Camilty Wind Farm March 2013 be near the adjacent peat surface and cross-drains will be installed at or just below the track surface. These measures will ensure that runoff within the upper peat layer (acrotelm) is not blocked by the track. The track base will be constructed using suitably permeable graded material such that the slow movement of water in the deeper peat layers is not significantly affected by the track. Stream Crossings 13.6.34 The location of the proposed stream crossings on site are shown in Figure 13.1. The alignment of the new site access tracks has been optimised to avoid the need for stream crossings where possible. As such, only 2 new stream crossings will be required. A stream crossing survey was undertaken and results are presented in Appendix 13.3. 13.6.35 Confirmation of the level of any CAR authorisations required for the new stream crossings will be confirmed with SEPA in advance. 13.6.36 The new crossing structures will not form a barrier to river flows (low flows and flood flows) and aquatic fauna, and will be designed and constructed with respect to relevant guidance and best practice. For example, the crossing over the Crosswood Burn (x2) will be constructed using a bridge structure spanning the river channel and the floodplain. The crossing over the Powfastle Burn (x1) will be constructed using a single span structure such as a bottomless arch structure. 13.6.37 Where access tracks cross artificial drainage ditches, simple pipe structures will be installed in accordance with the Forests and Water guidance document. The pipe invert levels will be installed slightly below upstream and downstream bed levels to ensure that barriers for fish passage and sediment transport are minimised. Any potential effects arising from the artificial drainage on aquatic habitats is presented in Chapter 11: Terrestrial Ecology. 13.6.38 Streams, crossings and drainage ditches will be inspected and cleared regularly to prevent blockages and remove the risk of flooding throughout the construction and operational life of the wind farm. On-site Buildings 13.6.39 On-site welfare facilities will be adequately designed and maintained to ensure all wastewater and sewage is disposed of appropriately. This disposal is likely to take the form of either a closed on-site septic tank with tankering offsite for disposal or a suitable on-site treatment system with discharge to soakaway. Design of the final system will require further consultation with and authorisation from SEPA. 13.6.40 Rainfall on roofs will be collected in a rainwater tank for re-use within the building. Any excess rainwater will be discharged to groundwater or surface water. 13.6.41 The sizing and location of the various elements of the drainage system will be influenced by the topography, gradient and catchment runoff characteristics and the volumes of runoff intercepted by each drain. These factors will be determined at the detailed design stage. Cables 13.6.42 Where cables are required to be buried, the following mitigation shall be put in place: • Excavations for trenches will be of minimal size necessary to undertake works; • Cable trenches will be dug, cables laid and filled in sections to minimise the areas of active excavation open at any one time; 13-31 Copyright Partnerships for Renewables Development Co. Ltd 2013 © Hydrology, Hydrogeology and Ground Conditions
Camilty Wind Farm • Bunds will be placed along the route of the buried cable route to prevent the creation of a preferential pathway for groundwater arising along the path of the cable; and • All cables will be marked above and below ground to ensure there is no danger to human health or the environment during maintenance or earth works within the vicinity of the cable routes. Concrete Pouring 13.6.43 When concrete is being poured shutters will be used and, if being poured into an excavation, only into an area free from standing water. Pumps should be used to keep excavations dry if required. 13.6.44 Concrete pouring will not be undertaken during heavy rainfall. 13.6.45 No concrete will be placed within 0.5 m of an open water channel unless the area can be fully isolated from the stream, for example through bunding and lining. 13.6.46 Concrete batching will be undertaken on-site only in the construction compound. Traffic 13.6.47 Site traffic will be kept to clearly designated tracks, in line with a site-specific traffic management plan. 13.6.48 Barriers and/or netting will be used to prevent vehicle movements in sensitive areas as per CE Handbook specifications. 13.6.49 Where vehicle movements are required to take place off-track, e.g. on soft ground during construction phase, these will be limited to the absolute minimum and where excessive offtrack vehicle movements are required, temporary tracks (e.g. geotextile overlain with aggregate) or peat-boards should be used to prevent damage to the soil and creation of sediment laden runoff. Such tracks will be removed upon completion of the works. 13.6.50 If there is a requirement to wash vehicles on-site or as they enter, or leave site, this activity should be undertaken in a designated area that is bunded to prevent uncontrolled runoff or release of water from the washing process. All water and runoff arising from vehicle washing will be controlled and treated prior to discharge back into any watercourse. 13.7 Enhancement Measures 13.7.1 No specific hydrological, hydrogeological or ground condition enhancement measures are proposed. 13.8 Assessment of Residual Effects 13.8.1 Table 13.18 presents a summary of the predicted effects identified in this chapter and an assessment of the residual significance of effects following the implementation of mitigation measures identified in the previous section. March 2013 13-32 Copyright Partnerships for Renewables Development Co. Ltd 2013 © Hydrology, Hydrogeology and Ground Conditions
- Page 406 and 407: Camilty Wind Farm (or during any ma
- Page 408 and 409: Camilty Wind Farm while all other s
- Page 410 and 411: Camilty Wind Farm 12.8 Cumulative E
- Page 412 and 413: Camilty Wind Farm stages of develop
- Page 414 and 415: Camilty Wind Farm wind farms are al
- Page 416 and 417: Camilty Wind Farm 12.8.36 Surveys a
- Page 418 and 419: Camilty Wind Farm considered to mat
- Page 420 and 421: Camilty Wind Farm Receptor Sensitiv
- Page 422 and 423: Camilty Wind Farm Receptor Sensitiv
- Page 424 and 425: Camilty Wind Farm • IPCC (2005).
- Page 426 and 427: Camilty Wind Farm 13 Hydrology, Hyd
- Page 428 and 429: Camilty Wind Farm Table 13.1 Criter
- Page 430 and 431: Camilty Wind Farm 13.2.6 Effects ar
- Page 432 and 433: Camilty Wind Farm Baseline Survey G
- Page 434 and 435: Camilty Wind Farm Source Other guid
- Page 436 and 437: Camilty Wind Farm Land-use and Topo
- Page 438 and 439: Camilty Wind Farm Groundwater Flood
- Page 440 and 441: Camilty Wind Farm Table 13.13 Distr
- Page 442 and 443: Camilty Wind Farm Public Water Supp
- Page 444 and 445: Camilty Wind Farm Table 13.16 Sensi
- Page 446 and 447: Camilty Wind Farm Table 13.17 Compa
- Page 448 and 449: Camilty Wind Farm 13.5.32 The site
- Page 450 and 451: Camilty Wind Farm Superficial Depos
- Page 452 and 453: Camilty Wind Farm 110% of the fuel
- Page 454 and 455: Camilty Wind Farm • Improving wat
- Page 458 and 459: Camilty Wind Farm Table 13.18 Summa
- Page 460 and 461: Camilty Wind Farm Receptor Effect D
- Page 462 and 463: Camilty Wind Farm • Scottish Gove
- Page 464 and 465: Camilty Wind Farm (as shown on Figu
- Page 466 and 467: Camilty Wind Farm at the time of oc
- Page 468 and 469: Camilty Wind Farm Criteria for Magn
- Page 470 and 471: Camilty Wind Farm • “The locati
- Page 472 and 473: Camilty Wind Farm 15.3.11 The econo
- Page 474 and 475: Camilty Wind Farm Land Use 15.3.19
- Page 476 and 477: Camilty Wind Farm 15.3.30 Tourism f
- Page 478 and 479: Camilty Wind Farm • Linlithgow Ca
- Page 480 and 481: Camilty Wind Farm were not availabl
- Page 482 and 483: Camilty Wind Farm • A 5.5 km trai
- Page 484 and 485: Camilty Wind Farm 15.4.6 In additio
- Page 486 and 487: Camilty Wind Farm 15.4.19 Given the
- Page 488 and 489: Camilty Wind Farm exploration of hi
- Page 490 and 491: Camilty Wind Farm • A705 between
- Page 492 and 493: Camilty Wind Farm of the views that
- Page 494 and 495: Camilty Wind Farm Table 15.9 Summar
- Page 496 and 497: Camilty Wind Farm Receptor Effect D
- Page 498 and 499: Camilty Wind Farm Receptor Effect D
- Page 500 and 501: Camilty Wind Farm the justification
- Page 502 and 503: Camilty Wind Farm 16 Summary of Eff
- Page 504 and 505: Camilty Wind Farm Table 16.2 Summar
<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />
March 2013<br />
be near the adjacent peat surface and cross-drains will be installed at or just below the track<br />
surface. These measures will ensure that runoff within the upper peat layer (acrotelm) is not<br />
blocked by the track. The track base will be constructed using suitably permeable graded<br />
material such that the slow movement of water in the deeper peat layers is not significantly<br />
affected by the track.<br />
Stream Crossings<br />
13.6.34 The location of the proposed stream crossings on site are shown in Figure 13.1. The<br />
alignment of the new site access tracks has been optimised to avoid the need <strong>for</strong> stream<br />
crossings where possible. As such, only 2 new stream crossings will be required. A stream<br />
crossing survey was undertaken and results are presented in Appendix 13.3.<br />
13.6.35 Confirmation of the level of any CAR authorisations required <strong>for</strong> the new stream crossings will<br />
be confirmed with SEPA in advance.<br />
13.6.36 The new crossing structures will not <strong>for</strong>m a barrier to river flows (low flows and flood flows)<br />
and aquatic fauna, and will be designed and constructed with respect to relevant guidance<br />
and best practice. For example, the crossing over the Crosswood Burn (x2) will be<br />
constructed using a bridge structure spanning the river channel and the floodplain. The<br />
crossing over the Powfastle Burn (x1) will be constructed using a single span structure such<br />
as a bottomless arch structure.<br />
13.6.37 Where access tracks cross artificial drainage ditches, simple pipe structures will be installed<br />
in accordance with the Forests and Water guidance document. The pipe invert levels will be<br />
installed slightly below upstream and downstream bed levels to ensure that barriers <strong>for</strong> fish<br />
passage and sediment transport are minimised. Any potential effects arising from the artificial<br />
drainage on aquatic habitats is presented in Chapter 11: Terrestrial Ecology.<br />
13.6.38 Streams, crossings and drainage ditches will be inspected and cleared regularly to prevent<br />
blockages and remove the risk of flooding throughout the construction and operational life of<br />
the wind farm.<br />
On-site Buildings<br />
13.6.39 On-site welfare facilities will be adequately designed and maintained to ensure all wastewater<br />
and sewage is disposed of appropriately. This disposal is likely to take the <strong>for</strong>m of either a<br />
closed on-site septic tank with tankering offsite <strong>for</strong> disposal or a suitable on-site treatment<br />
system with discharge to soakaway. Design of the final system will require further<br />
consultation with and authorisation from SEPA.<br />
13.6.40 Rainfall on roofs will be collected in a rainwater tank <strong>for</strong> re-use within the building. Any<br />
excess rainwater will be discharged to groundwater or surface water.<br />
13.6.41 The sizing and location of the various elements of the drainage system will be influenced by<br />
the topography, gradient and catchment runoff characteristics and the volumes of runoff<br />
intercepted by each drain. These factors will be determined at the detailed design stage.<br />
Cables<br />
13.6.42 Where cables are required to be buried, the following mitigation shall be put in place:<br />
• Excavations <strong>for</strong> trenches will be of minimal size necessary to undertake works;<br />
• Cable trenches will be dug, cables laid and filled in sections to minimise the areas of<br />
active excavation open at any one time;<br />
13-31<br />
Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />
Hydrology, Hydrogeology and Ground Conditions