28.01.2014 Views

EAST CENTRAL RAILWAY - Indian Railways

EAST CENTRAL RAILWAY - Indian Railways

EAST CENTRAL RAILWAY - Indian Railways

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page -22 of 40<br />

SIGNATURE OF TENDERER(S)/CONTRACTOR(S)<br />

d) The matching components fittings will be supplied duly inspected and passed by RITES in sealed<br />

gunny bags. The contractor will have to arrange for RITES inspection at their own cost and will<br />

be responsible for furnishing all test certificate before the despatch of fittings.<br />

e) Materials including P. Way fittings will be utilised at site only after receipt of the inspection<br />

certificate by inspecting officials.<br />

SIGNATURE OF TENDERER(S)/CONTRACTOR(S)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!