Schedule -‘B’<br />
No . Description Basic Cost. Rate in figure<br />
(% Above/Below)<br />
1. Overall percentage increase/decrease over<br />
the rates under Dhanbad Division <strong>of</strong><br />
Eastern Railway Engineering Department<br />
on Schedule <strong>of</strong> Labour and Material, 1987<br />
for items listed in Annexure -‘B’.<br />
Rs 1,28,296/-<br />
Rate in Words<br />
(% Above/Below)<br />
N O T E<br />
1. The items to be operated under this Schedule those listed in Annexure-B enclosed<br />
with the tender documents.<br />
2. Only one percentage increase/decrease is to be quoted.<br />
3. It will be the contractor’s responsibility to hand over vacant unoccupied possession <strong>of</strong> the completed<br />
work to Railway authorised representatives.<br />
4. All the matter shall be given at the top <strong>of</strong> each chapter in i) all the water to be used to works shall<br />
be <strong>of</strong> appropriate quality and shall be supplied by the contractor at site <strong>of</strong> requirement, Railway<br />
shall not supply the same, ii) The materials to be supplied by the Railway in concerning PWI’s<br />
store from where the contractors shall transport the same to site and return excess materials to the<br />
said store and without any separate payment for lead, loading, unloading etc. iii) Railway shall not<br />
supply any tools and equipments.<br />
5. The unit for items from No. 9 to 25 <strong>of</strong> chapter XXIV <strong>of</strong> the Schedule 1987 should be Track metre<br />
and not in metre.<br />