TENDER NO. TRD/OT/04/2005-06/Vehicle<br />

DATED 24.08.2005.<br />

TENDER PAPER<br />

FOR<br />

Repairing of Vehicle<br />

(Jeep No:BR-14P.1508(Make Mahindra &<br />

Mahindra) under Sr.Sec.Engineer(Tr-D)East<br />

Central Railway/Dhanbad.<br />

in<br />

Dhanbad division<br />

of<br />

East Central Railway<br />

Issued by:-<br />

Sr. Divl. Electrical Engineer(Tr.-D)<br />

East Central Railway<br />

DHANBAD<br />

Copy No.:<br />

Issued to:<br />

Price: Rs. 500/-<br />

1


East Central Railway<br />

Electrical Department<br />

Repairing of Vehicle (Jeep No: BR-14P-1508(Mahindra &<br />

Mahindra) under Sr.Section Engineer(Tr-D)<br />

East Central Railway/Dhanbad.<br />

No.TRD/OT/04/2005-06/Vehicle Dated 24.8.05<br />

Divl. Railway Manager (Tr.-D), East Central Railway, Dhanbad<br />

invites sealed open tender, from Technically and financially sound<br />

firms, for the work for annual maintenance for miscellaneous works<br />

for repair and maintenance of TRD equipments in GC & CIC section<br />

of Dhanbad division.<br />

1. Approximate Cost Rs. 2,49,051/-(Rupees Two<br />

lakh forty nine thousand<br />

fifty one only approx.)<br />

2. Earnest Money Rs.6250/- (Rupees Six thousand<br />

Two hundred fifty only)<br />

3. Date of selling of 19.9.2005 to 05.10.2005<br />

Tender Papers<br />

Any working day from 12.00 hrs.<br />

to 15.00 hrs. (except Saturday,<br />

Sunday & Holidays)<br />

4. Venue Office of the,<br />

i)Chief Electrical Engineer/East<br />

Central Railway/Hajipur.<br />

ii)Divl. Railway Manager(TR-D),<br />

Dhanbad, Mughalsarai & Danapur.<br />

5. Date & Time of Opening of At15.30 Hrs. on 6.10.2005<br />

Tender<br />

6. Cost of tender paper Rs.500/-(Rupees five hundred only)<br />

7. Venue of submission of 12.00 hrs. to 15.00 hrs.between<br />

Tenders 19.09.05 to 06.10.05 at the<br />

places mentioned at item 4.<br />

8. Period of completion of work 03 months(90 days) from the<br />

date of issue of Letter of<br />

Intent /Letter of Acceptance<br />

whichever is earlier.<br />

2


9. Eligibility Criteria(costing above Rs.10 lakh):-<br />

i) Should have completed<br />

in last three<br />

financial years (i.e.<br />

current year & 3<br />

previous financial<br />

years):<br />

ii) Total contractual<br />

payment received<br />

during the last 3<br />

years and in the<br />

current financial<br />

year:<br />

iii) Electrical<br />

Contractor’s License<br />

At least one similar<br />

single work, for a<br />

minimum value of 35% of<br />

Advertised tender value<br />

of work.<br />

Should be a minimum of<br />

150% of Advertised tender<br />

value.<br />

Tenderer should have a<br />

valid and current<br />

Electrical Contractor’s<br />

License.<br />

10. Tenderers are advised to visit the site of work and familiarize<br />

themselves with site conditions and quantum of works in their<br />

own interest.<br />

11. Tender must be accompanied by prescribed amount of earnest money<br />

in acceptable form as mentioned in the tender documents. Earnest<br />

money in the form of guarantee bond will not be accepted.<br />

Tenders without prescribed earnest money will be summarily<br />

rejected.<br />

12. In case of date of opening is declared as holiday or is closed<br />

due to adverse conditions arising due to natural<br />

calamity/unavoidable circumstances the tenders will be opened on<br />

following working day at same time and venue.<br />

13. Railway reserves the right to either cancel the tender or reject<br />

any or all the tenders without assigning any reason thereof.<br />

Sr. Divl. Elect.Engineer(Tr.-D),<br />

For Divl. Railway Manager(Tr.-D)<br />

East Central Railway<br />

Dhanbad.<br />

3


NOTE TO TENDERER<br />

Tenderer must comply with all points mentioned in the tender<br />

paper. Failing to do this, the Railway reserves the right to<br />

summarily reject the tender without assigning any reason to the<br />

tenderer.<br />

NOTE TO CONTRACTOR(SUCCESSFUL TENDERER)<br />

Weekly Progress Report:<br />

Successful tenderer must submit regular weekly progress<br />

report. Non submission of such report will mean default.<br />

MODE OF INSPECTION:<br />

Before giving a call for inspection, the contractor must ensure<br />

that the work offered for inspection is actually completed. Non<br />

complete of this procedure will earn discredit for the contractor<br />

in as much to the same will be booked as a defect in the<br />

inspection report.<br />

Final call for inspection must be given at least 15 days before<br />

the proposed date of inspection. Measurement of works will be as<br />

per relevant part of the general condition of contract.<br />

Physical completion has to be ensured at least 15 days before<br />

expiry of completion date to avoid extension of completion period.<br />

DEPARTMENTALLY TAKING OVER OF AN ITEM OF WORK TO SPEED UP<br />

PROGRESS:<br />

Any work can be taken over departmentally. All materials<br />

as included in the schedule are primarily required to be supplied<br />

by contractor. But for benefit of Railway item of work may be<br />

taken over fully or in part, as per decision of the Engineer of<br />

the Railway and the same will be deleted at a suitable date later<br />

on.<br />

GENERAL CONDITION OF THE TENDER<br />

1.1 The tender papers are not transferable<br />

1.2 No tender will be considered unless accompanied by:<br />

a) Documents in proof of deposit of the sum specified in the<br />

preamble to the tender towards the earnest money<br />

deposit.<br />

b) Full particulars of Electrical contractor’s license and<br />

the class of license held by him, the name and class of<br />

license held by his supervisors, Photostat copy of Elect.<br />

Contractor license and supervisor’s license etc<br />

c) Documents to show that the tenderer will engage a<br />

technically qualified person to physically supervise his<br />

works if his tender is accepted.<br />

4


1.3 No tender paper may be considered unless accompanied by:-<br />

a) The offer letter as an Annexure-I duly filled in and<br />

signed.<br />

b) Tenderer credential as in Annexure-II duly filled in and<br />

signed.<br />

c) Explanatory note for schedule of work is given in<br />

Annexure-IV.<br />

2. DEPOSITING OF EARNEST MONEY:<br />

2.1 Earnest money will be deposited in cash or in any of the<br />

following forms:-<br />

a) In cash (on which no interest will occur) to be deposited<br />

with the Divisional Cashier, East Central Railway, Dhanbad<br />

or with the Chief Cashier, East Central Railway,Hajipur.<br />

b) Deposit receipts/pay order/demand draft in favour of<br />

FA&CAO/East Central Railway / Hajipur issued by the State<br />

Bank or any of schedule Bank approved by the Reserve Bank<br />

of India.<br />

c) No cheque will be accepted even if it is guaranteed by<br />

the Bank.<br />

d) The tenderer who have standing deposit of earnest money<br />

with the Railway administration need not to deposit any<br />

fresh earnest money while submitting the tenders.<br />

2.2 No interest will be occurred on the earnest money. The<br />

earnest money will be refunded to the un-successful tenderer.<br />

2.3 Request for transfer of earnest money and or security deposit<br />

of work even if the same is free from all obligations will<br />

not be accepted for the purpose of earnest money.<br />

2.4 The tenderer will be summarily rejected unless requisite<br />

earnest money is paid in full.<br />

2.5 The earnest money that the tenderer is required to deposit<br />

along with tender, amount indicated in the preamble of the<br />

tender which is inclusive of security deposit of extent of<br />

1/5 th of the earnest money deposited for due performance of<br />

the stipulation to keep the offer open for a period of 90<br />

days from the date of opening of the tender, it being<br />

understood that the tender documents have been sold to the<br />

tenderer and the tenderer being permitted to tender in<br />

consideration of the stipulation on his part that after<br />

submitting the tender he will not resile from his offer or<br />

modify the terms and conditions thereof in a manner not<br />

acceptable to the Sr.Divl.Elect. Engineer(TR-D)/East Central<br />

Railway/Dhanbad & is liable to be forfeited by the Railway in<br />

the event of the failure on the part of the tenderer to<br />

observe and comply with the foregoing stipulation of the<br />

tender.<br />

5


3. SECURITY DEPOSITE:<br />

3.1 On receipt of the acceptance of the tender from the Railway<br />

the successful tenderer will be required to furnish the<br />

Railway with security deposit as finally worked out after<br />

opening of the tender, in the following manner, within<br />

seven(7) days from the issue of the acceptance letter.<br />

SECURITY DEPOSIT:-<br />

i) For contract upto Rs. 1 Lakh and : 10% of the value of<br />

the contract.<br />

ii) For contract more than Rs. 1 Lakh : 10% of the first 1<br />

and upto Rs. 2 Lakhs.<br />

lakh & 7.5% of the<br />

balance.<br />

iii) For contract more than 2 Lakhs and : 10% of the 1 st 1 Lakh,<br />

Upto 2 crores.<br />

7.5% of the next 1 lakh,<br />

& 5% of the balance<br />

subject tothe maximum<br />

3 Lakhs.<br />

iv) For contract above Rs. 2 crores. : 5% of the contract<br />

value. The amount<br />

over and above 3<br />

lakhs to be recovered<br />

from progressive<br />

bills of the<br />

contractor till it<br />

reaches 5% of the<br />

contract value.<br />

3.2 The security money should be deposited in any of the<br />

following form:-<br />

a) In cash (on which no interest will occur) to be deposited<br />

with Divisional Cashier, East Central Railway, Dhanbad or<br />

Chief Cashier, East Central Railway,Hajipur.<br />

b) Guarantee Bond in favour of FA&CAO/East Central<br />

Rly/Hajipur executed by State Bank of India or any other<br />

Nationalised Bank of India. The bond should be prepared on<br />

prescribed form and should be valid for not less than 18<br />

months.<br />

c) Deposit receipts/pay orders/demand drafts in favour of<br />

FA&CAO/East Central Rly./Hajipur issued by State Bank of<br />

India or any other Nationalized Bank or any of the<br />

scheduled Bank approved by the Reserve Bank of India.<br />

d) Government securities of 5% below the market value.<br />

3.3 Should the validity of such guarantee Bond towards the<br />

security deposit, expire before the Security becomes due for<br />

refund; it will be the responsibility of the contractor to<br />

cause to be extended the validity of the guarantee Bond for<br />

an agreed period. In case of failure to do so the<br />

Administration will deduct from his bills an equivalent<br />

amount of security without further reference to him. The<br />

6


validity of guarantee Bond should cover the guarantee period<br />

plus 3 months additional time.<br />

3.4 The total security deposit will be retained by the Railway<br />

administration for a period 12 months from the date of<br />

completion of work without any interest being occurred and<br />

will be released after the guarantee period is over and issue<br />

of certificate for performance of the work by the<br />

representative of the Railway.<br />

3.5 The executed work as covered in the contract, should be<br />

guaranteed for trouble free operation for a period of 12<br />

months from the date of completion of work in all respect.<br />

Any defects due to faulty designed, bad workmanship or use of<br />

inferior quality of materials, that may be developed or be<br />

noticed during the period shall be repaired or replaced by<br />

the contractor free of cost at the site of works executed<br />

within the reasonable time.<br />

3.6 The Railway administration shall be entitled to deduct from<br />

the security deposit the requisite amount for any loss or<br />

damage from the contractor, which the Railway administration<br />

may be put to for any reason of any act for default<br />

recoverable by the Railway from the contractor or to call<br />

upon the contractor to maintain deposit at its original limit<br />

by making further deposit. In the event of contractor failing<br />

to make and maintain a security deposit in the manner<br />

aforesaid, any money lodged with the tender by him will be<br />

liable to be forfeited, the Railway shall be entitled to<br />

cancel the acceptance of the tender. No cheque will be<br />

accepted for security deposit even if it is guarantied by the<br />

Bank.<br />

4. SUBMISSION OF TENDER:<br />

The tenderer shall submit the tender in a sealed cover<br />

addressed to Sr. Divl. Elect. Engineer (TRD)/East Central<br />

Railway/Dhanbad, subscribed on the cover “Tender No and Name<br />

of the work in full” and delivered in the sealed tender box<br />

located in the office of the Chief Electrical<br />

Engineer,E.C.Rly., Hajipur, Sr. Divisional Electrical<br />

Engineer/TRD/East Central Railway/Dhanbad, Danapur &<br />

Mughalsarai from 19.09.2005 to 05.10..2005 between 12.00<br />

hrs. to 15.00 hrs. on any of the working day(except Saturday,<br />

Sunday and Holiday) and on 06.10.2005 between 10.00 hrs. to<br />

12.00 hrs..<br />

5. OPENING OF TENDER:<br />

The tender shall be opened in the office of the Chief<br />

Electrical Engineer, E.C. Rly., Hajipur, Sr.Divl. Elect.<br />

Engineer/TR-D/ East Central Railway/Dhanbad, Danapur and<br />

Mughalsarai in presence of the tenderers or their authorized<br />

representative as may be present at the prescribed time and<br />

date specified in the preamble to the tender papers.<br />

7


6. EXECUTION OF THE AGREEMENT:<br />

The successful tenderer shall have to sign an agreement for<br />

the work in standard form to be supplied at the time of<br />

execution of tender by the administration after security<br />

deposit and within seven days from the date of issue of the<br />

acceptance letter failing which his earnest money will be<br />

forfeited.<br />

7. GENERAL CONDITION OF CONTRACT:<br />

The acceptance of the tender and execution of the contract<br />

shall be governed by the “General Condition of the Contract”<br />

(as amended upto date) and same where modified within these<br />

tender papers. The copy of the serial shall not be supply by<br />

the Railway and shall have to arranged by the contractor at<br />

his own source and cost (The copy may be obtained by the<br />

tenderer from Chief Engineer/ Con’s office at 14, Strand<br />

Road, Kolkata-1).<br />

8. CONSTITUTION OF THE FIRMS:<br />

Original documents of the constitution of their firms,<br />

partnership deed and the power of attorney, if any, to other<br />

duly signed by the person who signed the original documents,<br />

shall have to be submitted to the Railway for verification.<br />

The original documents will be returned to the tenderer after<br />

verification.<br />

9. RATES TO INCUDE ALL TAXES:<br />

The rates quoted should be inclusive of all taxes, octroi,<br />

duties, royalty existing or that may be imposed in future.<br />

10. <strong>RAILWAY</strong> PASS OR CONCESSION:<br />

No Railway Pass and concession tickets/freight for men and<br />

materials of the contactor will be granted by the Railway.<br />

11. COMMENCEMENT OF WORK:<br />

The successful tenderer shall have to start the work within 7<br />

days from the date of issue of work order.<br />

12. COMPLETION TIME:<br />

03 Month(three months)/90 Days(Ninety days) from the date of<br />

issue of Letter of Intent/Letter of Acceptance.<br />

13. EXTENSION OF TIME:<br />

In the event of failure on the part of the contractor to<br />

complete the work within the time as specified above on any<br />

ground accepted by the Railway administration as reasonable<br />

and on approach by the contractor in such circumstances for<br />

extension of time the Railway administration may allow<br />

additional time to the extent as would be considered<br />

reasonable by the Railway administration, such consideration<br />

being in the absolute discretion of the Railway<br />

administration for which the contractor shall not be entitled<br />

to any compensation.<br />

8


14. PENALTY FOR DELAY IN COMPLETION:<br />

The time for the execution of the work or part of the If<br />

the work is not completed within the stipulated period of 30<br />

(thirty) days from the date of issue of work order, a penalty<br />

of 2% (two percent) per day or part thereof, of the value of<br />

the work order will be imposed for the period by which the<br />

completion is delayed beyond the stipulated date of<br />

completion as per the work order.<br />

15. TERMINATION OF THE CONTRACT:<br />

The contract shall be terminated by the Railway<br />

administration as per clause provided in the General<br />

Condition of the Contract A6-54.<br />

16. TERMS OF PAYMENT:<br />

subject to any deduction or recovery which purchaser may be<br />

entitled to make under the contract, the contractor unless<br />

otherwise agreed to, shall be entitled to get the following<br />

payments:-<br />

i) Running bills may be paid to the contractor at the<br />

discretion of the Sr.Divl.Elect. Engineer/TRD/ East<br />

Central Rly/Dhanbad. The running bills will be released<br />

upto 85% (eighty five percent) of the value of work<br />

done.<br />

ii) Remaining 15 % (fifteen percent) of all on account bills<br />

will be released at the time of arranging final payment.<br />

17. CONTRACTORS RESPONSIBILITY FOR DISCREPENCIES:<br />

i) The rates quoted by the contractors shall be based on<br />

and through study of the nature and quantum of work<br />

covered under this tender.<br />

ii) The contractor shall be solely responsible for the<br />

correctness of the work according to the drawing and<br />

specifications as covered in the contract not<br />

withstanding that he may have been assigned by the<br />

purchaser or his representative in setting out the same.<br />

iii) All the materials supplied by the contractors for<br />

execution of the work, should be get inspected and<br />

approved by the purchaser or his authorized<br />

representative before they are fitted/commissioned and<br />

the certificate issued to this effect should be<br />

submitted to this office.<br />

iv) Any work executed with un approved materials shall<br />

entirely the responsibility of the contractor.<br />

v) The contractor shall ensure that during execution of the<br />

work at site one of his competent supervisor is always<br />

available at site to execute the work as per<br />

specification, drawing of the contract & also to take<br />

the necessary instruction in relation to the execution<br />

of the work from the purchasers or his authorized<br />

representative.<br />

9


vi) The contractor shall during the process of work be<br />

entirely responsible for the custody of its stores or<br />

equipments for the work executed at the site.<br />

vii) The contractor shall arrange his own accommodation if<br />

necessary, for the purpose of storing materials and<br />

tools.<br />

viii)Any information relating to the tender or clarification<br />

in connection therewith may be obtained from the office<br />

of the Senior Divisional Electrical Engineer/TRD/ East<br />

Central Railway/Dhanbad on any working day during office<br />

hours.<br />

18. ACCEPTANCE OF TENDER AND THE CONDITIONS IN CONNECTION<br />

THEREWITH:<br />

i) The tender shall hold the offer open till such date as<br />

specified in the tender. It is understood that the<br />

tender documents have been sold to the tenderer and the<br />

tenderer is/are being permitted to tender in<br />

consideration of the stipulation on his/their part that<br />

after offer submitting his/their tender, he /they will<br />

not resign from their offer or modify the terms and<br />

conditions thereof in a manner not acceptable to the<br />

Sr.Divl. Electrical Engineer/TRD/East Central<br />

Railway/Dhanbad, should the tenderer fail to observe or<br />

comply with the foregoing stipulation, on the amount<br />

deposited as security for due performance of the above<br />

stipulation shall be forfeited to the Railway. If the<br />

tender is accepted the amount of earnest money will be<br />

held as security deposit for the due and faithful<br />

fulfillment of the contractor. The earnest money will be<br />

returned to the unsuccessful tenderers by the Railway,<br />

shall not be responsible for any loss or depreciation<br />

that may happen to the security, for the due performance<br />

or stipulation to keep the offer open for the period<br />

specified in the tender documents or the earnest money<br />

while in the possession, not be liable to pay interest<br />

there on.<br />

ii)<br />

It shall not be obligatory on the said authority to<br />

accept the lowest tender and no tenderer shall demand<br />

any explanation for the cause of rejection of his/their<br />

tender.<br />

iii) If the tenderer/s deliberately give/s wrong information<br />

in his/their tender or creates/create circumstances for<br />

the acceptance of his/their tender, Railway reserves the<br />

right to reject such tender at any stage.<br />

iv) If a tenderer expires after the submission of his/their<br />

tender or after the acceptance of his/their tender, the<br />

Railway shall deem such tender as cancelled. If a<br />

partner of a firm expires after submission of their<br />

tender or after the acceptance of their tender, the<br />

Railway shall deem such tender as cancelled.<br />

10


v) The earnest money including the amount taken as security<br />

deposit for the due performance of the stipulation to<br />

keep the offer open till the date specified in the<br />

tender will be refunded to the unsuccessful<br />

tenderer/tenderers within a reasonable time. The earnest<br />

money deposited by the successful tenderer/tenderers<br />

will be retained towards the security deposit for due<br />

and faithful fulfillment of the contract but shall be<br />

forfeited if the contractor fails to execute the<br />

‘Agreement Bond’ within seven days of the notification<br />

of the acceptance of his/their tender or commence the<br />

work within seven days after receipt of orders to that<br />

effect.<br />

vi) Non-compliance with any of the stipulations and<br />

conditions herein above is liable to result in the<br />

tender being rejected.<br />

vii) The authority for the acceptance of the tender will rest<br />

with the Sr. Divl.Elect.Engineer(TR-D)/East Central<br />

Railway, Dhanbad who does not bind himself to accept the<br />

lowest or any other tender nor does be undertake to<br />

assign reasons for declining to consider any particular<br />

tender or tenderers.<br />

viii)The tenderer shall keep the offer open for a minimum<br />

period of 90(Ninety) days from the date of opening of<br />

the tender, within which period the tender can not<br />

withdraw his offer subject to the period being extended<br />

further if required, by mutual agreement from the time<br />

to time. Any contravention of the above condition will<br />

make the tenderer liable for forfeiture of his security<br />

deposit.<br />

ix) Should a tenderer or contractor on the list of approved<br />

contractors have a relative or relatives or in the case<br />

of a firm or company of contractors one or move of its<br />

share holders or a relative or relatives of share holder<br />

employed in gazetted capacity in the Elect. Engineer<br />

Deptt. of the East Central Railway. The authority<br />

inviting tender shall be informed of the fact at the<br />

time of submission of tender, falling which the tender<br />

may be disqualified of such fact subsequently comes to<br />

light the tender/contract may be rescinded in accordance<br />

with the provision in clause 61 of the General Condition<br />

of the contract.<br />

x) Should a tenderer be a retired Engineer of the gazetted<br />

rank or any other gazetted officer working before his<br />

retirement whether in the executive or administrative<br />

capacity or whether in the holding a pensionable post<br />

administrated by the President of India for the time<br />

being or should a tenderer being partnership firm have a<br />

11


one of its partners a retired Engineer or a retired<br />

gazetted as aforesaid or should a tenderer being an<br />

incorporated company have any such retired Engineer or<br />

retired officer as one of its directors, or should a<br />

tenderer have in his employment any retired Engineer or<br />

retired officer as aforesaid the full information to the<br />

date of retirement of such Engineer or gazetted officer<br />

from the said service and in case where Engineer or<br />

officer had not retired from Govt. service and in cases<br />

where Engineer or officer had not retired from Govt.<br />

service at least two years prior to the date of the<br />

submission of tender as to whether permission for taking<br />

such contact, of if the contractor be a partnership firm<br />

or any incorporated company to become a partner or<br />

director as the case may be or to take employment under<br />

the contractor, has been obtained by the tenderer or the<br />

Engineer of the contractor as the case may be from the<br />

President of India or any officer authorized by him in<br />

his behalf shall be clearly stated in writing at the<br />

time of submitting the tender without the information<br />

above referred to or statement to the effect that no<br />

such retired Engineer or retired gazetted officer is so<br />

associated with the tender, as the case may be shall be<br />

rejected.<br />

xi)<br />

All materials for this work are to be supplied by the<br />

contractor for all the items, other than those<br />

specified.<br />

xii) The final acceptance of the tender shall rest with the<br />

Sr.Divl.Elect.Engineer(TR-D/East Central Railway/Dhanbad<br />

or his representative who reserves the right to accept<br />

or reject any tender or part thereof without assigning<br />

any reason thereof and does not blind himself to accept<br />

the lowest tender only.<br />

19. ARBITRATION:<br />

i) Matters in question of dispute or difference to be<br />

attributed upon shall be referred for decision to:-<br />

a) A sole arbitrator who shall be the Chief Electrical<br />

Engineer/East Central Railway/Hajipur or a person<br />

nominated by him in that behalf in cases where the<br />

claim in question is below Rs. 50,000/- and in cases<br />

where the issues involved are not a complicated<br />

nature. The Chief Electrical Engineer shall be the<br />

sole judge to decide whether or not the issue<br />

involved of a complicated nature.<br />

b) The arbitrators, who shall be gazetted Railway<br />

Officer of equal status to be appointed in the manner<br />

laid down in sub para (ii) below for all claims of<br />

Rs. 50,000/- and above, and for the issue involved<br />

12


are of a complicated nature. The Chief Electrical<br />

Engineer/East Central Railway/Hajipur shall be the<br />

sole judge to decide whether the issues are of a<br />

complicated nature or not. In the event of the two<br />

arbitrators being decided in their opinion the matter<br />

under dispute will be referred to an umpire to be<br />

appointed in the matter laid down in sub para (ii)<br />

for his decision.<br />

ii) For the purpose of appointing two arbitrators as<br />

referred to in sub para(i) (b) above, the Railway will<br />

send a panel or move than their names of officers of the<br />

appropriate status of one or more than three names<br />

of officers, of the appropriate status or one or more<br />

departments of the Railway to the contractors who will<br />

be asked to suggest a panel of three names out of the<br />

list so sent by Railway. The Chief Electrical Engineer<br />

will appoint an arbitrator out of this panel as the<br />

contractor’s nominee and then appoint a second<br />

arbitrator of equal status as the Railway nominee either<br />

from the panel or from outside the panel ensuring that<br />

one of the two arbitrators shall nominee an umpire to<br />

whom case will be referred in the event of any<br />

difference between the two arbitrators.<br />

iii) The arbitrator or arbitrators of the umpire shall have<br />

power to call for such evidence by affidavit or<br />

otherwise as the arbitrator umpire shall thank and it<br />

shall be duty of the parties hereto to do cause to be<br />

done all such things as may be necessary to enable the<br />

arbitrator or arbitrators or umpire to make the award<br />

without any delay.<br />

iv)<br />

It will be no objection that the person appointed as<br />

Arbitrator/Arbitrators, umpire are Government servants<br />

and that in the course of their duties as government<br />

they have express views on all or any of the matters in<br />

dispute.<br />

v) Subject as aforesaid Arbitration Act, 1940 and the rules<br />

there under and any statutory modification thereof shall<br />

apply to Arbitration proceeding under this clause.<br />

20. INSPECTION AND TESTING:<br />

i) All materials will be subject to inspection and test by<br />

the purchaser or his representative at the<br />

manufacturer’s works before dispatch and no materials<br />

shall be dispatched from the manufacturer’s works until<br />

these are inspected and or approved. The materials may<br />

also be inspected by the purchaser or his representative<br />

again at the contractor’s depot/works site. The<br />

purchaser or his representative shall have the right to<br />

be present during all stages of manufacture and shall be<br />

13


afforded free of charge all reasonable facilities for<br />

inspection and testing so as to satisfy himself<br />

/themselves that the materials are in accordance with<br />

specifications, approved drawings and design. Any<br />

unreasonable delay in inspection will be reasonable<br />

ground for extension of time for completion of work.<br />

ii) No less than 15 days notice in writing shall be given by<br />

the contractor to the purchaser in order that the<br />

purchaser’s Engineer may present if they (i.e.<br />

purchaser) so desire for carrying out the inspection.<br />

21. INSPECTION AND PROVISIONAL ACCEPTANCE:<br />

The articles/quarters which are to be supplied and<br />

executed as per specification will be inspected by the<br />

Sr.Divl.Elect. Engineer(TR-D)/East Central Railway/Dhanbad or<br />

by his authorized representatives at every stage of payment<br />

of the tender. The Railway administration reserves the right<br />

for acceptance and rejection of the work, thus inspected<br />

without assigning any reason.<br />

22. DEVIATION FROM TENDER:<br />

Deviation from tender papers will not normally be agreed<br />

to should the tenderer be unable for good and sufficient<br />

reason to comply entirely with the tender papers. He shall<br />

indicate the deviations desired by him. Such deviation if any<br />

shall be kept down to the absolute minimum and the reasons<br />

for deviation shall be indicated. The Railway administration<br />

reserves the rights to cancel the tender, if any deviation is<br />

not acceptable to it and if the tenderer is unwilling to<br />

withdraw the deviation or modify the same in a manner<br />

acceptable to the Railway, the tenderer in all such cases<br />

shall indicate clearly the special condition or amendment<br />

desired by him to the relevant item of the tender papers.<br />

23. DEFAULT AND DELAY:<br />

The contractor shall execute the work with due diligence<br />

and expeditious keeping to the approved time schedule should<br />

be refuses or neglect to comply with any reasonable orders<br />

given to him in writing by the Sr.Divl.Elect.Engineer(TR-<br />

D)/East Central Railway/Dhanbad or any of his authorized<br />

representative in connection with the work or contrivance the<br />

provision of the contract or the progress of the work laps<br />

persistently behind the time schedule due to his negligence,<br />

the Railway administration shall be at liberty to give seven<br />

days notice in writing to the contractor requiring him to<br />

make good the neglect or contravention complained of and<br />

should the contractor fail to comply with the requisitions<br />

made in the notice within seven(7) days from the receipt<br />

thereof, it shall be lawful for the Railway administration to<br />

take the work wholly or in part out the contractor’s hand<br />

14


without any further reference and get the work or any part<br />

thereof as the case may be completed in any other rights or<br />

remedy of the Railway administration.<br />

24. LOSS SUSTAINED DUE TO DEFAULT AND DELAY:<br />

In the event of any loss to the Railway administration<br />

on account of execution and/ or completion of the work or any<br />

part thereof by the agencies other than the contractor in<br />

terms the above clause the contractor shall be liable to<br />

imburse the loss to the Railway administration and the<br />

reimbursement in full or in part as the case may be shall be<br />

met at the option of the Railway administration from out of<br />

all or any of the following courses:-<br />

(i) Any amount due and payable to the contractor by the<br />

Railway or any account whatsoever,<br />

(ii) the contractor’s security deposit in the hands of the<br />

Railway administration as far as available, and<br />

(iii)other assets whatsoever of the contractor.<br />

25. EXECUTION OF WORKS:<br />

The work should be carried out as per Electrical<br />

standard specification.<br />

26. VARIATION:<br />

a) For controlling payment in case the agreemental value<br />

goes beyond + 25% , a regulatory mechanism as part of<br />

the contract itself should be built in. For the first<br />

15% increase in the value beyond 25% of agreemental<br />

value, the rates will have a reduction of 2% in the<br />

incremental value of the agreement and for the next 10%<br />

increase in the value, rates will have an additional<br />

reduction of 2% in the further incremental value of the<br />

agreement.<br />

b).<br />

c).<br />

Execution of quantities beyond (+)50% of the overall<br />

agreemental value should not be permitted and, if found<br />

necessary, should be only through fresh tenders or by<br />

negotiating fresh rates with existing contractor as per<br />

procedure laid down by Railway Board in their letter no:<br />

94/CE/CT-1/37 dated 5-5-1995 for variation beyond 25%.<br />

To decide whether the agreemental value will go beyond<br />

50%, as and when 75% of the agreemental has been<br />

executed, the contract should be subjected to a detailed<br />

review and administrative decision by an appropriate<br />

authority ( agreement signing authority) should be<br />

recorded in writing and quantities monitored carefully<br />

and from this stage onwards, execution of further<br />

quantities will have to be monitored at least at the<br />

level of JAG Officers.<br />

27(a) The contractor shall comply with provisions of the<br />

contract labour (Regulation and abolition Act 1970 and<br />

the contract labour Regulation & abolition, Central<br />

Rules 1971), as modifies from time to time wherever<br />

15


(b)<br />

applicable and shall also indemnify the purchase from<br />

and against any claims under the aforesaid act and the<br />

rules.<br />

The contractor shall be responsible to ensure compliance<br />

with provision of 1961 and the rules and order issues<br />

there under from time to time in respect of apprentices<br />

directly or through petty contractors or sub contractors<br />

employed by him for the purpose of carrying out the<br />

contract.<br />

27.1 WORK TO BE DONE AS APPROVED:<br />

The tender shall be finalized in consultation with the<br />

purchaser and approved before commencement of the work and<br />

the contractor shall be held responsible for the execution of<br />

the work in full compliance with approved design and drawings<br />

and drawings modified at site by the purchaser’s Engineer<br />

shall be treated as approved. However, such modifications<br />

shall be incorporated in the design and drawings and<br />

resubmitted for formal approval.<br />

27.2 QUAlITY OF MATERIALS AND WORK DONE:<br />

All erection work carried out shall also be of the best<br />

quality acceptable to the Sr.Divl.Elect.Engineer(TR-D)/East<br />

Central Railway/Dhanbad who shall have the power to reject<br />

the material or order for removal of any work done in his<br />

opinion is faulty or insecure and the contractor shall<br />

replace the same to his satisfaction.<br />

27.3 CONTRACTOR ORGANISATION:<br />

(a) The contractor shall arrange all tools & plants and<br />

facilities necessary for erection, commissioning, and<br />

testing of the equipments in compliance with the<br />

specification at his own cost.<br />

(b)<br />

The contractor shall bring only materials, tools and<br />

plants and other accessories to the site of work which<br />

are to be used in the execution of the contract. The<br />

contractor may store such materials tools and plants etc<br />

at site of work where suitable covered and open space<br />

would be made available to him free of charge. All these<br />

expense connected with the storage and safe custody of<br />

the materials etc shall be incurred by the contractor.<br />

(c) On completion of the work, the contractor shall handover<br />

the site of work completely cleared of all temporary<br />

structure, stores of refuse unless other wise agreed<br />

to by the purchaser.<br />

(d) The contractor shall/will be responsible for transport of<br />

materials from source of supply to the site or work and<br />

for all losses and /or damage in the transfer of<br />

materials and for demurrage or warfage he may incur and<br />

no loss or damage for expenses incurred on this account<br />

will be reimbursed by the purchaser.<br />

16


27.4 PART RECOVERY OF INCOME TAX:<br />

Income tax @ 2% of the gross amount and 15% surcharge on<br />

income tax will be recovered form all the bills of the<br />

contractor in terms of section 134(c) of the Income Tax<br />

Act, 1961 as introduced through the Finance Act 1972.<br />

JST @ 4% to be deducted as the work will be done in the<br />

area of Jharkhand state.<br />

Sr.Divl.Elect.Engineer(TR-D),<br />

East Central Railway,Dhanbad<br />

17


Annexure-I<br />

To<br />

The President of India,<br />

Acting through the Sr.Divl.Elect. Engineer(TR-D),<br />

East Central Railway,<br />

D H A N B A D<br />

Dear Sir,<br />

Reg.: Tender No. TRD/OT/04/05-06/Vehicle dt.24.08.2005.<br />

I I/We…………………………………………………………………………………………...<br />

have read the conditions of the tender attached hereto and agreed<br />

to abide by such conditions. I/We also agree to abide by this<br />

tender for a period of 90 days from the date fixed for opening the<br />

same and in default of my/our so doing will make me/us liable for<br />

forfeiture of my/our security deposit for a period of 90 days.<br />

I/We offer to do the work for ………………………………………………………………...<br />

………………………………………………………………………………………………………...<br />

in Dhanbad division as the rates quoted in the attached schedule<br />

and hereby bind by self/ourselves to complete the works in all<br />

respect in …………………………. days from the date of execution of<br />

agreement.<br />

1. I/We further agree to sign an agreement bond to abide by the<br />

General Conditions of Contract and the Special Conditions<br />

attached herewith and to carry out all works according to the<br />

East Central Railway, Electrical Department standard<br />

specification No. 10TD any other specification mentioned in<br />

the tender.<br />

2. A sum of Rs. ………………………………………………………………………………….<br />

herewith forwarded as Earnest Money in addition to the sum of<br />

Rs. ………………………………. .security deposit mentioned above. The full<br />

value of the earnest money shall stand forfeited without<br />

prejudice to any other rights of remedies.<br />

a) I/We do not execute the contract documents within seven<br />

days from receipt of notice issued by the Railway such<br />

documents are ready.<br />

b) I/We do not commence the work within tend days also<br />

receive of order to the effect.<br />

3. I/We have already made a lump sum Rs. …………………………………………..<br />

towards Earnest Money by receipt No. …………………………………………………..<br />

date…………2005 and as such no further deposit is made and I/We<br />

further agree to declare that in case I/We fail to abide by<br />

the condition of keep open this order for a period of 90<br />

days. I/We shall have no objection to the forfeiture of<br />

“Security Deposit” portion of the Earnest Money the<br />

amounting to Rs. ………………………………………………. and the said amount<br />

realized by the President of India also from my said lump sum<br />

deposit Rs………………………………………<br />

18


I/We have deposited with the Divl. Cashier, East Central<br />

Railway, Dhanbad, Chief Cashier, East Central Railway, Hajipur,<br />

the required earnest money of Rs. ……………………………. only for which<br />

Receipt No. ……………………………………………….. dt. ……………………. has been granted<br />

which is enclosed.<br />

OR<br />

I/We enclosed the requisite earnest money in form of …………………<br />

……………………………….for Rs…………………………………………………… only in respect of this<br />

tender.<br />

I/We have no retired Engineer or gazetted officer of the<br />

Electrical department any of the Railway and none of the my/our<br />

relatives are working in the Railway at present.<br />

Yours faithfully,<br />

Signature of the Tenderer(s)<br />

with seal and date<br />

WITNESS:-<br />

19


ANNEXURE - II<br />

Please fill in the questionnaires below:-<br />

The following documents should be specified for submission along<br />

with tender.<br />

a) List of personnel organization available on :<br />

hand and proposed to be engaged for the<br />

subject work.<br />

b) List of Plant & Machinery available on :<br />

hand (own) and proposed to be inducted<br />

(own and hired to be given separately) for<br />

the subject work.<br />

c) List of Works completed in the last three :<br />

financial years giving description of work,<br />

organization for whom executed, approximate<br />

value of contract at the time of award, date<br />

of award and date of scheduled completion<br />

of work. Date of actual start, actual completion<br />

and final value of contract should also be<br />

given.<br />

d) List of works on hand indicating description :<br />

of work, Contract value, approximate value<br />

of balance work yet to be done and date of<br />

award.<br />

NOTE:<br />

1. In case of items (c) and (d) above, supportive<br />

documents/certificates from the organizations with whom they<br />

worked/are working should be enclosed.<br />

2. Certificates from private individuals for whom such works are<br />

executed/being executed should not be enclosed.<br />

20


AGREEMENT<br />

Form-1<br />

AN AGREEMENT made this …………………………………. day on two<br />

thousand………… between ………………………………………………herein (after referred<br />

to as “the contractor”) of the one part and the President of<br />

India, acting in the premises through the Sr.Divisional<br />

Electrical Engineer(TR-D)/East Central Railway/Dhanbad<br />

(hereafter referred to as the Purchaser) of the other part.<br />

Whereas in response to a call for tender for<br />

………………………………………. ………………………………………………………………………………………………... as<br />

per tender paper No. ……………………………………………………………. at<br />

Annexure –‘A’ hereto the contractor has submitted a tender<br />

as per Annexure-‘B’ hereto and whereas the said tender of the<br />

contractor has been accepted for …………….. ……………………………………..as<br />

per copy of letter of acceptance of Tender<br />

No………………………………………………………dated………………………………. completed with<br />

enclosures at the accepted rates and agreed deviations from<br />

the said tender papers as per Annexure-“C”. Rs………………………………<br />

(Rupees …………………………………………………………………………………………..only).<br />

Now this agreement with witnesses that in consideration<br />

of the premises and the payment to be made by the Purchaser<br />

to the Contractor provided for herein below the Contractor<br />

shall supply all equipments and materials and execute and<br />

perform all works for which the said tender of the Contractor<br />

has been accepted strictly according to various provision in<br />

Annexure-“A & C” hereto and upon such supply, execution and<br />

performance to the satisfaction of the Purchaser, the<br />

Purchaser shall pay to the contractor at the several rates<br />

accepted as per the said Annexure-“C “ and in terms of the<br />

provisions therein.<br />

In witness whereof the parties have hereinto set and<br />

subscribed their respective hands and/or scale the day and<br />

year respectively mentioned against their respective<br />

signatures.<br />

Signed and delivered at …………………by Shri<br />

………………………………...for and on behalf of M/s. ……………………<br />

…………………………….the Contractor within named in the presence of :-<br />

1. Signature : ……………………………………………………..<br />

Date : ……………………………………………………..<br />

Name in Block Letters : …………………………………………………….<br />

Address : ……………………………………………………..<br />

2. Signature : ……………………………………………………<br />

Date : ……………………………………………………<br />

Name in Block Letters : ……………………………………………………<br />

Address : ……………………………………………………<br />

21


Signed and derived at ………………………. for an on behalf of the<br />

President of India by Shri ……………………… …………….East Central<br />

Railway, Dhanbad in the presence of :<br />

1. Signature : ………………………………………………………...<br />

Name in Block Letters : ………………………………………………………...<br />

2. Signature : ………………………………………………………...<br />

Name in Block Letters : ………………………………………………………...<br />

Annexure – “A” : Tender Papers No. ……………………………………………………….<br />

Annexure – “B” : Firm’s Tender No. ………………………………………………………<br />

Annexure– “C” : Letter of acceptance of Tender …………………………<br />

Dated …………………………complete with enclosure.<br />

22


FORM-2<br />

STANDING INDEMITY BOND FOR “ON ACCOUNT” PAYMENTS.<br />

(On paper of requisite stamp value)<br />

We, M/s. …………………………………………………………….hereby undertakes that<br />

we hold at our stores depot/s at ……………………………………..for and on<br />

behalf of the President of India acting in the premises<br />

through the Sr.Divl.Elect.Engieer(TR-D)/East Central Railway,<br />

Dhanbad (herein after referred to as the purchaser) and his<br />

property in trust for him all imported and indigenous<br />

materials/works for which on account Payments have been<br />

made to us against the contractor for<br />

…………………………………………………………………………………………………………………………………………………………………<br />

……………….. vide letter of acceptance of tender No.:<br />

………………………………………………dated………………. and materials handed over to<br />

us by the purchaser for the purpose of execution of the said<br />

contact, until such time the materials/works are duly erected<br />

or otherwise handed over to him.<br />

We shall be entirely responsible for the safe custody<br />

and protection of the said materials against all rise till<br />

they are dully delivered as erected equipment to the<br />

purchaser or as he may direct otherwise and shall indemnify<br />

the purchaser against any loss, damaged or deterioration<br />

whatsoever in respect of the said materials while in our<br />

possession and against disposal of surplus materials. The<br />

said materials/works shall at all this be open for inspection<br />

by any officer authorized by the purchaser.<br />

Should any loss, damage or deterioration of<br />

materials/works occur or surplus materials disposed off and<br />

refund becomes due, the purchaser shall be entitled to<br />

recover forms us the full cost as per prices included in the<br />

contract and also compensation for such loss or damage, if<br />

any also with the amount to be refunded without prejudice to<br />

any other remedies available to him by deduction from any<br />

such due or any sum which at any time hereafter becomes due<br />

to us under the said or any other contract.<br />

Dated , the ………………………………. ……….day of …………………<br />

For and on behalf of<br />

M/s. …………………………………………..<br />

(Contractor)<br />

Signature of witness:-<br />

Name of witness ( in Block capital letters):………………………………………………………<br />

Address : ……………………………………………………………………………………..<br />

23


SCHEDULE OF RATES<br />

Name of Work : Repairing of Vehicle No.BR-14P-1508.<br />

Annexure- III/A<br />

Item Description Part No. Unit Quantity Rate Breakup of rate<br />

Total Amount<br />

No. of item<br />

Store Cash/ In Figure In words<br />

Labour<br />

1<br />

2 3 4 5 6 6A 6B 7 8<br />

1 Body shell O10AK0010N No 1<br />

CED<br />

2 Front door LH 0081277 No. 1<br />

9<br />

3 Front Door RH 0081278 No 1<br />

4 Rear Door LH 0080476 No 1<br />

5 Rear Door RH<br />

No 1<br />

008047<br />

6 Back Door Assly. 0088506 No. 1<br />

7<br />

Wheel Rim 0088273 No 4<br />

8 King Pin Bearing 0019401 No 4<br />

Knuckle Kit (908226 No 1<br />

10 Front Axle Bim 0057565 No 1<br />

11 Tie Rod End 0018277 No 1<br />

12 Windshield Glass 0081170 No 1<br />

13 Front Hub<br />

0019406 No 4<br />

Bearing<br />

14 Radiator<br />

No 1<br />

Assembly 0082511<br />

15 Piston Ring Set 9420001125 Set 1<br />

16 Valve Kit 9420000674 No 1<br />

24


Item Description<br />

Part No. Unit Quantity Rate Breakup of rate<br />

Total Amount<br />

No. of item<br />

Store Cash/ In Figure In words<br />

Labour<br />

1<br />

2 3 4 5 6 6A 6B 7 8<br />

17 Main Bearing 1St. 7902101900 No 1<br />

18 Big End Bearing 1 St .<br />

19<br />

20<br />

9420000480 No 1<br />

Valve Tappet 7910031879 No 8<br />

Gasket Set1St 79020003811M Set 1<br />

21 Main Bearing oil 00085768 No 2<br />

seal<br />

22 Thrust washer 7932566164 No 1<br />

23<br />

24<br />

Cooling Fan 791007436 No 1<br />

Heater Plug 7932567717 No 4<br />

25 Hub Oil Seal 0502CA0080N No 4<br />

26<br />

27<br />

28<br />

29<br />

Bonnet Assembly 0098829 No 1<br />

Clutch Plate 0085075 No 1<br />

Pressure Plate 0071509 No 1<br />

Release bearing 0088661 No 1<br />

30 Hub Bearing 00644366 No 1<br />

31<br />

32<br />

Clutch Fork 0630012 No 1<br />

Spring 0630017 No 1<br />

33 Kit Universal Joint 0906929 No 2<br />

34 Wheel cylinder kit 0055878 No 4<br />

25


35 Rear wheel cylinder 0032284 No 2<br />

kit<br />

36 Front Brake shoe 0055873 No 1<br />

37 Rear Brake shoe 0092291 No 1<br />

38 Rear Bumper LH 0088412 No 1<br />

39 Rear Bumper RH 0088413 No 1<br />

40 Front feeder LH 00029803 No 1<br />

41 Front feeder RH 00298804 No 1<br />

42 Kit steering lock 0098433 No 1<br />

43 Indicator Lamp LH 0090860 No 1<br />

44 Indicator Lamp RH 0090861 No 1<br />

45 Side Marker Lamp 0065872 No 1<br />

46 Grease G001 Kg 1<br />

47 Engine Oil MAX56K Ltrs 8<br />

48 Oil Filter EK3807A No 1<br />

49 Diesel Filter 7902000096 No 2<br />

50 Head Light Assly 1701AA0170N No 2<br />

51 Rear indicator Lamp<br />

LH<br />

52 Rear Indicator Lamp<br />

RH<br />

17030A0030N No<br />

17030A0020N No<br />

1<br />

1<br />

26


Description Part No. Unit Quantity Rate Breakup of rate<br />

Total Amount<br />

of item<br />

Store Cash/ In Figure In words<br />

Labour<br />

1<br />

2 3 4 5 6 6A 6B 7 8<br />

53 Engine Mounting 9420000295 No 2<br />

54 Fuel Tank Assly 0078293<br />

No 1<br />

55<br />

56<br />

Valve Seat 7932560798 No 8<br />

Front Bumper 0098710 No 1<br />

1<br />

Body shell<br />

change<br />

No 1<br />

Labour Charge<br />

2<br />

3<br />

4<br />

Painting &<br />

Denting full<br />

vehicle<br />

No 1<br />

Engine<br />

No 1<br />

Overhauling<br />

F.I.Pump O/H No 1<br />

5<br />

General work<br />

like Hub<br />

greasing type of<br />

Elect/Mech.Job<br />

No 1<br />

Signature of Tenderer with Seal<br />

27


Annexure-III(B)<br />

Special Terms & Conditions<br />

1. Terms of payment:<br />

85% payment shall be made against each work order after<br />

deducting the necessary taxes as per para 27.10 and any<br />

amount due on account of penalty.<br />

2. The offer of those tenderer shall be considered who have<br />

their service center/garage with all facilities necessary for<br />

repair of a Mahindra & Mahindra make commander jeep.<br />

3. Shifting of vehicles from Dhanbad to their workshop/service<br />

center is to be done by the firm at their own arrangement.<br />

4. Items to be used in repairing of vehicles should be original<br />

of Mahindra & mahindra company. Tenderer will have to provide<br />

the documentary evidence of purchased all parts replaced from<br />

authorized M&M service center/dealer.<br />

5. Minor repairing , if required during repairing of the<br />

vehicle is to be done by firm itself.<br />

6. All released materials should be handed over to SSE/TRD/DHN.<br />

29


Annexure-IV<br />

EXPLANATORY<br />

NOTES<br />

1. For item No. (1) to (56) as enlisted in schedule of<br />

rates (Annexure-III/A), has to be replaced in course of<br />

repairing, with new and original spare parts of Mahindra<br />

& Mahindra make. The supporting documentary evidence<br />

should be produced to the purchaser in proof of<br />

genuineness and OEM spare parts before fitment in the<br />

vehicle.<br />

**********<br />