07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Receptor Effect Development<br />

Phase<br />

Sensitivity/<br />

Importance<br />

of<br />

Receptor<br />

Magnitude<br />

of Change<br />

Level of<br />

Effect (and<br />

Significance)<br />

Prior to<br />

Mitigation<br />

Mitigation Enhancement Level of<br />

Effect (and<br />

Significance)<br />

after<br />

Mitigation<br />

Nature of<br />

Effect (i.e.<br />

temporary/<br />

permenant/<br />

direct etc)<br />

travelling north<br />

east and south<br />

west on<br />

Lockerbie to<br />

Livingston<br />

railway<br />

Decommission significant) significant)<br />

Operation<br />

Major (an<br />

accumulation<br />

of Moderate<br />

effects.<br />

Significant)<br />

- - Major<br />

(significant)<br />

Permanent<br />

Direct<br />

Walkers using<br />

Cauldstane<br />

Slap/Old<br />

Drove<br />

Road/Thieves<br />

Road Heritage<br />

Footpath<br />

between A70<br />

and Pentland<br />

Ridge<br />

Sequentia<br />

l effects<br />

Construction/<br />

Decommission<br />

High<br />

Medium<br />

Moderate<br />

(not<br />

significant)<br />

- - Moderate<br />

(not<br />

significant)<br />

Temporary<br />

Direct<br />

Operation<br />

Major<br />

(significant)<br />

- - Major<br />

(significant)<br />

Permanent<br />

Direct<br />

March 2013 16-7 ES Chapter 16<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />

Summary of Effects and Mitigation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!