05.02.2014 Views

REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...

REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...

REQUEST FOR PROPOSALS FOR FACILITIES MANAGMENT ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

other information that the Proposer feels is significant with respect to the School District making an<br />

informed decision relative to the Proposal.<br />

Any exceptions to the terms and conditions contained in the RFP, or the Contract or any other<br />

special considerations or conditions requested or required by the Proposer shall be enumerated by<br />

the Proposer and be submitted as part of its Proposal, together with an explanation as to the reason<br />

such terms and conditions cannot be met. Each Proposer shall be required and expected to meet<br />

the RFP requirements in its entirety, except to the extent exceptions are expressly noted in<br />

Schedule 3 of the Proposal. All pricing factors must be clearly indicated in the Proposer’s Pricing<br />

Schedule provided.<br />

Each Proposer shall submit its Proposal for a 3-year term. Each Proposal shall include a transition<br />

plan.<br />

1.10 PROPOSAL <strong>FOR</strong>MAT<br />

With this RFP are requested Schedules 1-20. The Schedules provide the format for the Proposal<br />

and each Schedule must be completed and submitted for your Proposal to be considered.<br />

1.10.1 Proposers must provide information, which will serve as an introduction of your Contractor<br />

on business letterhead.<br />

1.10.2 Proposers must provide background and qualifications of the personnel who would be<br />

involved with The School District of the City of Saginaw. Describe the chain of command<br />

and reporting relationships. Include a proposed staffing chart and number of full and parttime<br />

employees with titles. (To be referenced as Schedule 1).<br />

1.10.3 Proposers shall complete the point by point response to RFP Requirements/Contract<br />

Specifications/Signatures. (To be referenced as Schedule 2).<br />

1.10.4 Proposers shall state exceptions, including explanations, to RFP Requirements/Contract<br />

and Specifications. (To be referenced as Schedule 3).<br />

1.10.5 Proposers shall provide a Summary Explanation of Proposer’s Pricing/Signatures. (To be<br />

referenced as Schedule 4).<br />

1.10.6 Proposers must provide detailed evidence that they are currently providing Facilities<br />

Management Services for other K-12 schools. Proposers must provide a minimum of<br />

three (3) K-12 Public School references, including contact name, address, phone number,<br />

and email address. (To be referenced as Schedule 5).<br />

1.10.7 Proposers must provide a three year Hourly Pay Rate Table of Contractor employees<br />

placed in The School District of the City of Saginaw. In addition, proposers must include<br />

starting salary rates for new employees. (To be referenced as Schedule 6).<br />

1.10.8 Proposers must provide a three year Salary Pay Rate Table of Contractor employees<br />

placed in The School District of the City of Saginaw. In addition, proposers must include<br />

starting salary rates for new employees. (To be referenced as Schedule 7).<br />

1.10.9 Proposers shall provide an Employee Benefit Table listing eligibility criteria, and level of<br />

Contractor coverage, including, but not limited to, medical, dental, vision, life, short and<br />

long term disability, retirement, etc. Proposer should also indicate the percentage of<br />

employee/employer contribution for each. (To be referenced as Schedule 8).<br />

1.10.10 Proposers must provide a transition plan of action (outline form acceptable) to transfer<br />

from The School District of the City of Saginaw operated facilities management service to<br />

Contractor operated facilities management service. (To be referenced as Schedule 9).<br />

1.10.11 Proposers must provide a Staff continuity plan showing expected turnover rates for staff<br />

and how the Contractor will address the need to prevent excessive turnover of staff. The

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!