01.02.2014 Views

Geotec SpA Company Presentation

Geotec SpA Company Presentation

Geotec SpA Company Presentation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20 | <strong>Company</strong> presentation<br />

<strong>Geotec</strong> S.p.A.<br />

Completed projects - Projects in progress<br />

Other services<br />

Client<br />

Project<br />

Year<br />

Type of project<br />

STOGIT S.p.A. -Part of ENI Group<br />

Additional borehole drilling for piezometer and extensometer installation at<br />

Stogit sites in Italy.<br />

2013/14<br />

Geognostic surveys/soil investigation<br />

Province of Agrigento<br />

Geognostic investigations and laboratory testing for the planning of works to be<br />

carried out on roads connecting the SS 189, SS 118 and SS 115<br />

2013<br />

Geognostic surveys/soil investigation<br />

Ministry of Infrastructure and Transport –<br />

Interregional Public works office Campania-<br />

Molise<br />

Geological and geotechnical investigations aimed at assessing the characteristics<br />

of rock types for the construction of the new barracks for the Guardia di Finanza<br />

of Termoli with an additional nautical department<br />

2013<br />

Geognostic surveys/soil investigation<br />

Ministry of Infrastructure and Transport –<br />

Interregional Public works office Campania-<br />

Molise<br />

Geological and geotechnical investigations aimed at assessing the characteristics<br />

of rock types for the construction of a new fire station in Termoli<br />

2013<br />

Geognostic surveys/soil investigation<br />

TOTO S.p.A. Costruzioni Generali<br />

Subcontracted services for the carrying out of deep drilling for construction<br />

works of the second Cefalu-Ogliastrillo-Castelbuono track part of the Palermo-<br />

Messina line for RFI-ITALFERR<br />

2013<br />

Geognostic surveys/soil investigation<br />

and deep drilling<br />

SIRJO S.C.p.A.<br />

A services contract with SIRJO S.C.p.A. (temporary association of companies) for<br />

geological and geotechnical surveys in situ: DG41 Construction of the 3rd mega<br />

lot of SS 106 Jonica, from the crossroads between the S.S. 534 (km 365 +150) to<br />

Roseto Capo Spulico (km 400 +000)<br />

2012/13<br />

Geognostic surveys/soil investigation<br />

and deep drilling<br />

Consorzio Infrastrutture<br />

Subcontract together with Landi Stefano Pozzi Chiarugi & C. Sas (a temporary<br />

association of companies) for specialized drilling for geological investigations, as<br />

part of a bigger job to complete the connections of the rivers Serieri and<br />

Sciolabino to the reservoir of the Olivo dam.<br />

2013<br />

Deep geognostic drilling<br />

SINA S.p.A.<br />

Supplementary deep drilling and geognostic surveys as part of the detailed<br />

design of constructive Lot 1 Line AV / AC Milan - Genoa III Giovi Pass<br />

2012/13<br />

Geognostic surveys/soil investigation<br />

and deep drilling<br />

Temporary association of companies: REGGIO<br />

CALBRIA-SCILLA Società Consortile per Azioni,<br />

Impregilo S.p.A. and SICA S.p.A.<br />

Supplementary Geognostic surveys, to be carried out in G.N. Paci north of the A3<br />

2012<br />

Geognostic/soil investigation and sub<br />

horizontal drilling<br />

Province of Campobasso<br />

Geognostic investigations in order to study the phenomenon of hydrogeological<br />

instability affecting part of the SP 149 road in the town of Monacilioni (CB)<br />

2012<br />

Geognostic surveys/soil investigation<br />

Anas S.p.A.<br />

Registration and inspection, using surveying and laser scanning, of works of art,<br />

artifacts and tunnel installations present along trunk roads under the authority of<br />

ANAS, being managed by the Abruzzo road network (trunk roads including<br />

junctions and the NSA).<br />

2012<br />

Registration and inspection and laser<br />

scanning surveys<br />

San Benedetto Val Di Sambro S.c.a.r.l.<br />

The carrying out of deep drillings in the vicinity of the Sparvo tunnel<br />

A1Motorway: Milan Naples<br />

2012 Deep borehole drilling for gas research<br />

National institute of geophysics and vulcan.<br />

Destructive drilling of 3 holes part of the European project called "GLASS".<br />

2011<br />

Deep drilling for a total of 670m<br />

Anas S.p.A (Roma)<br />

Registration and inspection, using surveying and laser scanning, of works of art,<br />

artifacts and tunnel installations present along trunk roads under the authority of<br />

ANAS, being managed by the Abruzzo road network (trunk roads including<br />

junctions and the NSA).<br />

2011<br />

Registration and inspection and<br />

laser scanning surveys<br />

Special Commissioner Interregional<br />

Public works office Campania-Molise<br />

Construction of the road connecting f.v. Tappino (SS 645)-Riccia-Collotorto-San<br />

Giuliano di Puglia, former. S.S. 376, to the Santa Croce di Magliano junction-ss 87<br />

(Piana di Larino) through the western bank of Lake Occhito (lake surroundings) -<br />

1st lot<br />

2011<br />

Geognostic surveys/soil investigation,<br />

geophysical surveys and deep<br />

borehole drilling<br />

The Brenner Base Tunnel Basistunnel BBT SE<br />

Engineering works carried out on the Munich to Verona railway line. Shallow core<br />

drilling – Geological, geognostic, geotechnical, geophysical surveys and large<br />

diameter drilling.<br />

2011<br />

Geognostic surveys/soil investigation,<br />

geophysical surveys and deep<br />

borehole drilling<br />

Anas S.p.A. (Roma)<br />

Services for the carrying out of the project aimed at checking seismic safety<br />

standards -geological geognostic, geotechnical, geophysical surveys on<br />

foundations and structural monitoring using destructive and non-destructive<br />

tests O.P.C.M. 3274/2003 and O.P.C.M. 3362/2004 and subsequent amendments -<br />

Area 2 CENTER<br />

2010/13 Structural surveys, Geognostic surveys<br />

/soil investigation, geophysical down<br />

hole surveys for a total of 182 down<br />

hole surveys equivalent to 6333 metres<br />

Anas S.p.A. General Management – Central<br />

Management<br />

Design – Specialized engineering area: Support services in the drafting of a final<br />

project for the new Eboli intersection of the SA-RC motorway.<br />

2011<br />

Geognostic surveys/soil investigation,<br />

geophysical down hole surveys<br />

Pizzarotti S.p.A.<br />

Supplementary drilling for planning of the BBM project: BRE. BE. MI. BBM slip road<br />

– motorway connection between the cities of Brescia, Bergamo and Milan -<br />

Geological, geognostic, geotechnical, geophysical surveys<br />

2011<br />

Geognostic surveys/soil investigation,<br />

geophysical down hole surveys<br />

Ismes: Divisione Ambiente eTerritorio<br />

Cesi S.p.A.<br />

Geognostic and environmental investigations at the ENEL thermoelectric power<br />

station in Mercure – Laino Borgo (CS)<br />

2009/10<br />

Geognostic/soil investigation<br />

Anas S.p.A. General Management – Central<br />

Management<br />

Support services in the preparing of a final project in the integrated contract for<br />

the “New Tunnel of Colle di Tenda” in the town of Vernante (CN)<br />

2008<br />

Geological surveys<br />

ISMES: Divisione Ambiente eTerritorio<br />

Cesi S.p.A.<br />

Geognostic/soil investigations for the characterization of sites for a wind farm<br />

near Monterosso and Serre<br />

2008<br />

Geognostic surveys/soil investigation<br />

and geophysical surveys

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!