- Page 1 and 2:
REQUEST FOR PROPOSALS FOR FACILITIE
- Page 3 and 4:
2.15 CHANGE OF LAW 2.16 SEVERABILIT
- Page 5 and 6:
FACILITIES MANAGEMENT SERVICES 1 OV
- Page 7 and 8:
Proposer no later than one (1) week
- Page 9 and 10: wishes to purchase equipment in exc
- Page 11 and 12: clerical support necessary to clean
- Page 13 and 14: Contractor will also show how it wi
- Page 15 and 16: 2 GENERAL PROVISIONS 2.1 CONTRACT D
- Page 17 and 18: 2.4 CONTRACTORS GENERAL CONDITIONS
- Page 19 and 20: the Contract by Contractor; (iii) a
- Page 21 and 22: warrants to the District that it wi
- Page 23 and 24: 2.8.8 Termination of Contract: All
- Page 25 and 26: 2.10.13 Non-answering of Cell Phone
- Page 27 and 28: 2.17 TERMINATION In the event the C
- Page 29 and 30: The Contractor may choose to schedu
- Page 31 and 32: 3.1 MANAGEMENT The Contractor will
- Page 33 and 34: Slips/Trips/Falls Spray Buffing Str
- Page 35 and 36: shall be reported immediately. A wr
- Page 37 and 38: systems shall not interfere with th
- Page 39 and 40: successfully made and or there is n
- Page 41 and 42: performed. The schedule shall inclu
- Page 43 and 44: 4.4 POSITION SPECIFICS 4.4.1 Direct
- Page 45 and 46: Personnel responsible for the opera
- Page 47 and 48: quantity at the site for up to 30 d
- Page 49 and 50: (2) 30 day verification inspection
- Page 51 and 52: the attention of the Director of Fa
- Page 53 and 54: 4.17 REQUIRED REPORTS and SUBMITTAL
- Page 55 and 56: 4.20.1 Utilities: Utilities for Dis
- Page 57 and 58: 5.1.6 Garden Care: Cultivate weeds
- Page 59: fees. The use of the facilities’
- Page 113 and 114:
APPENDIX C CLEANING GUIDE AUDITORIU
- Page 115 and 116:
CLEANING GUIDE CLASSROOM PROCEDURE
- Page 117 and 118:
CLEANING GUIDE CORRIDORS AND STAIRW
- Page 119 and 120:
CLEANING GUIDE MEDIA CENTER PROCEDU
- Page 121 and 122:
CLEANING GUIDE RESTROOMS PROCEDURE
- Page 123 and 124:
APPENDIX D Gross Square Footage Dat
- Page 125 and 126:
Appendix E Custodial Equipment 2-Ju
- Page 127 and 128:
Building Equip. Description Serial
- Page 129 and 130:
Building Equip. Description Serial
- Page 131 and 132:
Building Equip. Description Serial
- Page 133 and 134:
Building Equip. Description Serial
- Page 135 and 136:
Building Equip. Description Serial
- Page 137 and 138:
Building Equip. Description Serial
- Page 139 and 140:
Building Equip. Description Serial
- Page 141 and 142:
Building Equip. Description Serial
- Page 143 and 144:
9. 111900_BIB H140,Super Shine All
- Page 145 and 146:
Appendix G Maintenance Equipment 2-
- Page 147 and 148:
Appendix H FACILITIES MANAGEMENT SE
- Page 149 and 150:
and supplies for each Facility. Inv
- Page 151 and 152:
84 of 2006, as amended, the Contrac
- Page 153 and 154:
SAGINAW PUBLIC SCHOOL DISTRICT By:_
- Page 155 and 156:
• Back Flow/Cross Connection Test
- Page 157:
Mannion Rd Corral Dr Elm St Hill St