Sl. Description <strong>of</strong> work Qty. Rate in Figure Rate in Words unit<br />
No<br />
<strong>23</strong>. Manufacturing, supplying insulated rail Nil Nil Nil Per set.<br />
dolly as per approved drawing for its use<br />
during the work and handing over the same<br />
to the Railway after work in working<br />
condition.<br />
24. Supplying, fabrication & assembling <strong>of</strong><br />
various types <strong>of</strong> boards for speed restriction<br />
as detailed below as per drawing mentioned<br />
in Annexure- 8/4 para 807 & 808 IRPWM<br />
with <strong>01</strong>(One) mm M.S. sheet. The rate<br />
should be inclusive <strong>of</strong> cost <strong>of</strong> all incidental<br />
charges, cutting, bending, bolts & nuts, all<br />
tools and equipment. Two coat <strong>of</strong> approved<br />
paint on board, proper lettering as<br />
mentioned in Annexure – 8/4 para 807 &<br />
808 <strong>of</strong> IRPWM with fixing <strong>of</strong> seatch tape<br />
(illuminous) along both side <strong>of</strong> letter written<br />
on board ( the rate is only for boards without<br />
lighting fixing for lighting arrangement)<br />
a) Speed Board<br />
06Nos.<br />
Each<br />
b) T/P & T/G Boards<br />
c) Caution indicators.<br />
25. Pre & Post temping attention <strong>of</strong> Track for<br />
relaxing <strong>of</strong> Speed to normal by doing<br />
complete and pr<strong>of</strong>ile boxing <strong>of</strong> ballast as per<br />
LWR Manual.<br />
26. Unloading <strong>of</strong> 10RP/20RP rail from<br />
Mechanical rack during the traffic block in<br />
block section as well as station limit. All<br />
skilled and unskilled labour along with their<br />
tools and gas cutting arrangement will be<br />
provided by contractor during the work.<br />
Safety at work site will be the responsibility<br />
<strong>of</strong> contractor.<br />
27. Paring and Butting <strong>of</strong> 60Kg. Rail above 130<br />
Mtr. Up to 260 Mtrs. Long panel for<br />
preparation <strong>of</strong> rail changing.<br />
12Nos.<br />
06Nos.<br />
Each<br />
Each.<br />
Nil Nil Nil Per<br />
T/Mtr.<br />
Nil Nil Nil Per<br />
Metre.<br />
Nil Nil Nil Per<br />
T/Mtr.<br />
DEN(2)/DHN<br />
Signature <strong>of</strong> Tenders<br />
Date: