Camilty Wind Farm Receptor Effect Development Phase Sensitivity/ Importance of Receptor Magnitude of Change Level of Effect (and Significance) Prior to Mitigation Mitigation Enhancement Level of Effect (and Significance) after Mitigation Nature of Effect (i.e. temporary/ permenant/ direct etc) Camilty Lodge significant) significant) Operation Major (significant) - - Major (significant) Permanent Direct Walkers using Core Path A70 to High Camilty Visual Construction/ Decommission Operation High Large Major (significant) Substantial (significant) - - Major (significant) - - Substantial (significant) Temporary Direct Permanent Direct Walkers using Core Path A70 to Pentlands Visual Construction/ Decommission High Large Major (significant) - - Major (significant) Temporary Direct Operation Substantial (significant) - - Substantial (significant) Permanent Direct Viewpoint 4: Crosswood Reservoir Visual Construction/ Decommission High Large Major (significant) - - Major (significant) Temporary Direct Operation Substantial (significant) - - Substantial (significant) Permanent Direct Viewpoint 12: West Cairn Hill Visual Construction/ High Medium Moderate (not - - Moderate (not Temporary Direct March 2013 16-5 ES Chapter 16 Copyright Partnerships for Renewables Development Co. Ltd 2013 © Summary of Effects and Mitigation

Camilty Wind Farm Receptor Effect Development Phase Sensitivity/ Importance of Receptor Magnitude of Change Level of Effect (and Significance) Prior to Mitigation Mitigation Enhancement Level of Effect (and Significance) after Mitigation Nature of Effect (i.e. temporary/ permenant/ direct etc) Decommission significant) significant) Operation Major (significant) - - Major (significant) Permanent Direct Viewpoint 13: Craigengar Visual Construction/ Decommission High Medium Moderate (not significant) - - Moderate (not significant) Temporary Direct Operation Major (significant) - - Major (significant) Permanent Direct Occupiers of vehicles travelling north east and south west on A70 between Windygreen and Auchinoon Sequentia l effects Construction/ Decommission Medium Large Moderate (not significant) - - Moderate (not significant) Temporary Direct Operation Major (significant) - - Major (significant) Permanent Direct Occupiers of trains Sequentia l effects Construction/ Medium Medium Moderate (not - - Moderate (not Temporary Direct March 2013 16-6 ES Chapter 16 Copyright Partnerships for Renewables Development Co. Ltd 2013 © Summary of Effects and Mitigation

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Receptor Effect Development<br />

Phase<br />

Sensitivity/<br />

Importance<br />

of<br />

Receptor<br />

Magnitude<br />

of Change<br />

Level of<br />

Effect (and<br />

Significance)<br />

Prior to<br />

Mitigation<br />

Mitigation Enhancement Level of<br />

Effect (and<br />

Significance)<br />

after<br />

Mitigation<br />

Nature of<br />

Effect (i.e.<br />

temporary/<br />

permenant/<br />

direct etc)<br />

Decommission significant) significant)<br />

Operation<br />

Major<br />

(significant)<br />

- - Major<br />

(significant)<br />

Permanent<br />

Direct<br />

Viewpoint 13:<br />

Craigengar<br />

Visual<br />

Construction/<br />

Decommission<br />

High<br />

Medium<br />

Moderate<br />

(not<br />

significant)<br />

- - Moderate<br />

(not<br />

significant)<br />

Temporary<br />

Direct<br />

Operation<br />

Major<br />

(significant)<br />

- - Major<br />

(significant)<br />

Permanent<br />

Direct<br />

Occupiers of<br />

vehicles<br />

travelling north<br />

east and south<br />

west on A70<br />

between<br />

<strong>Wind</strong>ygreen<br />

and Auchinoon<br />

Sequentia<br />

l effects<br />

Construction/<br />

Decommission<br />

Medium<br />

Large<br />

Moderate<br />

(not<br />

significant)<br />

- - Moderate<br />

(not<br />

significant)<br />

Temporary<br />

Direct<br />

Operation<br />

Major<br />

(significant)<br />

- - Major<br />

(significant)<br />

Permanent<br />

Direct<br />

Occupiers of<br />

trains<br />

Sequentia<br />

l effects<br />

Construction/ Medium Medium Moderate<br />

(not<br />

- - Moderate<br />

(not<br />

Temporary<br />

Direct<br />

March 2013 16-6 ES Chapter 16<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />

Summary of Effects and Mitigation