07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Table 16.4 Summary of Effects – Cultural Heritage and Archaeology<br />

Receptor<br />

Effect<br />

Development<br />

Phase<br />

Sensitivity/<br />

Importance of<br />

Receptor<br />

Magnitude<br />

of Change<br />

Level of<br />

Effect (and<br />

Significance)<br />

Prior to<br />

Mitigation<br />

Mitigation<br />

Enhancement<br />

Level of Effect<br />

(and<br />

Significance)<br />

after<br />

Mitigation<br />

Nature of Effect<br />

Effects on<br />

buried<br />

archaeological<br />

remains<br />

Disturbance of<br />

buried remains.<br />

Construction<br />

Negligible to<br />

Low<br />

None-Small<br />

Slight (not<br />

significant)<br />

Programme<br />

of fieldwork<br />

-<br />

Slight(not<br />

significant)<br />

Possible further<br />

disturbance of<br />

buried remains<br />

already<br />

damaged by<br />

<strong>for</strong>estry planting.<br />

Scheduled Monuments (n.b. no Scheduled Monument shown on Figures 10.1-10.3 would have a greater than slight (not significant) adverse effect other than those listed below)<br />

Core Study Area (up to 1.5 km outside boundary of proposed wind farm)<br />

SM 1930<br />

<strong>Camilty</strong><br />

Hill,Roman<br />

<strong>for</strong>tlet,Castle<br />

Greg<br />

Effect on<br />

setting.<br />

Operation High Medium<br />

Moderate<br />

(significant)<br />

-<br />

Screen planting<br />

remaining<br />

Moderate<br />

(significant)<br />

Moderate<br />

negative effect<br />

Total of 2<br />

further SMs.<br />

See Appendix<br />

10.1 <strong>for</strong> details<br />

Effect on<br />

setting.<br />

Operation High Small<br />

Slight (not<br />

significant)<br />

-<br />

Screen planting<br />

remaining<br />

Slight (not<br />

significant)<br />

Slight negative<br />

effect<br />

Inner Study Area (1.5 to 5 km of the boundary of proposed wind farm)<br />

Total of six SMs<br />

See Appendix<br />

10.1 <strong>for</strong> details<br />

Effect on<br />

setting.<br />

Operation High Small<br />

Slight (not<br />

significant)<br />

-<br />

Screen planting<br />

remaining<br />

Slight (not<br />

significant)<br />

Slight negative<br />

effect<br />

March 2013 16-8 ES Chapter 16<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />

Summary of Effects and Mitigation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!