<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

construction breakdown and timeline is shown at Appendix 7.3 and shows that this equates<br />

to between four and nine HGV arrivals per day.<br />

Construction Worker / Vans / Light Good Vehicles Trip Generation<br />

7.5.19 It is expected that the construction process will require a maximum of up to 219 light vehicle<br />

movements per month (construction staff and light vehicle deliveries). Over the six month<br />

period, there would be a maximum of 1,033 light vehicle arrivals, equating to 2,066 two-way<br />

light vehicle movements, as set out at Appendix 7.3.<br />

7.5.20 Based on a five day working week this equates to up to 10 arrivals per day during this period<br />

(20 two-way light vehicle movements a day).<br />

Total Construction Generated Vehicles<br />

7.5.21 Table 7.6 shows the estimated daily vehicle movements generated in line with the<br />

construction programme and based on a five day working week. It should be noted that some<br />

construction activity may occur during Saturdays (see Chapter 4), however, assuming a 5<br />

day construction period <strong>for</strong> each week is considered as providing a worst case scenario<br />

assessment i.e. a greater number of movements per day will be assumed.<br />

7.5.22 These have been calculated by taking the maximum number of vehicle movements during a<br />

single month and calculating the average number of daily vehicle movements during this<br />

period. Table 7.6 sets out the number of vehicle movements on an average day during the<br />

busiest month of the construction process.<br />

Table 7.6 Daily Construction Traffic Flows<br />

Construction HGV<br />

(excl abnormal<br />

loads) *<br />

Abnormal loads<br />

Construction<br />

Workers / Light<br />

Goods Vehicles<br />

Total Vehicle Trips<br />

In<br />

Out<br />

Two<br />

Way<br />

In<br />

Out<br />

Two<br />

Way<br />

In<br />

Out<br />

Two<br />

Way<br />

In<br />

Out<br />

Two<br />

Way<br />

Apr-13 9 9 18 0 0 0 6 6 12 15 15 30<br />

May-13 8 8 16 0 0 0 6 6 12 14 14 28<br />

Jun-13 8 9 17 1 0 1 10 10 20 19 19 38<br />

Jul-13 8 9 17 1 0 1 10 10 20 19 19 38<br />

Aug-13 7 8 15 1 0 1 9 9 18 17 17 34<br />

Sep-13 4 4 8 0 0 0 7 7 14 11 11 22<br />

* Includes departing abnormal loads as a standard HGV<br />

7.5.23 Over the entire construction period, it is expected that the daily HGV movements (excluding<br />

abnormal loads) would be between eight and 18 two-way movements per working day. The<br />

number of vehicle movements generated by construction workers and vans would be<br />

between 12 and 20 two-way light vehicle movements per working day.<br />

7.5.24 With consideration to all vehicles, the total number of vehicle movements would be between<br />

22 and 38 two-way movements per working day.<br />

March 2013 7-13 ES Chapter 7<br />

Traffic and Transport<br />