07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Table 16.5 Summary of Effects – Terrestrial Ecology<br />

Receptor<br />

Effect<br />

Development<br />

Phase<br />

Sensitivity/<br />

Importance<br />

of Receptor<br />

Magnitude of<br />

Change/Effect<br />

Level of<br />

Effect (and<br />

Significance)<br />

Prior to<br />

Mitigation<br />

Mitigation<br />

Enhancement<br />

Level of<br />

Effect (and<br />

Significance)<br />

after<br />

Mitigation<br />

Nature of Effect<br />

Craigengar<br />

SAC and<br />

SSSI<br />

Cobbinshaw<br />

Moss SSSI<br />

Cobbinshaw<br />

reservoir<br />

SSSI<br />

Linhouse<br />

Valley SSSI<br />

Hermand<br />

Birchwood<br />

SSSI<br />

Pollution:<br />

waterborne<br />

and airborne<br />

sources.<br />

The effects of<br />

impacts on<br />

groundwater<br />

systems are<br />

assessed in<br />

Chapter 13<br />

Hydrology,<br />

Hydrogeology<br />

and Ground<br />

Conditions.<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

High/<br />

International<br />

High/<br />

National<br />

High/<br />

National<br />

High/<br />

National<br />

High/<br />

National<br />

Negligible<br />

Negligible<br />

Negligible<br />

Negligible<br />

Negligible<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Preparation and<br />

implementation<br />

of a HSEMS<br />

detailing<br />

pollution<br />

prevention<br />

measures and<br />

dust controls.<br />

Considered<br />

design of<br />

upgraded<br />

watercourse<br />

crossings.<br />

Water quality<br />

monitoring<br />

covering a<br />

baseline period<br />

and<br />

construction<br />

phase of the<br />

wind farm.<br />

Employment of<br />

an ECoW on<br />

the site.<br />

-<br />

-<br />

-<br />

-<br />

-<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Indirect, negative,<br />

temporary.<br />

Indirect, negative,<br />

temporary.<br />

Indirect, negative,<br />

temporary.<br />

Indirect, negative,<br />

temporary.<br />

Indirect, negative,<br />

temporary.<br />

March 2013 16-11 ES Chapter 16<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />

Summary of Effects and Mitigation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!