07.02.2014 Views

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

Camilty Wind Farm - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong><br />

areas will be required in order to enable consideration of all likely landscape and visual<br />

effects.<br />

5.4.24 The consultative draft study identifies the Upland Hill Fringes unit 2(ii) within which the<br />

proposed windfarm is located as a medium sensitivity where some wind energy development<br />

could be acceptable. Landscape accommodation is considered the most appropriate<br />

objective (rather than landscape protection or landscape change), where suitably designed<br />

wind energy developments which generally fit within the landscape could potentially be<br />

accommodated even though they may have an impact on the landscape locally. Unit 2 (ii) is<br />

assessed as having medium / low capacity. The key considerations <strong>for</strong> wind energy<br />

developments within unit 2 (ii) are identified as cumulative effects with Blacklaw (including<br />

approved extension), Pates Hill, Muirhall and possibly Tormywheel wind farms as well as<br />

impacts on views from the A706 and the Fauldhouse Rail Core Path.<br />

5.5 Conclusions<br />

5.5.1 This Chapter has set out the relevant EU, UK and Scottish climate change and renewable<br />

energy policy framework. It has identified the planning policies and material considerations<br />

relevant to the determination of the proposed <strong>Camilty</strong> <strong>Wind</strong> <strong>Farm</strong>. A detailed assessment of<br />

the acceptability of the proposed wind farm, in relation to the policies contained within this<br />

chapter, is the subject of a separate supporting Planning Statement which will accompany the<br />

planning application.<br />

5.6 References<br />

• BERR (Department <strong>for</strong> Business Enterprise & Regulatory Re<strong>for</strong>m) (2008), UK Energy<br />

in Brief, [online]. Available at:<br />

http://webarchive.nationalarchives.gov.uk/+/http://www.berr.gov.uk/files/file46983.pdf<br />

[Accessed 3 January 2013]<br />

• City of Edinburgh Council, East Lothian Council, Midlothian Council, West Lothian<br />

Council (2004), Edinburgh and the Lothians Structure Plan 2015, [online]. Available<br />

at: http://www.elsp.gov.uk/Downloads/ELSP_Approved_Complete_doc.pdf [Accessed<br />

3 January 2013]<br />

• David Tyldesley and Associates (2011) Consultative Draft Landscape Capacity Study<br />

<strong>for</strong> <strong>Wind</strong> Energy Development in West Lothian, Final December 2011, [online[.<br />

Available<br />

at:<br />

http://www.westlothian.gov.uk/media/downloaddoc/1799514/1841832/1875738/23305<br />

56/LCS_windenergyinWL [Accessed 3 January 2011]<br />

• DECC (2011), UK Renewable Energy Roadmap, [online]. Available at:<br />

http://www.decc.gov.uk/assets/decc/11/meeting-energy-demand/renewableenergy/2167-uk-renewable-energy-roadmap.pdf<br />

[Accessed 3 January 2013]<br />

• DTI (Department of Trade and Industry) (2007), Meeting the Energy Challenge: A<br />

White Paper on Energy, [online]. Available at: http://www.dti.gov.uk/files/file39387.pdf<br />

[Accessed 3 January 2013]<br />

• Edinburgh and South East Scotland Strategic Development Planning Authority (2011),<br />

Proposed Plan, [online]. Available at:<br />

March 2013 5-15 ES Chapter 5<br />

Planning Policy Overview<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> Development Co. Ltd 2013 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!