EAST CENTRAL RAILWAY - Indian Railways
EAST CENTRAL RAILWAY - Indian Railways
EAST CENTRAL RAILWAY - Indian Railways
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>EAST</strong> <strong>CENTRAL</strong> <strong>RAILWAY</strong><br />
TENDER NO. TRD/OT/04/2005-06/Vehicle<br />
DATED 24.08.2005.<br />
TENDER PAPER<br />
FOR<br />
Repairing of Vehicle<br />
(Jeep No:BR-14P.1508(Make Mahindra &<br />
Mahindra) under Sr.Sec.Engineer(Tr-D)East<br />
Central Railway/Dhanbad.<br />
in<br />
Dhanbad division<br />
of<br />
East Central Railway<br />
Issued by:-<br />
Sr. Divl. Electrical Engineer(Tr.-D)<br />
East Central Railway<br />
DHANBAD<br />
Copy No.:<br />
Issued to:<br />
Price: Rs. 500/-<br />
1
East Central Railway<br />
Electrical Department<br />
Repairing of Vehicle (Jeep No: BR-14P-1508(Mahindra &<br />
Mahindra) under Sr.Section Engineer(Tr-D)<br />
East Central Railway/Dhanbad.<br />
No.TRD/OT/04/2005-06/Vehicle Dated 24.8.05<br />
Divl. Railway Manager (Tr.-D), East Central Railway, Dhanbad<br />
invites sealed open tender, from Technically and financially sound<br />
firms, for the work for annual maintenance for miscellaneous works<br />
for repair and maintenance of TRD equipments in GC & CIC section<br />
of Dhanbad division.<br />
1. Approximate Cost Rs. 2,49,051/-(Rupees Two<br />
lakh forty nine thousand<br />
fifty one only approx.)<br />
2. Earnest Money Rs.6250/- (Rupees Six thousand<br />
Two hundred fifty only)<br />
3. Date of selling of 19.9.2005 to 05.10.2005<br />
Tender Papers<br />
Any working day from 12.00 hrs.<br />
to 15.00 hrs. (except Saturday,<br />
Sunday & Holidays)<br />
4. Venue Office of the,<br />
i)Chief Electrical Engineer/East<br />
Central Railway/Hajipur.<br />
ii)Divl. Railway Manager(TR-D),<br />
Dhanbad, Mughalsarai & Danapur.<br />
5. Date & Time of Opening of At15.30 Hrs. on 6.10.2005<br />
Tender<br />
6. Cost of tender paper Rs.500/-(Rupees five hundred only)<br />
7. Venue of submission of 12.00 hrs. to 15.00 hrs.between<br />
Tenders 19.09.05 to 06.10.05 at the<br />
places mentioned at item 4.<br />
8. Period of completion of work 03 months(90 days) from the<br />
date of issue of Letter of<br />
Intent /Letter of Acceptance<br />
whichever is earlier.<br />
2
9. Eligibility Criteria(costing above Rs.10 lakh):-<br />
i) Should have completed<br />
in last three<br />
financial years (i.e.<br />
current year & 3<br />
previous financial<br />
years):<br />
ii) Total contractual<br />
payment received<br />
during the last 3<br />
years and in the<br />
current financial<br />
year:<br />
iii) Electrical<br />
Contractor’s License<br />
At least one similar<br />
single work, for a<br />
minimum value of 35% of<br />
Advertised tender value<br />
of work.<br />
Should be a minimum of<br />
150% of Advertised tender<br />
value.<br />
Tenderer should have a<br />
valid and current<br />
Electrical Contractor’s<br />
License.<br />
10. Tenderers are advised to visit the site of work and familiarize<br />
themselves with site conditions and quantum of works in their<br />
own interest.<br />
11. Tender must be accompanied by prescribed amount of earnest money<br />
in acceptable form as mentioned in the tender documents. Earnest<br />
money in the form of guarantee bond will not be accepted.<br />
Tenders without prescribed earnest money will be summarily<br />
rejected.<br />
12. In case of date of opening is declared as holiday or is closed<br />
due to adverse conditions arising due to natural<br />
calamity/unavoidable circumstances the tenders will be opened on<br />
following working day at same time and venue.<br />
13. Railway reserves the right to either cancel the tender or reject<br />
any or all the tenders without assigning any reason thereof.<br />
Sr. Divl. Elect.Engineer(Tr.-D),<br />
For Divl. Railway Manager(Tr.-D)<br />
East Central Railway<br />
Dhanbad.<br />
3
NOTE TO TENDERER<br />
Tenderer must comply with all points mentioned in the tender<br />
paper. Failing to do this, the Railway reserves the right to<br />
summarily reject the tender without assigning any reason to the<br />
tenderer.<br />
NOTE TO CONTRACTOR(SUCCESSFUL TENDERER)<br />
Weekly Progress Report:<br />
Successful tenderer must submit regular weekly progress<br />
report. Non submission of such report will mean default.<br />
MODE OF INSPECTION:<br />
Before giving a call for inspection, the contractor must ensure<br />
that the work offered for inspection is actually completed. Non<br />
complete of this procedure will earn discredit for the contractor<br />
in as much to the same will be booked as a defect in the<br />
inspection report.<br />
Final call for inspection must be given at least 15 days before<br />
the proposed date of inspection. Measurement of works will be as<br />
per relevant part of the general condition of contract.<br />
Physical completion has to be ensured at least 15 days before<br />
expiry of completion date to avoid extension of completion period.<br />
DEPARTMENTALLY TAKING OVER OF AN ITEM OF WORK TO SPEED UP<br />
PROGRESS:<br />
Any work can be taken over departmentally. All materials<br />
as included in the schedule are primarily required to be supplied<br />
by contractor. But for benefit of Railway item of work may be<br />
taken over fully or in part, as per decision of the Engineer of<br />
the Railway and the same will be deleted at a suitable date later<br />
on.<br />
GENERAL CONDITION OF THE TENDER<br />
1.1 The tender papers are not transferable<br />
1.2 No tender will be considered unless accompanied by:<br />
a) Documents in proof of deposit of the sum specified in the<br />
preamble to the tender towards the earnest money<br />
deposit.<br />
b) Full particulars of Electrical contractor’s license and<br />
the class of license held by him, the name and class of<br />
license held by his supervisors, Photostat copy of Elect.<br />
Contractor license and supervisor’s license etc<br />
c) Documents to show that the tenderer will engage a<br />
technically qualified person to physically supervise his<br />
works if his tender is accepted.<br />
4
1.3 No tender paper may be considered unless accompanied by:-<br />
a) The offer letter as an Annexure-I duly filled in and<br />
signed.<br />
b) Tenderer credential as in Annexure-II duly filled in and<br />
signed.<br />
c) Explanatory note for schedule of work is given in<br />
Annexure-IV.<br />
2. DEPOSITING OF EARNEST MONEY:<br />
2.1 Earnest money will be deposited in cash or in any of the<br />
following forms:-<br />
a) In cash (on which no interest will occur) to be deposited<br />
with the Divisional Cashier, East Central Railway, Dhanbad<br />
or with the Chief Cashier, East Central Railway,Hajipur.<br />
b) Deposit receipts/pay order/demand draft in favour of<br />
FA&CAO/East Central Railway / Hajipur issued by the State<br />
Bank or any of schedule Bank approved by the Reserve Bank<br />
of India.<br />
c) No cheque will be accepted even if it is guaranteed by<br />
the Bank.<br />
d) The tenderer who have standing deposit of earnest money<br />
with the Railway administration need not to deposit any<br />
fresh earnest money while submitting the tenders.<br />
2.2 No interest will be occurred on the earnest money. The<br />
earnest money will be refunded to the un-successful tenderer.<br />
2.3 Request for transfer of earnest money and or security deposit<br />
of work even if the same is free from all obligations will<br />
not be accepted for the purpose of earnest money.<br />
2.4 The tenderer will be summarily rejected unless requisite<br />
earnest money is paid in full.<br />
2.5 The earnest money that the tenderer is required to deposit<br />
along with tender, amount indicated in the preamble of the<br />
tender which is inclusive of security deposit of extent of<br />
1/5 th of the earnest money deposited for due performance of<br />
the stipulation to keep the offer open for a period of 90<br />
days from the date of opening of the tender, it being<br />
understood that the tender documents have been sold to the<br />
tenderer and the tenderer being permitted to tender in<br />
consideration of the stipulation on his part that after<br />
submitting the tender he will not resile from his offer or<br />
modify the terms and conditions thereof in a manner not<br />
acceptable to the Sr.Divl.Elect. Engineer(TR-D)/East Central<br />
Railway/Dhanbad & is liable to be forfeited by the Railway in<br />
the event of the failure on the part of the tenderer to<br />
observe and comply with the foregoing stipulation of the<br />
tender.<br />
5
3. SECURITY DEPOSITE:<br />
3.1 On receipt of the acceptance of the tender from the Railway<br />
the successful tenderer will be required to furnish the<br />
Railway with security deposit as finally worked out after<br />
opening of the tender, in the following manner, within<br />
seven(7) days from the issue of the acceptance letter.<br />
SECURITY DEPOSIT:-<br />
i) For contract upto Rs. 1 Lakh and : 10% of the value of<br />
the contract.<br />
ii) For contract more than Rs. 1 Lakh : 10% of the first 1<br />
and upto Rs. 2 Lakhs.<br />
lakh & 7.5% of the<br />
balance.<br />
iii) For contract more than 2 Lakhs and : 10% of the 1 st 1 Lakh,<br />
Upto 2 crores.<br />
7.5% of the next 1 lakh,<br />
& 5% of the balance<br />
subject tothe maximum<br />
3 Lakhs.<br />
iv) For contract above Rs. 2 crores. : 5% of the contract<br />
value. The amount<br />
over and above 3<br />
lakhs to be recovered<br />
from progressive<br />
bills of the<br />
contractor till it<br />
reaches 5% of the<br />
contract value.<br />
3.2 The security money should be deposited in any of the<br />
following form:-<br />
a) In cash (on which no interest will occur) to be deposited<br />
with Divisional Cashier, East Central Railway, Dhanbad or<br />
Chief Cashier, East Central Railway,Hajipur.<br />
b) Guarantee Bond in favour of FA&CAO/East Central<br />
Rly/Hajipur executed by State Bank of India or any other<br />
Nationalised Bank of India. The bond should be prepared on<br />
prescribed form and should be valid for not less than 18<br />
months.<br />
c) Deposit receipts/pay orders/demand drafts in favour of<br />
FA&CAO/East Central Rly./Hajipur issued by State Bank of<br />
India or any other Nationalized Bank or any of the<br />
scheduled Bank approved by the Reserve Bank of India.<br />
d) Government securities of 5% below the market value.<br />
3.3 Should the validity of such guarantee Bond towards the<br />
security deposit, expire before the Security becomes due for<br />
refund; it will be the responsibility of the contractor to<br />
cause to be extended the validity of the guarantee Bond for<br />
an agreed period. In case of failure to do so the<br />
Administration will deduct from his bills an equivalent<br />
amount of security without further reference to him. The<br />
6
validity of guarantee Bond should cover the guarantee period<br />
plus 3 months additional time.<br />
3.4 The total security deposit will be retained by the Railway<br />
administration for a period 12 months from the date of<br />
completion of work without any interest being occurred and<br />
will be released after the guarantee period is over and issue<br />
of certificate for performance of the work by the<br />
representative of the Railway.<br />
3.5 The executed work as covered in the contract, should be<br />
guaranteed for trouble free operation for a period of 12<br />
months from the date of completion of work in all respect.<br />
Any defects due to faulty designed, bad workmanship or use of<br />
inferior quality of materials, that may be developed or be<br />
noticed during the period shall be repaired or replaced by<br />
the contractor free of cost at the site of works executed<br />
within the reasonable time.<br />
3.6 The Railway administration shall be entitled to deduct from<br />
the security deposit the requisite amount for any loss or<br />
damage from the contractor, which the Railway administration<br />
may be put to for any reason of any act for default<br />
recoverable by the Railway from the contractor or to call<br />
upon the contractor to maintain deposit at its original limit<br />
by making further deposit. In the event of contractor failing<br />
to make and maintain a security deposit in the manner<br />
aforesaid, any money lodged with the tender by him will be<br />
liable to be forfeited, the Railway shall be entitled to<br />
cancel the acceptance of the tender. No cheque will be<br />
accepted for security deposit even if it is guarantied by the<br />
Bank.<br />
4. SUBMISSION OF TENDER:<br />
The tenderer shall submit the tender in a sealed cover<br />
addressed to Sr. Divl. Elect. Engineer (TRD)/East Central<br />
Railway/Dhanbad, subscribed on the cover “Tender No and Name<br />
of the work in full” and delivered in the sealed tender box<br />
located in the office of the Chief Electrical<br />
Engineer,E.C.Rly., Hajipur, Sr. Divisional Electrical<br />
Engineer/TRD/East Central Railway/Dhanbad, Danapur &<br />
Mughalsarai from 19.09.2005 to 05.10..2005 between 12.00<br />
hrs. to 15.00 hrs. on any of the working day(except Saturday,<br />
Sunday and Holiday) and on 06.10.2005 between 10.00 hrs. to<br />
12.00 hrs..<br />
5. OPENING OF TENDER:<br />
The tender shall be opened in the office of the Chief<br />
Electrical Engineer, E.C. Rly., Hajipur, Sr.Divl. Elect.<br />
Engineer/TR-D/ East Central Railway/Dhanbad, Danapur and<br />
Mughalsarai in presence of the tenderers or their authorized<br />
representative as may be present at the prescribed time and<br />
date specified in the preamble to the tender papers.<br />
7
6. EXECUTION OF THE AGREEMENT:<br />
The successful tenderer shall have to sign an agreement for<br />
the work in standard form to be supplied at the time of<br />
execution of tender by the administration after security<br />
deposit and within seven days from the date of issue of the<br />
acceptance letter failing which his earnest money will be<br />
forfeited.<br />
7. GENERAL CONDITION OF CONTRACT:<br />
The acceptance of the tender and execution of the contract<br />
shall be governed by the “General Condition of the Contract”<br />
(as amended upto date) and same where modified within these<br />
tender papers. The copy of the serial shall not be supply by<br />
the Railway and shall have to arranged by the contractor at<br />
his own source and cost (The copy may be obtained by the<br />
tenderer from Chief Engineer/ Con’s office at 14, Strand<br />
Road, Kolkata-1).<br />
8. CONSTITUTION OF THE FIRMS:<br />
Original documents of the constitution of their firms,<br />
partnership deed and the power of attorney, if any, to other<br />
duly signed by the person who signed the original documents,<br />
shall have to be submitted to the Railway for verification.<br />
The original documents will be returned to the tenderer after<br />
verification.<br />
9. RATES TO INCUDE ALL TAXES:<br />
The rates quoted should be inclusive of all taxes, octroi,<br />
duties, royalty existing or that may be imposed in future.<br />
10. <strong>RAILWAY</strong> PASS OR CONCESSION:<br />
No Railway Pass and concession tickets/freight for men and<br />
materials of the contactor will be granted by the Railway.<br />
11. COMMENCEMENT OF WORK:<br />
The successful tenderer shall have to start the work within 7<br />
days from the date of issue of work order.<br />
12. COMPLETION TIME:<br />
03 Month(three months)/90 Days(Ninety days) from the date of<br />
issue of Letter of Intent/Letter of Acceptance.<br />
13. EXTENSION OF TIME:<br />
In the event of failure on the part of the contractor to<br />
complete the work within the time as specified above on any<br />
ground accepted by the Railway administration as reasonable<br />
and on approach by the contractor in such circumstances for<br />
extension of time the Railway administration may allow<br />
additional time to the extent as would be considered<br />
reasonable by the Railway administration, such consideration<br />
being in the absolute discretion of the Railway<br />
administration for which the contractor shall not be entitled<br />
to any compensation.<br />
8
14. PENALTY FOR DELAY IN COMPLETION:<br />
The time for the execution of the work or part of the If<br />
the work is not completed within the stipulated period of 30<br />
(thirty) days from the date of issue of work order, a penalty<br />
of 2% (two percent) per day or part thereof, of the value of<br />
the work order will be imposed for the period by which the<br />
completion is delayed beyond the stipulated date of<br />
completion as per the work order.<br />
15. TERMINATION OF THE CONTRACT:<br />
The contract shall be terminated by the Railway<br />
administration as per clause provided in the General<br />
Condition of the Contract A6-54.<br />
16. TERMS OF PAYMENT:<br />
subject to any deduction or recovery which purchaser may be<br />
entitled to make under the contract, the contractor unless<br />
otherwise agreed to, shall be entitled to get the following<br />
payments:-<br />
i) Running bills may be paid to the contractor at the<br />
discretion of the Sr.Divl.Elect. Engineer/TRD/ East<br />
Central Rly/Dhanbad. The running bills will be released<br />
upto 85% (eighty five percent) of the value of work<br />
done.<br />
ii) Remaining 15 % (fifteen percent) of all on account bills<br />
will be released at the time of arranging final payment.<br />
17. CONTRACTORS RESPONSIBILITY FOR DISCREPENCIES:<br />
i) The rates quoted by the contractors shall be based on<br />
and through study of the nature and quantum of work<br />
covered under this tender.<br />
ii) The contractor shall be solely responsible for the<br />
correctness of the work according to the drawing and<br />
specifications as covered in the contract not<br />
withstanding that he may have been assigned by the<br />
purchaser or his representative in setting out the same.<br />
iii) All the materials supplied by the contractors for<br />
execution of the work, should be get inspected and<br />
approved by the purchaser or his authorized<br />
representative before they are fitted/commissioned and<br />
the certificate issued to this effect should be<br />
submitted to this office.<br />
iv) Any work executed with un approved materials shall<br />
entirely the responsibility of the contractor.<br />
v) The contractor shall ensure that during execution of the<br />
work at site one of his competent supervisor is always<br />
available at site to execute the work as per<br />
specification, drawing of the contract & also to take<br />
the necessary instruction in relation to the execution<br />
of the work from the purchasers or his authorized<br />
representative.<br />
9
vi) The contractor shall during the process of work be<br />
entirely responsible for the custody of its stores or<br />
equipments for the work executed at the site.<br />
vii) The contractor shall arrange his own accommodation if<br />
necessary, for the purpose of storing materials and<br />
tools.<br />
viii)Any information relating to the tender or clarification<br />
in connection therewith may be obtained from the office<br />
of the Senior Divisional Electrical Engineer/TRD/ East<br />
Central Railway/Dhanbad on any working day during office<br />
hours.<br />
18. ACCEPTANCE OF TENDER AND THE CONDITIONS IN CONNECTION<br />
THEREWITH:<br />
i) The tender shall hold the offer open till such date as<br />
specified in the tender. It is understood that the<br />
tender documents have been sold to the tenderer and the<br />
tenderer is/are being permitted to tender in<br />
consideration of the stipulation on his/their part that<br />
after offer submitting his/their tender, he /they will<br />
not resign from their offer or modify the terms and<br />
conditions thereof in a manner not acceptable to the<br />
Sr.Divl. Electrical Engineer/TRD/East Central<br />
Railway/Dhanbad, should the tenderer fail to observe or<br />
comply with the foregoing stipulation, on the amount<br />
deposited as security for due performance of the above<br />
stipulation shall be forfeited to the Railway. If the<br />
tender is accepted the amount of earnest money will be<br />
held as security deposit for the due and faithful<br />
fulfillment of the contractor. The earnest money will be<br />
returned to the unsuccessful tenderers by the Railway,<br />
shall not be responsible for any loss or depreciation<br />
that may happen to the security, for the due performance<br />
or stipulation to keep the offer open for the period<br />
specified in the tender documents or the earnest money<br />
while in the possession, not be liable to pay interest<br />
there on.<br />
ii)<br />
It shall not be obligatory on the said authority to<br />
accept the lowest tender and no tenderer shall demand<br />
any explanation for the cause of rejection of his/their<br />
tender.<br />
iii) If the tenderer/s deliberately give/s wrong information<br />
in his/their tender or creates/create circumstances for<br />
the acceptance of his/their tender, Railway reserves the<br />
right to reject such tender at any stage.<br />
iv) If a tenderer expires after the submission of his/their<br />
tender or after the acceptance of his/their tender, the<br />
Railway shall deem such tender as cancelled. If a<br />
partner of a firm expires after submission of their<br />
tender or after the acceptance of their tender, the<br />
Railway shall deem such tender as cancelled.<br />
10
v) The earnest money including the amount taken as security<br />
deposit for the due performance of the stipulation to<br />
keep the offer open till the date specified in the<br />
tender will be refunded to the unsuccessful<br />
tenderer/tenderers within a reasonable time. The earnest<br />
money deposited by the successful tenderer/tenderers<br />
will be retained towards the security deposit for due<br />
and faithful fulfillment of the contract but shall be<br />
forfeited if the contractor fails to execute the<br />
‘Agreement Bond’ within seven days of the notification<br />
of the acceptance of his/their tender or commence the<br />
work within seven days after receipt of orders to that<br />
effect.<br />
vi) Non-compliance with any of the stipulations and<br />
conditions herein above is liable to result in the<br />
tender being rejected.<br />
vii) The authority for the acceptance of the tender will rest<br />
with the Sr. Divl.Elect.Engineer(TR-D)/East Central<br />
Railway, Dhanbad who does not bind himself to accept the<br />
lowest or any other tender nor does be undertake to<br />
assign reasons for declining to consider any particular<br />
tender or tenderers.<br />
viii)The tenderer shall keep the offer open for a minimum<br />
period of 90(Ninety) days from the date of opening of<br />
the tender, within which period the tender can not<br />
withdraw his offer subject to the period being extended<br />
further if required, by mutual agreement from the time<br />
to time. Any contravention of the above condition will<br />
make the tenderer liable for forfeiture of his security<br />
deposit.<br />
ix) Should a tenderer or contractor on the list of approved<br />
contractors have a relative or relatives or in the case<br />
of a firm or company of contractors one or move of its<br />
share holders or a relative or relatives of share holder<br />
employed in gazetted capacity in the Elect. Engineer<br />
Deptt. of the East Central Railway. The authority<br />
inviting tender shall be informed of the fact at the<br />
time of submission of tender, falling which the tender<br />
may be disqualified of such fact subsequently comes to<br />
light the tender/contract may be rescinded in accordance<br />
with the provision in clause 61 of the General Condition<br />
of the contract.<br />
x) Should a tenderer be a retired Engineer of the gazetted<br />
rank or any other gazetted officer working before his<br />
retirement whether in the executive or administrative<br />
capacity or whether in the holding a pensionable post<br />
administrated by the President of India for the time<br />
being or should a tenderer being partnership firm have a<br />
11
one of its partners a retired Engineer or a retired<br />
gazetted as aforesaid or should a tenderer being an<br />
incorporated company have any such retired Engineer or<br />
retired officer as one of its directors, or should a<br />
tenderer have in his employment any retired Engineer or<br />
retired officer as aforesaid the full information to the<br />
date of retirement of such Engineer or gazetted officer<br />
from the said service and in case where Engineer or<br />
officer had not retired from Govt. service and in cases<br />
where Engineer or officer had not retired from Govt.<br />
service at least two years prior to the date of the<br />
submission of tender as to whether permission for taking<br />
such contact, of if the contractor be a partnership firm<br />
or any incorporated company to become a partner or<br />
director as the case may be or to take employment under<br />
the contractor, has been obtained by the tenderer or the<br />
Engineer of the contractor as the case may be from the<br />
President of India or any officer authorized by him in<br />
his behalf shall be clearly stated in writing at the<br />
time of submitting the tender without the information<br />
above referred to or statement to the effect that no<br />
such retired Engineer or retired gazetted officer is so<br />
associated with the tender, as the case may be shall be<br />
rejected.<br />
xi)<br />
All materials for this work are to be supplied by the<br />
contractor for all the items, other than those<br />
specified.<br />
xii) The final acceptance of the tender shall rest with the<br />
Sr.Divl.Elect.Engineer(TR-D/East Central Railway/Dhanbad<br />
or his representative who reserves the right to accept<br />
or reject any tender or part thereof without assigning<br />
any reason thereof and does not blind himself to accept<br />
the lowest tender only.<br />
19. ARBITRATION:<br />
i) Matters in question of dispute or difference to be<br />
attributed upon shall be referred for decision to:-<br />
a) A sole arbitrator who shall be the Chief Electrical<br />
Engineer/East Central Railway/Hajipur or a person<br />
nominated by him in that behalf in cases where the<br />
claim in question is below Rs. 50,000/- and in cases<br />
where the issues involved are not a complicated<br />
nature. The Chief Electrical Engineer shall be the<br />
sole judge to decide whether or not the issue<br />
involved of a complicated nature.<br />
b) The arbitrators, who shall be gazetted Railway<br />
Officer of equal status to be appointed in the manner<br />
laid down in sub para (ii) below for all claims of<br />
Rs. 50,000/- and above, and for the issue involved<br />
12
are of a complicated nature. The Chief Electrical<br />
Engineer/East Central Railway/Hajipur shall be the<br />
sole judge to decide whether the issues are of a<br />
complicated nature or not. In the event of the two<br />
arbitrators being decided in their opinion the matter<br />
under dispute will be referred to an umpire to be<br />
appointed in the matter laid down in sub para (ii)<br />
for his decision.<br />
ii) For the purpose of appointing two arbitrators as<br />
referred to in sub para(i) (b) above, the Railway will<br />
send a panel or move than their names of officers of the<br />
appropriate status of one or more than three names<br />
of officers, of the appropriate status or one or more<br />
departments of the Railway to the contractors who will<br />
be asked to suggest a panel of three names out of the<br />
list so sent by Railway. The Chief Electrical Engineer<br />
will appoint an arbitrator out of this panel as the<br />
contractor’s nominee and then appoint a second<br />
arbitrator of equal status as the Railway nominee either<br />
from the panel or from outside the panel ensuring that<br />
one of the two arbitrators shall nominee an umpire to<br />
whom case will be referred in the event of any<br />
difference between the two arbitrators.<br />
iii) The arbitrator or arbitrators of the umpire shall have<br />
power to call for such evidence by affidavit or<br />
otherwise as the arbitrator umpire shall thank and it<br />
shall be duty of the parties hereto to do cause to be<br />
done all such things as may be necessary to enable the<br />
arbitrator or arbitrators or umpire to make the award<br />
without any delay.<br />
iv)<br />
It will be no objection that the person appointed as<br />
Arbitrator/Arbitrators, umpire are Government servants<br />
and that in the course of their duties as government<br />
they have express views on all or any of the matters in<br />
dispute.<br />
v) Subject as aforesaid Arbitration Act, 1940 and the rules<br />
there under and any statutory modification thereof shall<br />
apply to Arbitration proceeding under this clause.<br />
20. INSPECTION AND TESTING:<br />
i) All materials will be subject to inspection and test by<br />
the purchaser or his representative at the<br />
manufacturer’s works before dispatch and no materials<br />
shall be dispatched from the manufacturer’s works until<br />
these are inspected and or approved. The materials may<br />
also be inspected by the purchaser or his representative<br />
again at the contractor’s depot/works site. The<br />
purchaser or his representative shall have the right to<br />
be present during all stages of manufacture and shall be<br />
13
afforded free of charge all reasonable facilities for<br />
inspection and testing so as to satisfy himself<br />
/themselves that the materials are in accordance with<br />
specifications, approved drawings and design. Any<br />
unreasonable delay in inspection will be reasonable<br />
ground for extension of time for completion of work.<br />
ii) No less than 15 days notice in writing shall be given by<br />
the contractor to the purchaser in order that the<br />
purchaser’s Engineer may present if they (i.e.<br />
purchaser) so desire for carrying out the inspection.<br />
21. INSPECTION AND PROVISIONAL ACCEPTANCE:<br />
The articles/quarters which are to be supplied and<br />
executed as per specification will be inspected by the<br />
Sr.Divl.Elect. Engineer(TR-D)/East Central Railway/Dhanbad or<br />
by his authorized representatives at every stage of payment<br />
of the tender. The Railway administration reserves the right<br />
for acceptance and rejection of the work, thus inspected<br />
without assigning any reason.<br />
22. DEVIATION FROM TENDER:<br />
Deviation from tender papers will not normally be agreed<br />
to should the tenderer be unable for good and sufficient<br />
reason to comply entirely with the tender papers. He shall<br />
indicate the deviations desired by him. Such deviation if any<br />
shall be kept down to the absolute minimum and the reasons<br />
for deviation shall be indicated. The Railway administration<br />
reserves the rights to cancel the tender, if any deviation is<br />
not acceptable to it and if the tenderer is unwilling to<br />
withdraw the deviation or modify the same in a manner<br />
acceptable to the Railway, the tenderer in all such cases<br />
shall indicate clearly the special condition or amendment<br />
desired by him to the relevant item of the tender papers.<br />
23. DEFAULT AND DELAY:<br />
The contractor shall execute the work with due diligence<br />
and expeditious keeping to the approved time schedule should<br />
be refuses or neglect to comply with any reasonable orders<br />
given to him in writing by the Sr.Divl.Elect.Engineer(TR-<br />
D)/East Central Railway/Dhanbad or any of his authorized<br />
representative in connection with the work or contrivance the<br />
provision of the contract or the progress of the work laps<br />
persistently behind the time schedule due to his negligence,<br />
the Railway administration shall be at liberty to give seven<br />
days notice in writing to the contractor requiring him to<br />
make good the neglect or contravention complained of and<br />
should the contractor fail to comply with the requisitions<br />
made in the notice within seven(7) days from the receipt<br />
thereof, it shall be lawful for the Railway administration to<br />
take the work wholly or in part out the contractor’s hand<br />
14
without any further reference and get the work or any part<br />
thereof as the case may be completed in any other rights or<br />
remedy of the Railway administration.<br />
24. LOSS SUSTAINED DUE TO DEFAULT AND DELAY:<br />
In the event of any loss to the Railway administration<br />
on account of execution and/ or completion of the work or any<br />
part thereof by the agencies other than the contractor in<br />
terms the above clause the contractor shall be liable to<br />
imburse the loss to the Railway administration and the<br />
reimbursement in full or in part as the case may be shall be<br />
met at the option of the Railway administration from out of<br />
all or any of the following courses:-<br />
(i) Any amount due and payable to the contractor by the<br />
Railway or any account whatsoever,<br />
(ii) the contractor’s security deposit in the hands of the<br />
Railway administration as far as available, and<br />
(iii)other assets whatsoever of the contractor.<br />
25. EXECUTION OF WORKS:<br />
The work should be carried out as per Electrical<br />
standard specification.<br />
26. VARIATION:<br />
a) For controlling payment in case the agreemental value<br />
goes beyond + 25% , a regulatory mechanism as part of<br />
the contract itself should be built in. For the first<br />
15% increase in the value beyond 25% of agreemental<br />
value, the rates will have a reduction of 2% in the<br />
incremental value of the agreement and for the next 10%<br />
increase in the value, rates will have an additional<br />
reduction of 2% in the further incremental value of the<br />
agreement.<br />
b).<br />
c).<br />
Execution of quantities beyond (+)50% of the overall<br />
agreemental value should not be permitted and, if found<br />
necessary, should be only through fresh tenders or by<br />
negotiating fresh rates with existing contractor as per<br />
procedure laid down by Railway Board in their letter no:<br />
94/CE/CT-1/37 dated 5-5-1995 for variation beyond 25%.<br />
To decide whether the agreemental value will go beyond<br />
50%, as and when 75% of the agreemental has been<br />
executed, the contract should be subjected to a detailed<br />
review and administrative decision by an appropriate<br />
authority ( agreement signing authority) should be<br />
recorded in writing and quantities monitored carefully<br />
and from this stage onwards, execution of further<br />
quantities will have to be monitored at least at the<br />
level of JAG Officers.<br />
27(a) The contractor shall comply with provisions of the<br />
contract labour (Regulation and abolition Act 1970 and<br />
the contract labour Regulation & abolition, Central<br />
Rules 1971), as modifies from time to time wherever<br />
15
(b)<br />
applicable and shall also indemnify the purchase from<br />
and against any claims under the aforesaid act and the<br />
rules.<br />
The contractor shall be responsible to ensure compliance<br />
with provision of 1961 and the rules and order issues<br />
there under from time to time in respect of apprentices<br />
directly or through petty contractors or sub contractors<br />
employed by him for the purpose of carrying out the<br />
contract.<br />
27.1 WORK TO BE DONE AS APPROVED:<br />
The tender shall be finalized in consultation with the<br />
purchaser and approved before commencement of the work and<br />
the contractor shall be held responsible for the execution of<br />
the work in full compliance with approved design and drawings<br />
and drawings modified at site by the purchaser’s Engineer<br />
shall be treated as approved. However, such modifications<br />
shall be incorporated in the design and drawings and<br />
resubmitted for formal approval.<br />
27.2 QUAlITY OF MATERIALS AND WORK DONE:<br />
All erection work carried out shall also be of the best<br />
quality acceptable to the Sr.Divl.Elect.Engineer(TR-D)/East<br />
Central Railway/Dhanbad who shall have the power to reject<br />
the material or order for removal of any work done in his<br />
opinion is faulty or insecure and the contractor shall<br />
replace the same to his satisfaction.<br />
27.3 CONTRACTOR ORGANISATION:<br />
(a) The contractor shall arrange all tools & plants and<br />
facilities necessary for erection, commissioning, and<br />
testing of the equipments in compliance with the<br />
specification at his own cost.<br />
(b)<br />
The contractor shall bring only materials, tools and<br />
plants and other accessories to the site of work which<br />
are to be used in the execution of the contract. The<br />
contractor may store such materials tools and plants etc<br />
at site of work where suitable covered and open space<br />
would be made available to him free of charge. All these<br />
expense connected with the storage and safe custody of<br />
the materials etc shall be incurred by the contractor.<br />
(c) On completion of the work, the contractor shall handover<br />
the site of work completely cleared of all temporary<br />
structure, stores of refuse unless other wise agreed<br />
to by the purchaser.<br />
(d) The contractor shall/will be responsible for transport of<br />
materials from source of supply to the site or work and<br />
for all losses and /or damage in the transfer of<br />
materials and for demurrage or warfage he may incur and<br />
no loss or damage for expenses incurred on this account<br />
will be reimbursed by the purchaser.<br />
16
27.4 PART RECOVERY OF INCOME TAX:<br />
Income tax @ 2% of the gross amount and 15% surcharge on<br />
income tax will be recovered form all the bills of the<br />
contractor in terms of section 134(c) of the Income Tax<br />
Act, 1961 as introduced through the Finance Act 1972.<br />
JST @ 4% to be deducted as the work will be done in the<br />
area of Jharkhand state.<br />
Sr.Divl.Elect.Engineer(TR-D),<br />
East Central Railway,Dhanbad<br />
17
Annexure-I<br />
To<br />
The President of India,<br />
Acting through the Sr.Divl.Elect. Engineer(TR-D),<br />
East Central Railway,<br />
D H A N B A D<br />
Dear Sir,<br />
Reg.: Tender No. TRD/OT/04/05-06/Vehicle dt.24.08.2005.<br />
I I/We…………………………………………………………………………………………...<br />
have read the conditions of the tender attached hereto and agreed<br />
to abide by such conditions. I/We also agree to abide by this<br />
tender for a period of 90 days from the date fixed for opening the<br />
same and in default of my/our so doing will make me/us liable for<br />
forfeiture of my/our security deposit for a period of 90 days.<br />
I/We offer to do the work for ………………………………………………………………...<br />
………………………………………………………………………………………………………...<br />
in Dhanbad division as the rates quoted in the attached schedule<br />
and hereby bind by self/ourselves to complete the works in all<br />
respect in …………………………. days from the date of execution of<br />
agreement.<br />
1. I/We further agree to sign an agreement bond to abide by the<br />
General Conditions of Contract and the Special Conditions<br />
attached herewith and to carry out all works according to the<br />
East Central Railway, Electrical Department standard<br />
specification No. 10TD any other specification mentioned in<br />
the tender.<br />
2. A sum of Rs. ………………………………………………………………………………….<br />
herewith forwarded as Earnest Money in addition to the sum of<br />
Rs. ………………………………. .security deposit mentioned above. The full<br />
value of the earnest money shall stand forfeited without<br />
prejudice to any other rights of remedies.<br />
a) I/We do not execute the contract documents within seven<br />
days from receipt of notice issued by the Railway such<br />
documents are ready.<br />
b) I/We do not commence the work within tend days also<br />
receive of order to the effect.<br />
3. I/We have already made a lump sum Rs. …………………………………………..<br />
towards Earnest Money by receipt No. …………………………………………………..<br />
date…………2005 and as such no further deposit is made and I/We<br />
further agree to declare that in case I/We fail to abide by<br />
the condition of keep open this order for a period of 90<br />
days. I/We shall have no objection to the forfeiture of<br />
“Security Deposit” portion of the Earnest Money the<br />
amounting to Rs. ………………………………………………. and the said amount<br />
realized by the President of India also from my said lump sum<br />
deposit Rs………………………………………<br />
18
I/We have deposited with the Divl. Cashier, East Central<br />
Railway, Dhanbad, Chief Cashier, East Central Railway, Hajipur,<br />
the required earnest money of Rs. ……………………………. only for which<br />
Receipt No. ……………………………………………….. dt. ……………………. has been granted<br />
which is enclosed.<br />
OR<br />
I/We enclosed the requisite earnest money in form of …………………<br />
……………………………….for Rs…………………………………………………… only in respect of this<br />
tender.<br />
I/We have no retired Engineer or gazetted officer of the<br />
Electrical department any of the Railway and none of the my/our<br />
relatives are working in the Railway at present.<br />
Yours faithfully,<br />
Signature of the Tenderer(s)<br />
with seal and date<br />
WITNESS:-<br />
19
ANNEXURE - II<br />
Please fill in the questionnaires below:-<br />
The following documents should be specified for submission along<br />
with tender.<br />
a) List of personnel organization available on :<br />
hand and proposed to be engaged for the<br />
subject work.<br />
b) List of Plant & Machinery available on :<br />
hand (own) and proposed to be inducted<br />
(own and hired to be given separately) for<br />
the subject work.<br />
c) List of Works completed in the last three :<br />
financial years giving description of work,<br />
organization for whom executed, approximate<br />
value of contract at the time of award, date<br />
of award and date of scheduled completion<br />
of work. Date of actual start, actual completion<br />
and final value of contract should also be<br />
given.<br />
d) List of works on hand indicating description :<br />
of work, Contract value, approximate value<br />
of balance work yet to be done and date of<br />
award.<br />
NOTE:<br />
1. In case of items (c) and (d) above, supportive<br />
documents/certificates from the organizations with whom they<br />
worked/are working should be enclosed.<br />
2. Certificates from private individuals for whom such works are<br />
executed/being executed should not be enclosed.<br />
20
AGREEMENT<br />
Form-1<br />
AN AGREEMENT made this …………………………………. day on two<br />
thousand………… between ………………………………………………herein (after referred<br />
to as “the contractor”) of the one part and the President of<br />
India, acting in the premises through the Sr.Divisional<br />
Electrical Engineer(TR-D)/East Central Railway/Dhanbad<br />
(hereafter referred to as the Purchaser) of the other part.<br />
Whereas in response to a call for tender for<br />
………………………………………. ………………………………………………………………………………………………... as<br />
per tender paper No. ……………………………………………………………. at<br />
Annexure –‘A’ hereto the contractor has submitted a tender<br />
as per Annexure-‘B’ hereto and whereas the said tender of the<br />
contractor has been accepted for …………….. ……………………………………..as<br />
per copy of letter of acceptance of Tender<br />
No………………………………………………………dated………………………………. completed with<br />
enclosures at the accepted rates and agreed deviations from<br />
the said tender papers as per Annexure-“C”. Rs………………………………<br />
(Rupees …………………………………………………………………………………………..only).<br />
Now this agreement with witnesses that in consideration<br />
of the premises and the payment to be made by the Purchaser<br />
to the Contractor provided for herein below the Contractor<br />
shall supply all equipments and materials and execute and<br />
perform all works for which the said tender of the Contractor<br />
has been accepted strictly according to various provision in<br />
Annexure-“A & C” hereto and upon such supply, execution and<br />
performance to the satisfaction of the Purchaser, the<br />
Purchaser shall pay to the contractor at the several rates<br />
accepted as per the said Annexure-“C “ and in terms of the<br />
provisions therein.<br />
In witness whereof the parties have hereinto set and<br />
subscribed their respective hands and/or scale the day and<br />
year respectively mentioned against their respective<br />
signatures.<br />
Signed and delivered at …………………by Shri<br />
………………………………...for and on behalf of M/s. ……………………<br />
…………………………….the Contractor within named in the presence of :-<br />
1. Signature : ……………………………………………………..<br />
Date : ……………………………………………………..<br />
Name in Block Letters : …………………………………………………….<br />
Address : ……………………………………………………..<br />
2. Signature : ……………………………………………………<br />
Date : ……………………………………………………<br />
Name in Block Letters : ……………………………………………………<br />
Address : ……………………………………………………<br />
21
Signed and derived at ………………………. for an on behalf of the<br />
President of India by Shri ……………………… …………….East Central<br />
Railway, Dhanbad in the presence of :<br />
1. Signature : ………………………………………………………...<br />
Name in Block Letters : ………………………………………………………...<br />
2. Signature : ………………………………………………………...<br />
Name in Block Letters : ………………………………………………………...<br />
Annexure – “A” : Tender Papers No. ……………………………………………………….<br />
Annexure – “B” : Firm’s Tender No. ………………………………………………………<br />
Annexure– “C” : Letter of acceptance of Tender …………………………<br />
Dated …………………………complete with enclosure.<br />
22
FORM-2<br />
STANDING INDEMITY BOND FOR “ON ACCOUNT” PAYMENTS.<br />
(On paper of requisite stamp value)<br />
We, M/s. …………………………………………………………….hereby undertakes that<br />
we hold at our stores depot/s at ……………………………………..for and on<br />
behalf of the President of India acting in the premises<br />
through the Sr.Divl.Elect.Engieer(TR-D)/East Central Railway,<br />
Dhanbad (herein after referred to as the purchaser) and his<br />
property in trust for him all imported and indigenous<br />
materials/works for which on account Payments have been<br />
made to us against the contractor for<br />
…………………………………………………………………………………………………………………………………………………………………<br />
……………….. vide letter of acceptance of tender No.:<br />
………………………………………………dated………………. and materials handed over to<br />
us by the purchaser for the purpose of execution of the said<br />
contact, until such time the materials/works are duly erected<br />
or otherwise handed over to him.<br />
We shall be entirely responsible for the safe custody<br />
and protection of the said materials against all rise till<br />
they are dully delivered as erected equipment to the<br />
purchaser or as he may direct otherwise and shall indemnify<br />
the purchaser against any loss, damaged or deterioration<br />
whatsoever in respect of the said materials while in our<br />
possession and against disposal of surplus materials. The<br />
said materials/works shall at all this be open for inspection<br />
by any officer authorized by the purchaser.<br />
Should any loss, damage or deterioration of<br />
materials/works occur or surplus materials disposed off and<br />
refund becomes due, the purchaser shall be entitled to<br />
recover forms us the full cost as per prices included in the<br />
contract and also compensation for such loss or damage, if<br />
any also with the amount to be refunded without prejudice to<br />
any other remedies available to him by deduction from any<br />
such due or any sum which at any time hereafter becomes due<br />
to us under the said or any other contract.<br />
Dated , the ………………………………. ……….day of …………………<br />
For and on behalf of<br />
M/s. …………………………………………..<br />
(Contractor)<br />
Signature of witness:-<br />
Name of witness ( in Block capital letters):………………………………………………………<br />
Address : ……………………………………………………………………………………..<br />
23
SCHEDULE OF RATES<br />
Name of Work : Repairing of Vehicle No.BR-14P-1508.<br />
Annexure- III/A<br />
Item Description Part No. Unit Quantity Rate Breakup of rate<br />
Total Amount<br />
No. of item<br />
Store Cash/ In Figure In words<br />
Labour<br />
1<br />
2 3 4 5 6 6A 6B 7 8<br />
1 Body shell O10AK0010N No 1<br />
CED<br />
2 Front door LH 0081277 No. 1<br />
9<br />
3 Front Door RH 0081278 No 1<br />
4 Rear Door LH 0080476 No 1<br />
5 Rear Door RH<br />
No 1<br />
008047<br />
6 Back Door Assly. 0088506 No. 1<br />
7<br />
Wheel Rim 0088273 No 4<br />
8 King Pin Bearing 0019401 No 4<br />
Knuckle Kit (908226 No 1<br />
10 Front Axle Bim 0057565 No 1<br />
11 Tie Rod End 0018277 No 1<br />
12 Windshield Glass 0081170 No 1<br />
13 Front Hub<br />
0019406 No 4<br />
Bearing<br />
14 Radiator<br />
No 1<br />
Assembly 0082511<br />
15 Piston Ring Set 9420001125 Set 1<br />
16 Valve Kit 9420000674 No 1<br />
24
Item Description<br />
Part No. Unit Quantity Rate Breakup of rate<br />
Total Amount<br />
No. of item<br />
Store Cash/ In Figure In words<br />
Labour<br />
1<br />
2 3 4 5 6 6A 6B 7 8<br />
17 Main Bearing 1St. 7902101900 No 1<br />
18 Big End Bearing 1 St .<br />
19<br />
20<br />
9420000480 No 1<br />
Valve Tappet 7910031879 No 8<br />
Gasket Set1St 79020003811M Set 1<br />
21 Main Bearing oil 00085768 No 2<br />
seal<br />
22 Thrust washer 7932566164 No 1<br />
23<br />
24<br />
Cooling Fan 791007436 No 1<br />
Heater Plug 7932567717 No 4<br />
25 Hub Oil Seal 0502CA0080N No 4<br />
26<br />
27<br />
28<br />
29<br />
Bonnet Assembly 0098829 No 1<br />
Clutch Plate 0085075 No 1<br />
Pressure Plate 0071509 No 1<br />
Release bearing 0088661 No 1<br />
30 Hub Bearing 00644366 No 1<br />
31<br />
32<br />
Clutch Fork 0630012 No 1<br />
Spring 0630017 No 1<br />
33 Kit Universal Joint 0906929 No 2<br />
34 Wheel cylinder kit 0055878 No 4<br />
25
35 Rear wheel cylinder 0032284 No 2<br />
kit<br />
36 Front Brake shoe 0055873 No 1<br />
37 Rear Brake shoe 0092291 No 1<br />
38 Rear Bumper LH 0088412 No 1<br />
39 Rear Bumper RH 0088413 No 1<br />
40 Front feeder LH 00029803 No 1<br />
41 Front feeder RH 00298804 No 1<br />
42 Kit steering lock 0098433 No 1<br />
43 Indicator Lamp LH 0090860 No 1<br />
44 Indicator Lamp RH 0090861 No 1<br />
45 Side Marker Lamp 0065872 No 1<br />
46 Grease G001 Kg 1<br />
47 Engine Oil MAX56K Ltrs 8<br />
48 Oil Filter EK3807A No 1<br />
49 Diesel Filter 7902000096 No 2<br />
50 Head Light Assly 1701AA0170N No 2<br />
51 Rear indicator Lamp<br />
LH<br />
52 Rear Indicator Lamp<br />
RH<br />
17030A0030N No<br />
17030A0020N No<br />
1<br />
1<br />
26
Description Part No. Unit Quantity Rate Breakup of rate<br />
Total Amount<br />
of item<br />
Store Cash/ In Figure In words<br />
Labour<br />
1<br />
2 3 4 5 6 6A 6B 7 8<br />
53 Engine Mounting 9420000295 No 2<br />
54 Fuel Tank Assly 0078293<br />
No 1<br />
55<br />
56<br />
Valve Seat 7932560798 No 8<br />
Front Bumper 0098710 No 1<br />
1<br />
Body shell<br />
change<br />
No 1<br />
Labour Charge<br />
2<br />
3<br />
4<br />
Painting &<br />
Denting full<br />
vehicle<br />
No 1<br />
Engine<br />
No 1<br />
Overhauling<br />
F.I.Pump O/H No 1<br />
5<br />
General work<br />
like Hub<br />
greasing type of<br />
Elect/Mech.Job<br />
No 1<br />
Signature of Tenderer with Seal<br />
27
Annexure-III(B)<br />
Special Terms & Conditions<br />
1. Terms of payment:<br />
85% payment shall be made against each work order after<br />
deducting the necessary taxes as per para 27.10 and any<br />
amount due on account of penalty.<br />
2. The offer of those tenderer shall be considered who have<br />
their service center/garage with all facilities necessary for<br />
repair of a Mahindra & Mahindra make commander jeep.<br />
3. Shifting of vehicles from Dhanbad to their workshop/service<br />
center is to be done by the firm at their own arrangement.<br />
4. Items to be used in repairing of vehicles should be original<br />
of Mahindra & mahindra company. Tenderer will have to provide<br />
the documentary evidence of purchased all parts replaced from<br />
authorized M&M service center/dealer.<br />
5. Minor repairing , if required during repairing of the<br />
vehicle is to be done by firm itself.<br />
6. All released materials should be handed over to SSE/TRD/DHN.<br />
29
Annexure-IV<br />
EXPLANATORY<br />
NOTES<br />
1. For item No. (1) to (56) as enlisted in schedule of<br />
rates (Annexure-III/A), has to be replaced in course of<br />
repairing, with new and original spare parts of Mahindra<br />
& Mahindra make. The supporting documentary evidence<br />
should be produced to the purchaser in proof of<br />
genuineness and OEM spare parts before fitment in the<br />
vehicle.<br />
**********<br />
29