06.02.2014 Views

Manufacturing capabilities for Balance of Plant Equipment for ...

Manufacturing capabilities for Balance of Plant Equipment for ...

Manufacturing capabilities for Balance of Plant Equipment for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAJOR ORDERS PLACED FOR ASH HANDLING<br />

PLANT FOR 11 TH PLAN<br />

Sl.<br />

No<br />

Name <strong>of</strong> Company<br />

No. <strong>of</strong> orders<br />

1 M/s Indure 12<br />

2 M/s Mecawber Beekay 11<br />

3 M/s D C Industrial <strong>Plant</strong> Services 5<br />

4 M/s Mahindra Ash Technology 4<br />

5 M/s Techpro Ash Tech. Ltd. 5<br />

6 M/s Macnally Bharat 3<br />

7 Others 19@<br />

8 Orders yet to be placed 10<br />

Total 69*<br />

@ Includes single EPC contracts <strong>for</strong> BOPs which may have further awarded subcontracts<br />

to the above vendors.<br />

* Number <strong>of</strong> vendors are based on the in<strong>for</strong>mation available in CEA<br />

No. <strong>of</strong> Ash Handling <strong>Plant</strong>s required during 12 th Plan : 70<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!