EAST CENTRAL RAILWAY - Indian Railways
EAST CENTRAL RAILWAY - Indian Railways
EAST CENTRAL RAILWAY - Indian Railways
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Page -22 of 40<br />
SIGNATURE OF TENDERER(S)/CONTRACTOR(S)<br />
d) The matching components fittings will be supplied duly inspected and passed by RITES in sealed<br />
gunny bags. The contractor will have to arrange for RITES inspection at their own cost and will<br />
be responsible for furnishing all test certificate before the despatch of fittings.<br />
e) Materials including P. Way fittings will be utilised at site only after receipt of the inspection<br />
certificate by inspecting officials.<br />
SIGNATURE OF TENDERER(S)/CONTRACTOR(S)