Manufacturing capabilities for Balance of Plant Equipment for ...
Manufacturing capabilities for Balance of Plant Equipment for ... Manufacturing capabilities for Balance of Plant Equipment for ...
BALANCE OF PLANTS (BOPs) 5
SUMMARY OF REQUIREMENT OF BOPs DURING 10 TH , 11 TH and 12 TH PLAN Sl No Name of BOP No. of BOPs used during 10 th Plan For 21180 MW No. of BOPs reqd. during 11 th Plan Tentative requirement of BOPs in 12 th Plan 1 Coal Handling Plant (CHP) 23 68 70 2 Ash Handling Plant (AHP) 23 69 70 3 Demineralized (DM) water Plant 32 69 70 4 Cooling Tower 41 79 (145) 70 (148) 5 Chimney 36 79 (117) 77 (148) 6 Fuel Oil (FO) System 22 71 70 7 Water Treatment Plant 36 76 70 Note: Due to higher unit size, number of BOPs may be less but their capacity may be higher 6
- Page 1 and 2: INTERNATIONAL CONCLAVE ON KEY INPUT
- Page 3 and 4: CAPACITY COMMISSIONED AND UNDER CON
- Page 5: TENTATIVE THERMAL CAPACITY ADDITION
- Page 9 and 10: MAJOR ORDERS PLACED FOR COAL HANDLI
- Page 11 and 12: MAJOR ORDERS PLACED FOR DM PLANT FO
- Page 13 and 14: MAJOR ORDERS PLACED FOR CHIMNEY FOR
- Page 15 and 16: ISSUES FOR COMPLETION OF BOPs IN TI
- Page 17 and 18: LOSS TO THE UTILITIES ON ACCOUNT OF
BALANCE OF PLANTS<br />
(BOPs)<br />
5