05.02.2014 Views

REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...

REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...

REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The Contractor shall schedule certification testing such that all equipment or facilities remain<br />

in certification. All certifications required less frequently than annually (i.e., every 2 years,<br />

every 3 years, every 5 years, etc.) shall be scheduled and performed initially during the<br />

Base Year. The Contractor may request to delay the initial performance into option years by<br />

developing and submitting to the Director of Facility Services, specific justification for the<br />

delay and a detailed schedule for all performance years.<br />

4.2.15 Miscellaneous:<br />

As part of basic services, the Contractor shall move furniture and equipment in the<br />

immediate area of the worksite(s) if required to accomplish any services included in this<br />

contract. In addition, the furniture and/or equipment shall also be relocated back into the<br />

original location after work has been completed. All work shall be done with minimum<br />

interference to District personnel and school operations.<br />

4.3 PERSONNEL<br />

All employees will be under the employment of the Contractor.<br />

4.3.1 Authority:<br />

The Director of Facility Services and Operations Manager shall have full authority to act for<br />

the Contractor on all matters relating to this contract.<br />

4.3.2 Contractor Employees:<br />

The Contractor shall provide adequate numbers of qualified personnel to assure satisfactory<br />

performance of the services required by this contract. The minimum acceptable personnel<br />

qualifications for the positions are shown below. The Contractor shall adhere to any special<br />

certification, licenses, or training requirements required by Federal, State or Local<br />

Jurisdictions. The Contractor shall submit evidence of personnel qualifications to the District<br />

in their Proposal.<br />

Resumes of all other personnel shall be provided to the District 30 days prior to the contract<br />

start date and subsequently any key replacement personnel resumes shall be provided to<br />

the District for approval/ consideration at least twenty one (21) days in advance of when the<br />

Contractor wants the employee to begin work. All replacement personnel shall meet or<br />

exceed all of the original personnel qualification requirements.<br />

The Contractor shall not employ persons for work on this contract who are identified or<br />

suspect to the Contractor as a potential threat to the health, safety, security, general well<br />

being or operational mission of the facilities.<br />

District retains the right to request a replacement of any employee hired by the Contractor.<br />

Job descriptions must be presented to the District 30 days prior to the start of contract and<br />

maintained for each position. Employees hired must meet the necessary qualifications<br />

listed in each of the job descriptions.<br />

4.3.3 Identification:<br />

Contractor employees shall present a neat appearance and be easily recognized as<br />

Contractor employees. This will be accomplished by wearing distinctive clothing bearing the<br />

name of the Contractor, and by wearing badges bearing the Contractor’s name and the<br />

employee’s name. Employees shall be able to read, write, speak, and understand English.<br />

4.3.4 Notification of Key Employee Change:<br />

Contractor shall notify the District prior to key employee replacement.<br />

4.3.5 Replacement Employees:<br />

The Contractor at its cost shall ensure that replacement employees are assigned to cover all<br />

employee absences, such as extended vacation leave, sick leave or separation.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!