20.01.2014 Views

No.3 March 2010 - Intercity Railway Society

No.3 March 2010 - Intercity Railway Society

No.3 March 2010 - Intercity Railway Society

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NR 156484 passing the southbound shuttle<br />

with 47501 leading between Maryport and<br />

Flimby where there are ample places for<br />

photography from the ‘beach’<br />

10 February <strong>2010</strong><br />

the northbound shuttle arriving at Flimby<br />

behind 57012<br />

note Voridian chemical works & wind turbines<br />

behind at Siddick north of Workington<br />

10 February <strong>2010</strong><br />

Workington North sign, 10 February <strong>2010</strong> Workington North banner, 10 February <strong>2010</strong><br />

It is likely the shuttle will continue until the summer at least, by which time most DRS Cl.47s & 57s will<br />

have appeared on it.<br />

Gretna Green:<br />

Following on from my previous report (Aug 2008) of track doubling at Gretna Green, a new footbridge,<br />

not needed before, has been constructed to link the existing north side access / car park with the new<br />

south side platform. As space allowed, it incorporates step free access in the form of long ramps…very<br />

long. The structure totally dominates the station as can be seen below. In fact for a simple station, it’s a<br />

bit of a maze when leaving the platform as I found, (see right hand photo) as exit, steps and ramp all<br />

have their own gap in the fence !<br />

looking west, 10 February <strong>2010</strong> looking east, 10 February <strong>2010</strong><br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!