07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Receptor Effect Development<br />

Phase<br />

Sensitivity/<br />

Conservation<br />

Value of<br />

Receptor<br />

Magnitude of<br />

Change/Effect<br />

Level of<br />

Effect (and<br />

significance)<br />

Prior to<br />

Mitigation<br />

Mitigation Enhancement Level of<br />

Effect and<br />

Significance<br />

after<br />

Mitigation<br />

bog International significant) (not<br />

significant)<br />

Nature of Effect<br />

temporary.<br />

Marshy<br />

grassland<br />

Construction Low/Local Small Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Direct, negative,<br />

temporary.<br />

Semiimproved<br />

acid<br />

grassland<br />

Construction Low/Local Small Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

N/A<br />

Watercourses Construction Low/Local Small Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Direct, negative,<br />

temporary.<br />

Otter Disturbance,<br />

displacement<br />

and injury due<br />

Construction Low/Local Small Slight or<br />

negligible(not<br />

significant)<br />

to<br />

Bat species construction Construction Low/Local Small Slight or<br />

activities.<br />

negligible (not<br />

significant)<br />

Badger<br />

Construction Low/Local Negligible Negligible<br />

(not<br />

significant)<br />

Pre-construction and pre-felling<br />

checks <strong>for</strong> protected species to be<br />

undertaken by the ECoW.<br />

Specific protection measures <strong>for</strong><br />

protected species (e.g. covering<br />

trenches, pits and pipelines).<br />

Demarcation of working zones to<br />

limit disturbance to species.<br />

Vehicle speed restrictions on site.<br />

Demarcation of working zones to<br />

limit disturbance to species.<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Negligible<br />

(not<br />

significant)<br />

Direct, negative,<br />

temporary.<br />

Direct, negative,<br />

temporary.<br />

N/A<br />

Coniferous<br />

plantation<br />

woodland<br />

Direct habitat<br />

loss through<br />

the installation<br />

Construction Low/Local Large Moderate to<br />

Slight (not<br />

significant)<br />

Preparation and<br />

implementation<br />

of HSEMS<br />

- Negligible<br />

(not<br />

significant)<br />

Direct, negative,<br />

permanent.<br />

March 2013 11-48 ES Chapter 11<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©<br />

Terrestrial Ecology

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!