REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...
REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...
REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The Contractor shall schedule certification testing such that all equipment or facilities remain<br />
in certification. All certifications required less frequently than annually (i.e., every 2 years,<br />
every 3 years, every 5 years, etc.) shall be scheduled and performed initially during the<br />
Base Year. The Contractor may request to delay the initial performance into option years by<br />
developing and submitting to the Director of Facility Services, specific justification for the<br />
delay and a detailed schedule for all performance years.<br />
4.2.15 Miscellaneous:<br />
As part of basic services, the Contractor shall move furniture and equipment in the<br />
immediate area of the worksite(s) if required to accomplish any services included in this<br />
contract. In addition, the furniture and/or equipment shall also be relocated back into the<br />
original location after work has been completed. All work shall be done with minimum<br />
interference to District personnel and school operations.<br />
4.3 PERSONNEL<br />
All employees will be under the employment of the Contractor.<br />
4.3.1 Authority:<br />
The Director of Facility Services and Operations Manager shall have full authority to act for<br />
the Contractor on all matters relating to this contract.<br />
4.3.2 Contractor Employees:<br />
The Contractor shall provide adequate numbers of qualified personnel to assure satisfactory<br />
performance of the services required by this contract. The minimum acceptable personnel<br />
qualifications for the positions are shown below. The Contractor shall adhere to any special<br />
certification, licenses, or training requirements required by Federal, State or Local<br />
Jurisdictions. The Contractor shall submit evidence of personnel qualifications to the District<br />
in their Proposal.<br />
Resumes of all other personnel shall be provided to the District 30 days prior to the contract<br />
start date and subsequently any key replacement personnel resumes shall be provided to<br />
the District for approval/ consideration at least twenty one (21) days in advance of when the<br />
Contractor wants the employee to begin work. All replacement personnel shall meet or<br />
exceed all of the original personnel qualification requirements.<br />
The Contractor shall not employ persons for work on this contract who are identified or<br />
suspect to the Contractor as a potential threat to the health, safety, security, general well<br />
being or operational mission of the facilities.<br />
District retains the right to request a replacement of any employee hired by the Contractor.<br />
Job descriptions must be presented to the District 30 days prior to the start of contract and<br />
maintained for each position. Employees hired must meet the necessary qualifications<br />
listed in each of the job descriptions.<br />
4.3.3 Identification:<br />
Contractor employees shall present a neat appearance and be easily recognized as<br />
Contractor employees. This will be accomplished by wearing distinctive clothing bearing the<br />
name of the Contractor, and by wearing badges bearing the Contractor’s name and the<br />
employee’s name. Employees shall be able to read, write, speak, and understand English.<br />
4.3.4 Notification of Key Employee Change:<br />
Contractor shall notify the District prior to key employee replacement.<br />
4.3.5 Replacement Employees:<br />
The Contractor at its cost shall ensure that replacement employees are assigned to cover all<br />
employee absences, such as extended vacation leave, sick leave or separation.