unscheduled task requirements not later than the normal duty day close of business. These<br />

daily task requirements shall be distributed to appropriate Contractor personnel in time for<br />

work the next day. The Contractor shall generate and maintain a record of work requests<br />

and resulting accomplished tasks. The Contractor shall provide a summary of completed<br />

work requests by location to the Director of Facility Services or designee twice per month.<br />

4.2.9 Technical Assistance:<br />

The Contractor shall provide technical assistance, to answer technical questions, escort and<br />

work with consultants (hired by the District or Contractor) on building related projects, draw<br />

technical sketches, review technical drawings, and provide advice to District representatives<br />

in all operation, maintenance, repair, and building or system upgrades relating to the<br />

buildings covered by this contract.<br />

4.2.10 Maintenance Management System:<br />

The Contractor shall also be responsible to maintain an equipment history for all service<br />

calls (work orders), repairs, and Preventive Maintenance (PM) performed on each piece of<br />

building equipment in inventory. The Contractor shall update all equipment history records<br />

within 7 days after service calls, repairs, or PM activities have occurred.<br />

4.2.10.1 Changes in Equipment Inventory:<br />

The Contractor shall maintain and update building equipment data.<br />

4.2.10.2 New Facilities:<br />

Following the acceptance of a newly constructed facility (or following major<br />

renovation), all facilities shall be entered into the Contractor's recordkeeping<br />

systems within thirty (30) days.<br />

4.2.11 Preventive Maintenance (PM) and Certification:<br />

The Contractor shall schedule, perform, and document all required PM and equipment<br />

certifications. The Contractor shall be required to provide this log to the District upon<br />

request. PM consists primarily of inspection, cleaning, lubrication, adjustment, calibration,<br />

corrosion control, touch-up painting, and minor part/component replacement (e.g. filters,<br />

belts, hoses, fluids, hardware) as required to increase the reliability and effectiveness of<br />

equipment by minimizing malfunction, breakdown, and deterioration of equipment; and the<br />

identifying of any repairs required to bring the equipment up to the manufacturer’s operating<br />

standards. Preventive maintenance checklists adopted from the R.S. Means recommended<br />

standards, shall serve as the minimum acceptable preventive maintenance performed by<br />

the Contractor. In the absence of checklist being available for a particular piece of<br />

equipment or system, the Contractor shall follow the manufacturer's documented preventive<br />

maintenance standards.<br />

4.2.12 Preventive Maintenance Performance and Scheduling:<br />

4.2.12.1 General Preventive Maintenance:<br />

The Contractor shall perform all PM services required to effectively maintain all<br />

building equipment and systems in accordance with the standards adopted by the<br />

District. The Contractor shall document all PM tasks and activities. The<br />

Contractor shall provide a new PM schedule and task lists and/or modify the<br />

current PM schedule based on current contract requirements and the up-to-date<br />

equipment inventory during the first 30 days of the equipment’s phase-in period.<br />

The Contractor shall produce PM work orders in accordance with the approved<br />

schedule. Subsequently, the Contractor shall review the PM schedule and<br />

equipment inventory on an annual basis and make appropriate adjustments to the<br />

schedule and records accordingly.<br />

4.2.12.2 Special Preventive Maintenance:<br />

The Contractor shall prepare a separate PM schedule for all building equipment<br />

that requires a substantial outage of building systems before PM can be