<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Consultee Response Where and How Addressed<br />

unless it was being modified as a result of the<br />

wind farm construction (<strong>for</strong> example, felling of<br />

coupes not otherwise scheduled <strong>for</strong> felling in the<br />

Forest Design Plan, and felling of trees <strong>for</strong><br />

keyholes etc).<br />

BBC<br />

<strong>Wind</strong>farms<br />

Tool (15 Nov<br />

2011)<br />

Ofcom (15<br />

Nov 2011)<br />

Everything<br />

Everywhere<br />

(29 Nov 12)<br />

BT (26 Nov<br />

12)<br />

JRC (10 Dec<br />

12<br />

Atkins Ltd (16<br />

Nov 12)<br />

Scotland Gas<br />

Networks (13<br />

Oct 11)<br />

Scottish<br />

Power (17 Oct<br />

11)<br />

Consultation on proposed 6T layout<br />

Not likely to affect any homes <strong>for</strong> whom there is<br />

no alternative off-air service. May affect up to 92<br />

homes <strong>for</strong> whom there may be an alternative offair<br />

service. The transmitters likely to be affected<br />

are: Black Hill Ch5, Craigkelly Ch5, Angus, Black<br />

Hill, Craigkelly.<br />

Consultation on proposed 6T layout<br />

Highlighted 4 fixed links (based on 1km radius<br />

from centre NGR NT0565059350 (plus additional<br />

500m) - 3 BT, 1 Everything Everywhere<br />

There are no Orange m/w links affected by this<br />

application.<br />

The project should not cause interference to BT’s<br />

current and presently planned radio networks<br />

(electromagnetic and point-to-point microwave<br />

radio links).<br />

Cleared with respect to radio link infrastructure<br />

operated by Scottish Power and Scotia Gas<br />

Networks<br />

No objection to proposal<br />

Scotland Gas networks has no gas mains in the<br />

area.<br />

Records showing positions of known Scottish<br />

Power apparatus provided. No apparatus was<br />

present in the main body of the site – but a mast<br />

and some cabling follows the proposed access<br />

track in the west of the site, from the B7008.<br />

Acknowledged – this aspect is<br />

not assessed further, due to the<br />

predicted small level of effect.<br />

Any issues arising on the 92<br />

homes can be addressed on a<br />

case-by-case basis, through<br />

post-construction consultation<br />

with owners of any affected<br />

properties. Mitigation methods<br />

could include upgrading the<br />

existing aerial systems,<br />

sourcing the signals from a<br />

different transmitter, using an<br />

existing cable system or<br />

receiving signals via a satellite.<br />

The most appropriate mitigation<br />

will be discussed with Ofcom<br />

and the broadcasters should it<br />

be required Potential effects on<br />

TV reception will be investigated<br />

<strong>for</strong> affected properties <strong>for</strong> up to<br />

one year after the proposed<br />

wind farm becomes operational.<br />

These operators were consulted<br />

as below.<br />

This in<strong>for</strong>mation was taken<br />

account of in site design.<br />

March 2013 2-16 ES Chapter 2<br />

The EIA and Scoping Process<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©