SPECIAL CONDITION OF CONTRACT ( PART – I )<br />

1. Fixtures, fabrication and procedure of welding shall be done as per CE’s approved drawing issued<br />

separately for each bridge with latest alterations issued up to date based on RDSO standard<br />

drawing no. RDSO/B-1636/R, RDSO/B-1636/1R and RDSO/B-1636/2R.<br />

2. Fabrication will confirm to RDSO Drg. No. RDSO/T-5155 to RDSO/T-5468 as per requirement<br />

as shown in the approved CE’s drawing of individual bridges.<br />

3. All the MS fittings/components will have to galvanized by the contractor at his own cost.<br />

4. The matching components such as steel fittings, elastomeric pads as per approved drawing listed<br />

in Annexures – B will be supplied duly inspected and passed by M/s RITES in sealed gunny<br />

bags. The contractor will have to arrange for M/s RITES’s inspection at their own cost and will<br />

be responsible for furnishing all tests certificates before the dispatch of fittings.<br />

5. MS square washer used for fixing hook bolts with channel sleeper should invariably be used with<br />

a rubber washer of same size as of MS washer. No extra payment will be made for this.<br />

6. The work will have to be done in states of Jharkhand & Bihar . The sales tax at the rate prevailing<br />

in these states for the work done in the respective areas will be deducted from contractor’s bill.<br />

No claim in this regard will be entertained by Railway at any stage.<br />

7. At some of girders, old channel sleepers are existing riveted with the girder. The same will have<br />

to be cut and holes so formed will have to be riveted; including cost of material, labour, tools etc.;<br />

by the contractor at his own cost. Riveting will have to be done during fixing of steel channel<br />

sleepers under traffic block.<br />

8. The size of the channel sleepers in the list attached in Annexure-A and in item no. 1 of schedule –<br />

A is only indicative and it may vary as per site condition.<br />

9. The length of the sleeper may vary +/- 20mm from the one given in item no. 1 of schedule – A.<br />

The length of sleepers to be fabricated will depend on Annexure – A, Part I , site condition and<br />

approved CE’s drawings.<br />

10. The contractor will have to fabricate the sleepers as per approved CE’s drawings, taking into<br />

account site measurement by PWI/BRI and contractor’s site engineer. As per site measurement,<br />

minor modification may have to be made for providing fixing arrangement of hook bolts,<br />

width/length of channel sleepers and other such modification so that cross level and alignment is<br />

maintained to the required level after taking into account minor variations existing in the girder<br />

from the one as shown in the approved CE’s drawings. The rate quoted herein item wise for all<br />

the items of this tender schedule shall accommodate all such miscellaneous works if any. No<br />

extra claim in this regard will be entertained on account of such modification at any stage.<br />

11. The rate quoted shall include cleaning of rust etc. at the new sleeper and girder contact point and<br />

painting with one coat of epoxy paint to a thickness of 110 micron dry film thickness. If required,<br />

the contractor will have to make pre-block arrangements for shifting existing timbers for doing<br />

painting work. Also, the contractor will have to paint exposed portion of girder after removal of<br />

old sleepers and not covered under new sleeper, with one coat of red lead paint confirming to<br />

IS:102. The rate quoted herein item wise for all the items of this tender schedule shall<br />

accommodate all such works if any. No extra claim in this regard will be entertained on account<br />

of such works at any stage.<br />

SIGNATURE OF TENDERER(S)/CONTRACTOR(S)