Page -19of 40<br />
SPECIAL CONDITION OF CONTRACT ( PART – II )<br />
1) The rate of item No.01 is inclusive of trial assembling and fixing minimum 10 sleeper (selected at<br />
random) on a nominated bridge. The large scale manufacturing is to be taken up only when<br />
satisfactory performance will be obtained on trial.<br />
2) Payment schedule : Galvanised Channel Sleepers and its complete fittings and fixtures (For item<br />
No.01 of the tender schedule)<br />
a) On arrival of galvanised channel sleepers with all matching fittings for the numbers of<br />
sleepers received for item No.01 of Sch.A at Bridge works site _____60% (duly passed by<br />
inspecting officials and supported by relevant test/inspection certificate).<br />
b) Fixing of channel sleepers on the girder after dismantling the existing bridge timbers and<br />
completion of linking of running and guard rails over the channel sleeper with all fittings and<br />
fixtures in correct gauge, level and alignment as per IRPWM ______20%.<br />
c) Transportation and stacking of the released materials (small fittings, bridge timbers, etc.) to<br />
the Store Depot of concerned PWI ---- 20%.<br />
3) Galvanising of Steel Channel Sleepers and M.S. fittings shall be done by hot dip process of thickness<br />
100 ± 5 microns with Zinc conforming to IS:869-77 and IS:2629-85.<br />
4) Fixing of all elastomeric pads must be done by Epoxy adhesives approved by Rly’s Engineers<br />
supplied by contractor at his cost.<br />
a) Painting the sleeper seat by one coat of red lead paint conforming to IS:102 which will be<br />
supplied by the contractor.<br />
5) For all the supplied items the contractor has to give one Indemnity Bond and has to keep the items in<br />
safe custody by deputing day and night Watchman up to the completion of the work - Railway will<br />
have no responsibility on this account for theft, damage, loss etc. Payment will be entertained taking<br />
into account the materials fitted and fixed on the running lines. For the materials paid for as per 2(a)<br />
but not fixed on a bridge, prorata recovery will be made.<br />
6) Out of two holes for hook bolts, hole on one side of sleeper will be made in the work shop along with<br />
the fabrication of the channel sleepers and the hole on the other side will be drilled on actual<br />
measurement at site to ensure correct alignment of track after final assembly on the bridge.<br />
7) Care should be taken during transportation, loading, unloading, drilling holes, welding, etc. to ensure<br />
that no damage is done to the galvanising. However, galvanised surfaces inadvertently damaged, should<br />
be painted as detailed below :-<br />
a) Application of two coats of paint Red lead conforming to IS:102 as priming coats on an approved<br />
surface.<br />
b) Application of two coats of paint aluminum conforming to IS:2339 as covering coats as per the<br />
approval of the Engineer-in-charge.<br />
SIGNATURE OF TENDERER(S)/CONTRACTOR(S)