Page -20 of 40<br />
8) ELIGIBILITY : The Tenderer(s) should furnish detailed information as indicated in the five nos. of<br />
declaration forms/certificates placed at Annexure (I to V) of Chapter ___ of the Tender Document and furnish<br />
relevant supportive documents wherever required. Only the tenderers having the following minimum<br />
facilities/capabilities (both financial and technical)/ equipment, personnel and credentials for past performance<br />
in the execution of similar nature of work will be considered for award of this work.<br />
a)<br />
1. Revenue/ Banker’s solvency 40% of Advertised Tender Value of work.<br />
certificate.<br />
2. Should have completed in the<br />
last three financial years (i.e.<br />
current year and three previous<br />
financial years).<br />
3. Total contract amount received<br />
during the last three(03) financial<br />
years and in the current financial<br />
year.<br />
At least one similar work, for a minimum value of 35% of<br />
Advertised Tender value of work.<br />
Should be minimum of 150% of Advertised Tender value.<br />
Tender committee would satisfy themselves about the<br />
authenticity of the certificates produced by the tenderer(s) to<br />
this effect which may be an attested certificate from the<br />
employer/client, audited balance sheet duly certified by the<br />
Chartered Accountant etc. The details about the certificate be<br />
accepted in regard to the turnover.<br />
(A) List of work completed in the last three financial years giving description of work, organisation for whom<br />
executed, approximate value of contract, at the time of award and date of scheduled completion of work.<br />
Date of actual start, actual completion and final value of contract should also be given.<br />
(B) List of work on band indicating description of work, contract value, approximate value of balance work<br />
yet to be done, date of award of work and payment received till date from the same contract.<br />
NOTE : (1) For (A) and (B) above related documents/certificates from the organizations with whom they<br />
worked /are working should be enclosed.<br />
(2) Certificate from Private individuals for whom such work are executed/being executed shall not be accepted.<br />
b) Availability of covered workshop of adequate area with machinery listed below, and facilities for<br />
fabrication and testing facilities to execute this nature of work. The testing shall be as prescribed<br />
in the respective IRS specifications.<br />
(i) Profile Gas cutting machine.<br />
(ii) Drilling machine.<br />
(iii) Punching machine.<br />
(iv) Shaping machine.<br />
(v) Welding generator & equipment for Arc welding of adequate capacity.<br />
(vi) Planing machine.<br />
(vii) Air compressor and riveting equipment.<br />
(viii) Jigs and fixtures for fabrication of channel sleepers.<br />
(ix) Facility of testing of welding work by dye penetration test /<br />
ultrasonic testing.<br />
(x) Master tape of approve quality duly certified for accuracy by National Lab<br />
c) Availability of qualified technical supervisors for fabrication, welding etc. and certified welders<br />
.N.B.:- Tenderers may note that their offer demanding assistance for the procurement of raw materials<br />
and other fittings will not be entertained and such offer will not be considered.<br />
SIGNATURE OF TENDERER(S)/CONTRACTOR(S)