18 <strong>of</strong> 24<br />

Sl. Description <strong>of</strong> work Qty. Rate in Figure Rate in Words unit<br />

No<br />

<strong>23</strong>. Manufacturing, supplying insulated rail Nil Nil Nil Per set.<br />

dolly as per approved drawing for its use<br />

during the work and handing over the same<br />

to the Railway after work in working<br />

condition.<br />

24. Supplying, fabrication & assembling <strong>of</strong><br />

various types <strong>of</strong> boards for speed restriction<br />

as detailed below as per drawing mentioned<br />

in Annexure- 8/4 para 807 & 808 IRPWM<br />

with <strong>01</strong>(One) mm M.S. sheet. The rate<br />

should be inclusive <strong>of</strong> cost <strong>of</strong> all incidental<br />

charges, cutting, bending, bolts & nuts, all<br />

tools and equipment. Two coat <strong>of</strong> approved<br />

paint on board, proper lettering as<br />

mentioned in Annexure – 8/4 para 807 &<br />

808 <strong>of</strong> IRPWM with fixing <strong>of</strong> seatch tape<br />

(illuminous) along both side <strong>of</strong> letter written<br />

on board ( the rate is only for boards without<br />

lighting fixing for lighting arrangement)<br />

a) Speed Board<br />

06Nos.<br />

Each<br />

b) T/P & T/G Boards<br />

c) Caution indicators.<br />

25. Pre & Post temping attention <strong>of</strong> Track for<br />

relaxing <strong>of</strong> Speed to normal by doing<br />

complete and pr<strong>of</strong>ile boxing <strong>of</strong> ballast as per<br />

LWR Manual.<br />

26. Unloading <strong>of</strong> 10RP/20RP rail from<br />

Mechanical rack during the traffic block in<br />

block section as well as station limit. All<br />

skilled and unskilled labour along with their<br />

tools and gas cutting arrangement will be<br />

provided by contractor during the work.<br />

Safety at work site will be the responsibility<br />

<strong>of</strong> contractor.<br />

27. Paring and Butting <strong>of</strong> 60Kg. Rail above 130<br />

Mtr. Up to 260 Mtrs. Long panel for<br />

preparation <strong>of</strong> rail changing.<br />

12Nos.<br />

06Nos.<br />

Each<br />

Each.<br />

Nil Nil Nil Per<br />

T/Mtr.<br />

Nil Nil Nil Per<br />

Metre.<br />

Nil Nil Nil Per<br />

T/Mtr.<br />

DEN(2)/DHN<br />

Signature <strong>of</strong> Tenders<br />

Date: