28.01.2014 Views

EAST CENTRAL RAILWAY - Indian Railways

EAST CENTRAL RAILWAY - Indian Railways

EAST CENTRAL RAILWAY - Indian Railways

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CMS Xing<br />

7. GUARANTEE:<br />

7.1 The contractor guarantees that the stores, which are supplied, shall be manufactured<br />

fully in accordance with specification. In all cases the contractor guarantees that its<br />

design shall strictly follow the ‘as made’ detailed drawings with such modification as<br />

are notified in respect of such type.<br />

7.2 The contractor further guarantees that the stores shall be free from defects in material<br />

and workman ship. The contractor shall be liable to arrange the necessary<br />

replacements of the defective stores free of any change only to the extent that such<br />

replacements are attributable to or arise from faulty workmanship of material or design<br />

in the manufacturer of the stores. All replacements shall be made free of cost at<br />

destination. If the contractor so desires, the replaced stores can be taken over by him<br />

for disposal as he deems fit, within a period of three months from the date of the<br />

receipt of the replacement of defective stores by the purchaser. At the expiry of this<br />

period no claim in this respect shall lie on the purchaser.<br />

7.3 The guarantee herein contain shall not apply to any material which shall have been<br />

repaired or altered by the purchaser, or on his behalf in any way so as to affect its<br />

strength performance or reliability or to any defect to any part due to misuse<br />

negligence or accident.<br />

7.4 The guarantee herein contain shall expire in respect of each item of stores on the<br />

expiry of 12 months from the date of its delivery or nine months from the date of its<br />

placing in service whichever is earlier except in respect of defects notified to the<br />

contractor, prior to the expiry of such dates.<br />

7.5 All replacements that a purchaser shall call upon the contractor to deliver under this<br />

guarantee shall be delivered by the contractor within three months from the date on<br />

which the purchaser call upon him for the replacement of the defective stores. If the<br />

contractor fails to replace the defective store within the said period the cost of the such<br />

stores at the rate stipulated in the contract, shall be recovered from the payments due to<br />

the contractor including the amount of security deposit made and maintained under<br />

Clause 9.<br />

(Page 9 of 16)<br />

Signature of Tenderer(s)<br />

Dated----------------------

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!