EAST CENTRAL RAILWAY - Indian Railways
EAST CENTRAL RAILWAY - Indian Railways EAST CENTRAL RAILWAY - Indian Railways
Page -10 of 40 CONDITIONS FOR P.WAY WORKS AND P.F. WORKS, WHICH ARE DONE NEAR TRACK AND BRIDGE WORKS. 1. The contractor shall not start any work without the presence of railway supervisor or his representative and contractors supervisor at site. 2. The Engineer In-charge shall approve the methodology proposed to be adopted by the contractor, with a view to ensure safety of trains, passengers and workers and he shall also ensure that the methods and arrangements are actually available at site before start of the work and the contractor’s supervisors and the workers have clearly understood the safety aspects and requirements to be adopted / followed while executing the work. 3. There shall be an assurance register kept at each site, which will have to be signed by both, i.e. Railway supervisor or his representative as well as the contractor’s supervisor as a token of their having understood the safety precautions to be observed at site. (Signature) Signature of Tenderer(s) Date………………………… ………..………………………………… (Designation
Name of the Work : Page -11 of 40 East Central Railway (Schedule of rates) (Rates are to be quoted by the Tenderer/s) Supply and fixing of new galvanised steel channel sleepers with all fittings & fixtures after dismantling the existing bridge timbers / sleepers on Bridge No. 34(A) and 371 (UP & DN) ( Total 108nos. ) under AEN(1)/GMO &GJD of Dhanbad Division. 3 (Three) month from the date of issue of acceptance letter. Date of Completion : Schedule – A: Sl. No. Description of work 1) Fabrication, transportation, supply and fixing of the new galvanised steel channel sleepers made from standard rolled section (conforming to IS-2062 Grade-B) after dismantling the existing track and bridge timbers/sleepers as per the approved drawings as mentioned in Annexure-A (containing details of the bridge, section of AEN, span details, section & length of channels sleepers, no. of sleepers etc.) including supply and fixing of all other required fittings and fixtures as per Annexure-B, read along with the Note below these Annexure and also special conditions of contract (Part – I, II & III) attached with this tender schedule, duly galvanized as per specifications indicated in the approved drawings at contractor’s cost complete. The work includes (1) cutting of steel plates/sections by mechanized means to size and shape, drilling, assembling, welding, riveting, bolting, holing, milling, grinding, machining, galvanizing of steel components, fixation by Epoxy adhesive as specified in drawing; (2) Removal and linking the running and guard rails including cutting and drilling of guard rail and running rails. (3) Transportation and stacking of the released materials {with not more than 2% (two percent) accountal loss} except rails to a nearest PWI/Store Depot at GMO/PRP according to the demand of requirement of the work and as per instructions of Engineering In-charge. (4) Supply of all fittings as mentioned in the relevant drawings including galvanizing of MS fittings. MS grooved/pad/packing plate may have to be welded with sleepers as shown in relevant drawings. However, payment of manufacture, transportation, supply and fixing including welding with sleepers if required of MS grooved/ pad/packing plates duly galvanized will be made separately under item No.2. Aprox. Qty. Unit Rate in figure Rate in words Sr.DEN(2)/DHN SIGNATURE OF TENDERER(S)/CONTRACTOR(S)
- Page 1 and 2: Page -01 of 40 EAST CENTRAL RAILWAY
- Page 3 and 4: Page -03 of 40 The tender must be s
- Page 5 and 6: ANNEXURE - I TENDER FORM (SECOND SH
- Page 7 and 8: Page -07 of 40 13. Execution of Con
- Page 9: Page -09 of 40 ELIGIBILITY CRITERIA
- Page 13 and 14: Page -13 of 40 Sl. Description of w
- Page 15 and 16: Page -15 of 40 Annexure - A Part-I
- Page 17 and 18: Page -17 of 40 NOTE : THESE ITEMS S
- Page 19 and 20: Page -19of 40 SPECIAL CONDITION OF
- Page 21 and 22: Page -21 of 40 9) The Contract of t
- Page 23 and 24: Page -23 of 40 SPECIAL CONDITIONS O
- Page 25 and 26: Page -25of 40 19) APPOINTING TECHNI
- Page 27 and 28: iii) iv) Page -27 of 40 The adjustm
- Page 29 and 30: Page -29 of 40 iv) The calculations
- Page 31 and 32: Page -31 of 40 t) IS:2623-1986 : Me
- Page 33 and 34: Page -33 of 40 JIGS & MANIPULATORS
- Page 35 and 36: Page -35 of 40 10) Fixing of Steel
- Page 37 and 38: Page -37 of 40 ANNEXURE - II DETAIL
- Page 39 and 40: Page -39 of 40 ANNEXURE - IV TENDER
Page -10 of 40<br />
CONDITIONS FOR P.WAY WORKS AND P.F. WORKS, WHICH ARE DONE NEAR<br />
TRACK AND BRIDGE WORKS.<br />
1. The contractor shall not start any work without the presence of railway supervisor<br />
or his representative and contractors supervisor at site.<br />
2. The Engineer In-charge shall approve the methodology proposed to be adopted by the<br />
contractor, with a view to ensure safety of trains, passengers and workers and he shall<br />
also ensure that the methods and arrangements are actually available at site before<br />
start of the work and the contractor’s supervisors and the workers have clearly<br />
understood the safety aspects and requirements to be adopted / followed while<br />
executing the work.<br />
3. There shall be an assurance register kept at each site, which will have to be signed by<br />
both, i.e. Railway supervisor or his representative as well as the contractor’s<br />
supervisor as a token of their having understood the safety precautions to be observed<br />
at site.<br />
(Signature)<br />
Signature of Tenderer(s)<br />
Date…………………………<br />
………..…………………………………<br />
(Designation