Camilty Wind Farm - Partnerships for Renewables
Camilty Wind Farm - Partnerships for Renewables Camilty Wind Farm - Partnerships for Renewables
Camilty Wind Farm Receptor Effect Development Phase Sensitivity/ Importance of Receptor Magnitude of Change/Effect Level of Effect (and Significance) Prior to Mitigation Mitigation Enhancement Level of Effect (and Significance) after Mitigation Nature of Effect Watercourses Construction Low/ Local Small Negligible (not significant) Negligible (not significant) Direct, negative, temporary. Otter Construction Low/ Local Small Slight or negligible(not significant) Pre-construction and pre-felling checks for protected species to be undertaken by the ECoW. Negligible (not significant) Direct, negative, temporary. Bat species Badger Disturbance, displacement and injury due to construction activities. Construction Construction Low/ Local Low/ Local Small Negligible Slight or negligible (not significant) Negligible (not significant) Specific protection measures for protected species (e.g. covering trenches, pits and pipelines). Demarcation of working zones to limit disturbance to species. Vehicle speed restrictions on site. Demarcation of working zones to limit disturbance to species. Negligible (not significant) Negligible (not significant) Direct, negative, temporary. N/A Coniferous plantation woodland Broadleaved woodland Wet modified bog Direct habitat loss through the installation of wind farm infrastructure. Construction Construction Construction Low/ Local Low/ Local High/ International Large Negligible Small Moderate to Slight (not significant) Negligible (not significant) Slight (not significant) Preparation and implementation of HSEMS detailing habitat delimitation to limit the potential for habitat loss, and habitat restoration techniques. Use of micrositing wherever - - - Negligible (not significant) Negligible (not significant) Negligible (not significant) Direct, negative, permanent. Direct, negative, permanent. Direct, negative, permanent. March 2013 16-15 ES Chapter 16 Copyright Partnerships for Renewables Development Co. Ltd 2013 © Summary of Effects and Mitigation
Camilty Wind Farm Receptor Effect Development Phase Sensitivity/ Importance of Receptor Magnitude of Change/Effect Level of Effect (and Significance) Prior to Mitigation Mitigation Enhancement Level of Effect (and Significance) after Mitigation Nature of Effect Marshy grassland Construction Low/ Local Small Negligible (not significant) necessary under advice of ECoW. - Negligible (not significant) Direct, negative, permanent. Semiimproved acid grassland Construction Low/ Local Negligible Negligible (not significant) - Negligible (not significant) Direct, negative, permanent. Watercourses Construction Low/ Local Negligible Negligible (not significant) - Negligible (not significant) N/A Otter Construction Low/ Local Negligible Negligible (not significant) - - Negligible (not significant) N/A Bat species Habitat loss and habitat fragmentation Construction Low/ Local Small Negligible (not significant) Keyhole felling will increase the area of suitable habitat. Negligible (not significant) Direct, negative, permanent. Badger Construction Low/ Local Negligible Negligible (not significant) - - Negligible (not significant) N/A All habitats excluding Wet Modified Bog Damage, disturbance and pollution Operation Low/ Local Small Negligible (not significant) Implementation of best practice and guidance - Negligible (not significant) Indirect, negative, temporary. March 2013 16-16 ES Chapter 16 Copyright Partnerships for Renewables Development Co. Ltd 2013 © Summary of Effects and Mitigation
- Page 466 and 467: Camilty Wind Farm at the time of oc
- Page 468 and 469: Camilty Wind Farm Criteria for Magn
- Page 470 and 471: Camilty Wind Farm • “The locati
- Page 472 and 473: Camilty Wind Farm 15.3.11 The econo
- Page 474 and 475: Camilty Wind Farm Land Use 15.3.19
- Page 476 and 477: Camilty Wind Farm 15.3.30 Tourism f
- Page 478 and 479: Camilty Wind Farm • Linlithgow Ca
- Page 480 and 481: Camilty Wind Farm were not availabl
- Page 482 and 483: Camilty Wind Farm • A 5.5 km trai
- Page 484 and 485: Camilty Wind Farm 15.4.6 In additio
- Page 486 and 487: Camilty Wind Farm 15.4.19 Given the
- Page 488 and 489: Camilty Wind Farm exploration of hi
- Page 490 and 491: Camilty Wind Farm • A705 between
- Page 492 and 493: Camilty Wind Farm of the views that
- Page 494 and 495: Camilty Wind Farm Table 15.9 Summar
- Page 496 and 497: Camilty Wind Farm Receptor Effect D
- Page 498 and 499: Camilty Wind Farm Receptor Effect D
- Page 500 and 501: Camilty Wind Farm the justification
- Page 502 and 503: Camilty Wind Farm 16 Summary of Eff
- Page 504 and 505: Camilty Wind Farm Table 16.2 Summar
- Page 506 and 507: Camilty Wind Farm Receptor Effect D
- Page 508 and 509: Camilty Wind Farm Receptor Effect D
- Page 510 and 511: Camilty Wind Farm Receptor Effect D
- Page 512 and 513: Camilty Wind Farm Table 16.5 Summar
- Page 514 and 515: Camilty Wind Farm Receptor Effect D
- Page 518 and 519: Camilty Wind Farm Receptor Effect D
- Page 520 and 521: Camilty Wind Farm Receptor Effect D
- Page 522 and 523: Camilty Wind Farm Level of Level of
- Page 524 and 525: Camilty Wind Farm Level of Level of
- Page 526 and 527: Camilty Wind Farm Receptor Effect D
- Page 528 and 529: Camilty Wind Farm Receptor Effect D
- Page 530 and 531: Camilty Wind Farm Receptor Effect D
- Page 532 and 533: Camilty Wind Farm Receptor Effect D
- Page 534 and 535: Camilty Wind Farm site management.
- Page 536 and 537: Camilty Wind Farm Topic Landscape a
- Page 538 and 539: Camilty Wind Farm Topic Key Mitigat
- Page 540 and 541: Camilty Wind Farm Topic Hydrology,
- Page 542 and 543: Camilty Wind Farm Topic Key Mitigat
- Page 544 and 545: Camilty Wind Farm Topic Key Mitigat
- Page 546 and 547: Camilty Wind Farm Topic Key Mitigat
<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />
Receptor<br />
Effect<br />
Development<br />
Phase<br />
Sensitivity/<br />
Importance<br />
of Receptor<br />
Magnitude of<br />
Change/Effect<br />
Level of<br />
Effect (and<br />
Significance)<br />
Prior to<br />
Mitigation<br />
Mitigation<br />
Enhancement<br />
Level of<br />
Effect (and<br />
Significance)<br />
after<br />
Mitigation<br />
Nature of Effect<br />
Watercourses<br />
Construction<br />
Low/<br />
Local<br />
Small<br />
Negligible<br />
(not<br />
significant)<br />
Negligible<br />
(not<br />
significant)<br />
Direct, negative,<br />
temporary.<br />
Otter<br />
Construction<br />
Low/<br />
Local<br />
Small<br />
Slight or<br />
negligible(not<br />
significant)<br />
Pre-construction and pre-felling<br />
checks <strong>for</strong> protected species to be<br />
undertaken by the ECoW.<br />
Negligible<br />
(not<br />
significant)<br />
Direct, negative,<br />
temporary.<br />
Bat species<br />
Badger<br />
Disturbance,<br />
displacement<br />
and injury due<br />
to construction<br />
activities.<br />
Construction<br />
Construction<br />
Low/<br />
Local<br />
Low/<br />
Local<br />
Small<br />
Negligible<br />
Slight or<br />
negligible (not<br />
significant)<br />
Negligible<br />
(not<br />
significant)<br />
Specific protection measures <strong>for</strong><br />
protected species (e.g. covering<br />
trenches, pits and pipelines).<br />
Demarcation of working zones to<br />
limit disturbance to species.<br />
Vehicle speed restrictions on site.<br />
Demarcation of working zones to<br />
limit disturbance to species.<br />
Negligible<br />
(not<br />
significant)<br />
Negligible<br />
(not<br />
significant)<br />
Direct, negative,<br />
temporary.<br />
N/A<br />
Coniferous<br />
plantation<br />
woodland<br />
Broadleaved<br />
woodland<br />
Wet modified<br />
bog<br />
Direct habitat<br />
loss through<br />
the installation<br />
of wind farm<br />
infrastructure.<br />
Construction<br />
Construction<br />
Construction<br />
Low/<br />
Local<br />
Low/<br />
Local<br />
High/<br />
International<br />
Large<br />
Negligible<br />
Small<br />
Moderate to<br />
Slight (not<br />
significant)<br />
Negligible<br />
(not<br />
significant)<br />
Slight (not<br />
significant)<br />
Preparation and<br />
implementation of<br />
HSEMS detailing<br />
habitat<br />
delimitation to limit<br />
the potential <strong>for</strong><br />
habitat loss, and<br />
habitat restoration<br />
techniques.<br />
Use of micrositing<br />
wherever<br />
-<br />
-<br />
-<br />
Negligible<br />
(not<br />
significant)<br />
Negligible<br />
(not<br />
significant)<br />
Negligible<br />
(not<br />
significant)<br />
Direct, negative,<br />
permanent.<br />
Direct, negative,<br />
permanent.<br />
Direct, negative,<br />
permanent.<br />
March 2013 16-15 ES Chapter 16<br />
Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />
Summary of Effects and Mitigation