07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

Prevailing Background Noise Levels at all Properties to be used as Proxies<br />

8.3.37 Tables 8.2 and 8.3 respectively summarise the results of the quiet daytime and night time<br />

baseline noise monitoring (L A90,10min ) undertaken at Parkview Cottages (Charts 8.1 and 8.2<br />

above) as well as the quiet daytime and night time prevailing background noise levels at each<br />

wind speed <strong>for</strong> Harburnhead 3 , Aberlyn 4 and Halfwayhouse 5 extracted from the Harburnhead<br />

and Fauch Hill ES Chapters (Appendix 8.6).<br />

Table 8.2 Prevailing Quiet Daytime Background Noise Levels (LA90,10min) (dB)<br />

Derived from Baseline Noise Surveys<br />

Monitoring<br />

location<br />

<strong>Wind</strong> speed (m/s) derived to 10 m above local ground height<br />

4 5 6 7 8 9 10 11 12<br />

Parkview Cottages 31 32 34 35 37 40 42 45 47<br />

Harburnhead 28 30 32 35 38 41 44 46 48<br />

Aberlyn 33 35 38 42 46 47 47 47 47<br />

Halfwayhouse 34 34 34 36 37 40 43 47 51<br />

Table 8.3 Prevailing Night Time Background Noise Levels (LA90,10min) (dB) Derived<br />

from Baseline Noise Surveys<br />

Monitoring<br />

location<br />

<strong>Wind</strong> speed (m/s) derived to 10 m above local ground height<br />

4 5 6 7 8 9 10 11 12<br />

Parkview Cottages 27 29 30 33 35 38 41 44 48<br />

Harburnhead 23 25 28 32 35 39 43 46 49<br />

Aberlyn 28 30 34 39 44 47 47 47 47<br />

Halfwayhouse 28 30 32 34 37 39 41 42 42<br />

8.3.38 These prevailing quiet day and night time background noise levels have been used to derive<br />

appropriate operational noise limits at each wind speed, against which the predicted scheme<br />

and cumulative operational noise levels have been assessed. This assessment is discussed<br />

in detail later in this chapter.<br />

8.4 Topic Specific Design Evolution<br />

8.4.1 As described in Chapter 3: Design Evolution, an initial buffer of 750 m was placed on all<br />

identified residential properties in order to minimise the likelihood of potential NSRs<br />

experiencing significant noise effects from the operational turbines.<br />

3 Harburnhead <strong>Wind</strong>farm ES Table 12.5 Prevailing background noise levels<br />

4 Harburnhead <strong>Wind</strong>farm ES Table 12.5 Prevailing background noise levels<br />

5 Fauch Hill <strong>Wind</strong>farm ES Figures 9.6 & 9.7<br />

March 2013 8-11 ES Chapter 8<br />

Noise<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!