Page-01 of 23 - Indian Railways
Page-01 of 23 - Indian Railways
Page-01 of 23 - Indian Railways
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
12 <strong>of</strong> 24<br />
TENDER FORM<br />
Schedule <strong>of</strong> Rates.<br />
(Rates to be quoted by the tenderer/s)<br />
Name <strong>of</strong> work : TSR (P) work by PQRS including work at BRWD base and<br />
at site between KCKI and DTO ( Total 8.15 Kms.) in the<br />
jurisdiction <strong>of</strong> SE(P.Way)/Daltonganj under Asstt. Divisional<br />
Engineer,E.C.Railway, Daltonganj.<br />
Date <strong>of</strong> completion: The works are to be completed in all respects within 05 (Five)<br />
months from the date <strong>of</strong> acceptance <strong>of</strong> the tender.<br />
Schedule - ‘A’<br />
Work at base Depot and site.<br />
Sl. Description <strong>of</strong> work Qty. Rate in Figure Rate in Words unit<br />
No.<br />
1. Unloading/Leading <strong>of</strong> PRC sleeper<br />
from Rly. DMT/BFR(s) with<br />
contractors own gantry machinery tools<br />
plants.<br />
2. Fabrication <strong>of</strong> panels (with contractors<br />
portals)<br />
a) Spreading <strong>of</strong> PRC sleeper<br />
13529<br />
Sleeper<br />
13529<br />
Sleeper<br />
Per<br />
Sleeper<br />
Per<br />
Sleeper<br />
b) Supply <strong>of</strong> approved quality <strong>of</strong><br />
glue and applying on GR pad for<br />
its entire area at each rail seat and<br />
on PSC sleepers.<br />
c) Linking <strong>of</strong> PRC sleepers with<br />
90R/52Kg. service rails by<br />
providing elastic fastenings This<br />
will including fixing <strong>of</strong> rubber pad<br />
over concrete sleeper, liners,<br />
Supplying & greasing <strong>of</strong> P.clips,<br />
insert and handling & leading <strong>of</strong><br />
rails.<br />
3. Loading <strong>of</strong> Fabricated PRC panels into<br />
Rly. Wagon/BFR(s) with contractors<br />
own gantry machine, tools & plants.<br />
4. Unloading <strong>of</strong> Released track panels<br />
from Rly DMT with contractors own<br />
gantry machine, tools & plants.<br />
13529<br />
Sleeper<br />
8150<br />
T/Mtrs.<br />
8150<br />
T/Mtrs<br />
8150<br />
T/Mtrs<br />
Per<br />
Sleeper<br />
T/Mtr.<br />
T/Mtr.<br />
T/Mtr.<br />
DEN(2)/DHN<br />
Signature <strong>of</strong> Tenders<br />
Date: