight (not<br />

significant)<br />

nest site in the<br />

unlikely event that<br />

one is established<br />

within the<br />

development<br />

footprint<br />

Habitat loss<br />

(<strong>for</strong>aging)<br />

Construction Regional Negligible<br />

Negligible (not<br />

significant)<br />

None<br />

N/A<br />

Negligible<br />

(not<br />

significant)<br />

None predicted<br />

Goshawk<br />

Disturbance/ Construction Regional Small (worst Slight Pre- and midconstruction<br />

N/A Slight (not Assumes<br />

March 2013 Displacement<br />

16-19<br />

theoretical ES Chapter 16<br />

Summary of Effects and Mitigation<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!