Major BOP vendors available in the country Sl. No Name of BOP No. of Vendors 1 Coal Handling Plant(CHP) 8 2 Ash Handling Plant (AHP) 9 3 Demineralized (DM) water Plant 5 4 Cooling Tower 5 5 Chimney 4 6 Fuel Oil (FO) System 4 7 Water Treatment Plant 5 8 CW System 3 9 Control & Instrumentation (C&I) 4 10 Switchyard/Switchgear (HT/LT) 5 11 Structural steel erection 3 12 Fire protection System 6 Number of vendors are based on the information available in CEA 7

MAJOR ORDERS PLACED FOR COAL HANDLING PLANT FOR 11 TH PLAN Sl. No. Name of Company No. of orders 1 M/s Techpro System Pvt Ltd. 11 2 M/s L&T 7 3 M/s Elecon Engineering Co. Ltd. 6 4 M/s TRF Ltd. 3 5 M/s ThyssenKrupp Industries India 3 6 Others 27@ 7 Orders yet to be placed 11 Total 68* @ Includes single EPC contracts for BOPs which may have further awarded sub-contracts to the above vendors. * Number of vendors are based on the information available in CEA No. of Coal Handling Plants required during 12 th Plan : 70 8

Major BOP vendors available in the country<br />

Sl. No Name <strong>of</strong> BOP No. <strong>of</strong> Vendors<br />

1 Coal Handling <strong>Plant</strong>(CHP) 8<br />

2 Ash Handling <strong>Plant</strong> (AHP) 9<br />

3 Demineralized (DM) water <strong>Plant</strong> 5<br />

4 Cooling Tower 5<br />

5 Chimney 4<br />

6 Fuel Oil (FO) System 4<br />

7 Water Treatment <strong>Plant</strong> 5<br />

8 CW System 3<br />

9 Control & Instrumentation (C&I) 4<br />

10 Switchyard/Switchgear (HT/LT) 5<br />

11 Structural steel erection 3<br />

12 Fire protection System 6<br />

Number <strong>of</strong> vendors are based on the in<strong>for</strong>mation available in CEA<br />