07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Table 13.18 Summary of Level of Effects (and Significance)<br />

Receptor Effect Development<br />

phase<br />

Sensitivity /<br />

importance<br />

of receptor<br />

Magnitude<br />

of change<br />

Scale of<br />

effect (and<br />

significance)<br />

prior to<br />

mitigation<br />

Mitigation<br />

Scale of<br />

effect (and<br />

significance)<br />

after<br />

mitigation<br />

Nature of<br />

effect<br />

Watercourses<br />

Effects on surface<br />

runoff<br />

characteristics<br />

Construction Low Medium Slight (not<br />

significant)<br />

Construction drainage system<br />

(SuDS)<br />

Slight or<br />

negligible (not<br />

significant)<br />

Temporary<br />

Operation Medium Slight (not<br />

significant)<br />

Track design including permeable<br />

paving.<br />

Removal of drainage around<br />

foundations<br />

Slight or<br />

negligible (not<br />

significant)<br />

Permanent<br />

Decommission Small Slight or<br />

negligible (not<br />

significant)<br />

Construction drainage system<br />

(SuDS)<br />

Slight or<br />

negligible (not<br />

significant)<br />

Temporary<br />

Effects on river<br />

flow and flooding<br />

Construction Small Slight or<br />

negligible (not<br />

significant)<br />

Working buffers around streams.<br />

Negligible (not<br />

significant)<br />

Temporary<br />

Operation Small Slight or<br />

negligible (not<br />

significant)<br />

Stream crossing design.<br />

Negligible (not<br />

significant)<br />

Permanent<br />

Decommission Negligible Negligible (not<br />

significant)<br />

Working buffers around streams.<br />

Negligible (not<br />

significant)<br />

Temporary<br />

Erosion and<br />

sedimentation<br />

Construction Large Moderate or<br />

slight<br />

(significant)<br />

Construction drainage system<br />

(SuDS).<br />

Slight (not<br />

significant)<br />

Temporary<br />

Operation<br />

Small<br />

Slight or<br />

negligible (not<br />

Landscaping and vegetation<br />

restoration.<br />

Slight (not<br />

significant)<br />

Temporary<br />

March 2013 13-33 ES Chapter 13<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />

Hydrology, Hydrogeology and Ground Conditions

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!