REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...
REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...
REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5.1.6 Garden Care:<br />
Cultivate weeds and define turf edges of all beds. All debris is to be removed.<br />
Condition shrubbery beds including ground cover areas with peat moss or mulch (all beds).<br />
5.1.7 Trimming of Shrubs:<br />
Trimming and shaping of evergreens, shrubbery and hedges.<br />
5.1.8 Seed Placement:<br />
General care repairing of damaged lawn areas with the “FX Method” of 50/50 soil mixture<br />
together with seed blown to damaged areas.<br />
5.1.9 Catch Basin Cleaning:<br />
Monthly, general care, cleaning of catch basin/swales, adjacent to turf and tree beds.<br />
5.1.10 Irrigation:<br />
Start-up, adjusting and winterization of the irrigation systems. Contractor will be responsible<br />
for the winterization of all irrigation systems and their re-start in the spring. Contractor will<br />
reset and adjust watering heads as needed. The irrigation system shall be winterized no<br />
later than November 1 st and have them resume operation no later than May 15th. Repairs<br />
to the irrigation system will be based on a time and material basis. Such repair must be preapproved<br />
by The School District of the City of Saginaw.<br />
5.1.11 Cigarette Butts and Trash:<br />
The School District of the City of Saginaw facility grounds must be free of cigarette butts and<br />
debris. Any trash and debris on the School District property will be picked up and disposed<br />
of on a weekly basis. Parking lots, sidewalks, stairs, loading areas, alleys shall be kept<br />
clear of trash and debris.<br />
5.1.12 Parking Lot Sweeping:<br />
Parking lots, sidewalks, stairs, loading areas, alleys shall be kept clear of trash and debris.<br />
Due to the size of some the School Districts facilities, the Contractor may use automated<br />
(street sweepers) equipment to accomplish this task. Sidewalks, parking lots, outside stairs,<br />
outdoor recreation areas to be sweep and kept free of debris a minimum of twice per year.<br />
Road sweeping material must be dumped at an approved site. Contractor may not use any<br />
of The School District of the City of Saginaw’s trash dumpsters without permission.<br />
5.1.13 Spring/Fall Cleanup:<br />
Remove and dispose of all debris that has accumulated on the outside grounds of The<br />
School District of the City of Saginaw property twice per year (2 times per year; Spring and<br />
Fall). Debris shall be considered, but not be limited to, trash, paper, leaves, dead foliage,<br />
etc. Raking of the beds and lawns as needed. Contractor shall repair any damage to the<br />
grass or beds damaged during their operations.<br />
5.1.14 Snow Removal:<br />
The School District of the City of Saginaw uses a two inch rule during the winter months.<br />
The district does not begin plowing until a minimum of two inches of snow has fallen. No<br />
plowing of parking lots will be allowed when employee’s vehicles are present. Contractor<br />
shall adjust the hours of employees during snow days to minimize overtime. All plowing<br />
shall occur during evening hours on school days. When the superintendent of schools has<br />
chosen to close school due to inclement weather, the snow crew may plow during the<br />
daytime hours, realizing there may be employees present. The contractor will be held liable<br />
for any damage to district property and employee’s vehicles.<br />
5.2 SUMMER MONTHS:<br />
During the months of June, July and August (this period may be extended due to climate), all<br />
ornamental trees and shrubs shall be inspected for pests, fungus, rust and other blights that may