Camilty Wind Farm 8.5.28 The following Charts 8.3 to 8.13 present the predicted operational scheme noise levels against the prevailing background and derived limits for quiet day and night time. Chart 8.3: Aberlyne - Operational noise assessment 55 50 45 LA90,10min (dB) 40 35 30 25 20 Operational noise Prevailing background (Quiet Daytime) Prevailing background (Night time) Operational limits (Quiet Daytime) Operational limits (Night time) 4 5 6 7 8 9 10 11 12 Wind speed (m/s) Chart 8.4: Camilty Lodge - Operational noise assessment 55 50 LA90,10min (dB) 45 40 35 30 25 20 Operational noise Prevailing background (Quiet Daytime) Prevailing background (Night time) Operational limits (Quiet Daytime) Operational limits (Night time) 4 5 6 7 8 9 10 11 12 Wind speed (m/s) March 2013 8-17 ES Chapter 8 Noise Copyright Partnerships for Renewables Development Co. Ltd 2013 ©
Camilty Wind Farm Chart 8.5: Colzium - Operational noise assessment 60 55 50 LA90,10min (dB) 45 40 35 30 25 20 4 5 6 7 8 9 10 11 12 Wind speed (m/s) Operational noise Prevailing background (Quiet Daytime) Prevailing background (Night time) Operational limits (Quiet Daytime) Operational limits (Night time) Chart 8.6: Crosswoodburn - Operational noise assessment 55 50 LA90,10min (dB) 45 40 35 30 25 20 Operational noise Prevailing background (Quiet Daytime) Prevailing background (Night time) Operational limits (Quiet Daytime) Operational limits (Night time) 4 5 6 7 8 9 10 11 12 Wind speed (m/s) March 2013 8-18 ES Chapter 8 Noise Copyright Partnerships for Renewables Development Co. Ltd 2013 ©
- Page 96 and 97: Camilty Wind Farm 5.3.57 Paragraph
- Page 98 and 99: Camilty Wind Farm 5.4.8 The guidanc
- Page 100 and 101: Camilty Wind Farm areas will be req
- Page 102 and 103: Camilty Wind Farm 6 Climate Change
- Page 104 and 105: Camilty Wind Farm 6.2.8 The report
- Page 106 and 107: Camilty Wind Farm carbon savings fr
- Page 108 and 109: Camilty Wind Farm Table 6.1 Propose
- Page 110 and 111: Camilty Wind Farm 7 Traffic and Tra
- Page 112 and 113: Camilty Wind Farm distraction of wi
- Page 114 and 115: Camilty Wind Farm Table 7.2 Establi
- Page 116 and 117: Camilty Wind Farm 7.3.7 The WLLP al
- Page 118 and 119: Camilty Wind Farm TEMPRO for predic
- Page 120 and 121: Camilty Wind Farm • A length of m
- Page 122 and 123: Camilty Wind Farm construction brea
- Page 124 and 125: Camilty Wind Farm Table 7.8 Constru
- Page 126 and 127: Camilty Wind Farm vehicle speeds, i
- Page 128 and 129: Camilty Wind Farm Table 7.9 Summary
- Page 130 and 131: Camilty Wind Farm 8 Noise 8.1 Intro
- Page 132 and 133: Camilty Wind Farm • The duration
- Page 134 and 135: Camilty Wind Farm 8.3.4 The benefit
- Page 136 and 137: Camilty Wind Farm Baseline Noise Mo
- Page 138 and 139: Camilty Wind Farm Chart 8.1: Parkvi
- Page 140 and 141: Camilty Wind Farm Prevailing Backgr
- Page 142 and 143: Camilty Wind Farm Construction on S
- Page 144 and 145: Camilty Wind Farm 8.5.23 These cons
- Page 148 and 149: Camilty Wind Farm Chart 8.7: Halfwa
- Page 150 and 151: Camilty Wind Farm Chart 8.11: Over
- Page 152 and 153: Camilty Wind Farm Table 8.10 Differ
- Page 154 and 155: Camilty Wind Farm • Deliveries sh
- Page 156 and 157: Camilty Wind Farm 8.8 Cumulative Ef
- Page 158 and 159: Camilty Wind Farm Chart 8.16: Colzi
- Page 160 and 161: Camilty Wind Farm Chart 8.20: Harbu
- Page 162 and 163: Camilty Wind Farm Chart 8.24: Whist
- Page 164 and 165: Camilty Wind Farm 8.8.15 Chart 8.26
- Page 166 and 167: Camilty Wind Farm 9 Landscape and V
- Page 168 and 169: Camilty Wind Farm • The Scottish
- Page 170 and 171: Camilty Wind Farm • Select an app
- Page 172 and 173: Camilty Wind Farm 9.2.34 The potent
- Page 174 and 175: Camilty Wind Farm viewpoint locatio
- Page 176 and 177: Camilty Wind Farm landscape’ (par
- Page 178 and 179: Camilty Wind Farm Table 9.5 Recepto
- Page 180 and 181: Camilty Wind Farm Significance of E
- Page 182 and 183: Camilty Wind Farm character. Where
- Page 184 and 185: Camilty Wind Farm 9.3.10 Although t
- Page 186 and 187: Camilty Wind Farm • Harburn House
- Page 188 and 189: Camilty Wind Farm Local plans shoul
- Page 190 and 191: Camilty Wind Farm • Pateshill •
- Page 192 and 193: Camilty Wind Farm settings; however
- Page 194 and 195: Camilty Wind Farm • Urban 9.3.54
<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />
8.5.28 The following Charts 8.3 to 8.13 present the predicted operational scheme noise levels<br />
against the prevailing background and derived limits <strong>for</strong> quiet day and night time.<br />
Chart 8.3: Aberlyne - Operational noise assessment<br />
55<br />
50<br />
45<br />
LA90,10min (dB)<br />
40<br />
35<br />
30<br />
25<br />
20<br />
Operational noise<br />
Prevailing background (Quiet Daytime)<br />
Prevailing background (Night time)<br />
Operational limits (Quiet Daytime)<br />
Operational limits (Night time)<br />
4 5 6 7 8 9 10 11 12<br />
<strong>Wind</strong> speed (m/s)<br />
Chart 8.4: <strong>Camilty</strong> Lodge - Operational noise assessment<br />
55<br />
50<br />
LA90,10min (dB)<br />
45<br />
40<br />
35<br />
30<br />
25<br />
20<br />
Operational noise<br />
Prevailing background (Quiet Daytime)<br />
Prevailing background (Night time)<br />
Operational limits (Quiet Daytime)<br />
Operational limits (Night time)<br />
4 5 6 7 8 9 10 11 12<br />
<strong>Wind</strong> speed (m/s)<br />
March 2013 8-17 ES Chapter 8<br />
Noise<br />
Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©