<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Table 11.20 Potential Unmitigated Effects and Associated Significance of Effects of<br />

Disturbance, Displacement and Injury of Terrestrial Protected Species during<br />

Maintenance Activities and Operation<br />

Species Sensitivity Magnitude Level of Effect (and<br />

significance)<br />

Otter Low Negligible Negligible (not significant)<br />

Bat species (soprano pipistrelle, common<br />

pipistrelle)<br />

Low Small Slight (not significant)<br />

Badger Low Negligible Negligible (not significant)<br />

Habitat Change<br />

11.6.34 During the construction of the proposed wind farm infrastructure, habitats may undergo<br />

change due to soil disturbance where soils are excavated and subsequently restored, such<br />

as around turbine bases or to create road batters. Areas where temporary construction<br />

works are proposed, such as in laydown areas, will also undergo some degree of temporary<br />

disturbance to habitats. As the habitats on site are dominated by commercial <strong>for</strong>estry, it<br />

should be taken into account that these habitats are already heavily modified from the<br />

natural state. Table 11.21 below shows the areas of calculated habitat change taken into<br />

account in this assessment.<br />

Table 11.21 Areas of Habitat Change and Temporary Loss Due to <strong>Wind</strong> <strong>Farm</strong><br />

Establishment<br />

Aspect of development Phase 1<br />

code<br />

Phase 1 description<br />

Area of habitat<br />

change (m2)<br />

Construction compound A1.2.2 Coniferous woodland - plantation 2485.9<br />

Met mast laydown area A1.2.2 Coniferous woodland - plantation 1331.3<br />

Tracks 25m buffer<br />

A1.2.2 Coniferous woodland - plantation 35489.9<br />

A4.2 Coniferous woodland - recently felled 7141.4<br />

E1.7 Wet modified bog* 207.2*<br />

Track 201.6<br />

Met mast 25m buffer A1.2.2 Coniferous woodland - plantation 1172.8<br />

Substation compound 25m<br />

buffer<br />

Construction compound 5m<br />

buffer<br />

A1.2.2 Coniferous woodland - plantation 1893.4<br />

A1.2.2 Coniferous woodland - plantation 643.7<br />

Laydown area 5m buffer A1.2.2 Coniferous woodland - plantation 416.8<br />

* this area is not anticipated to be lost/changed although it <strong>for</strong>ms part of the buffer around the tracks. The purpose<br />

of the buffer is to keep the area around the tracks free <strong>for</strong> turbine/ construction movements. It will not be stripped to<br />

use as a working area.<br />

11.6.35 As a result of the construction and establishment of infrastructure across the site, including<br />

turbine bases and access tracks, changes in the hydrological functioning of the site (detailed<br />

March 2013 11-37 ES Chapter 11<br />

Terrestrial Ecology<br />