20.01.2014 Views

No.3 March 2010 - Intercity Railway Society

No.3 March 2010 - Intercity Railway Society

No.3 March 2010 - Intercity Railway Society

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The Rise & Fall of 66048 - update<br />

by Trevor Roots<br />

66048 and the remaining wagons were finally moved overnight on the 13 th / 14 th February from where<br />

they had lain for 6 weeks. A 200 yd long compound was created between the railway line and the A9,<br />

where only light scrub needed to be removed. Access was via the lane passing under both to the north<br />

of the station (just beyond the platform ends), off which the station access also lead. A further access<br />

was constructed off the A9 at the south end of the compound, using steel sheets. This facilitated<br />

movement of large vehicles without needing to traverse narrow roads through Carrbridge. A heavy lifting<br />

crane was constructed opposite the loco at the north end of the compound. Only a few trees needed to<br />

be felled between 66048 and the station to allow a straight lift. The wagons and loco were then<br />

deposited in the compound from where the wagons have been moved south by road. The last box can<br />

be seen in the photo below to the right of the loco, which is completely shrouded in tarpaulins.<br />

The trackwork has been reinstated and work was underway to tidy up the crash site. The platforms had<br />

yet to be repaired. As far as I am aware, 66048 is still there as it couldn’t be moved south by road and<br />

was going to move north to Inverness, then south by rail on replacement bogies. The scene below as I<br />

write though is once again covered in deep snow with the A9 closed due to drifting.<br />

66048 in compound with remaining box behind<br />

Carrbridge 14 February <strong>2010</strong><br />

access off A9<br />

Carrbridge 14 February <strong>2010</strong><br />

crane at north end of compound on west of line<br />

note fresh ballast in reinstated loop<br />

Carrbridge 14 February <strong>2010</strong><br />

10<br />

66048s resting place showing more clearly<br />

how far it was below track level<br />

Carrbridge 14 February <strong>2010</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!