Sl.<br />

No.<br />

MAJOR ORDERS PLACED FOR COOLING TOWERS<br />

FOR 11 TH PLAN<br />

Name <strong>of</strong> Vendor<br />

No. <strong>of</strong> orders<br />

1 M/s Paharpur Cooling Towers 25 [49]<br />

2 M/s Gammon (I) Ltd. 17 [30]<br />

3 M/s BGR 4 [4]<br />

4 M/s NBCC 2 [2]<br />

5 Others 21[41]@<br />

6 Orders yet to be placed 10 [19]<br />

Total 79[145] *<br />

@ Includes single EPC contracts <strong>for</strong> BOPs which may have further awarded sub-contracts<br />

to the above vendors.<br />

Figures in [ ] indicate number <strong>of</strong> cooling towers.<br />

* Number <strong>of</strong> vendors are based on the in<strong>for</strong>mation available in CEA<br />

No. <strong>of</strong> Cooling Towers required during 12 th Plan : 70 [148]<br />