20.01.2014 Views

BMR HORSE RIDING WORK PLAN

BMR HORSE RIDING WORK PLAN

BMR HORSE RIDING WORK PLAN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>HORSE</strong> <strong>RIDING</strong> <strong>WORK</strong> <strong>PLAN</strong><br />

BLUE MOUNTAINS REGION<br />

APRIL 2013<br />

Background<br />

1. The trails listed in this plan reflect the priorities identified by members of the Horse Riding Consultative group that attend the<br />

Blue Mountains Regional Horse Riding workshop on Sunday 10 th February 2013 at the Blue Mountains Botanical Gardens, Mt<br />

Tomah.<br />

2. In addition to these authorised horse riding routes, all management trails in the Blue Mountains and Kanangra-Boyd National<br />

Parks will permit horse riding subject to the adoption of the DRAFT plan of management, with the exception of roads and trails<br />

in the Glenbrook precinct and the Woodford Oaks trail. Note also that horse riding is not allowed on management trails in the<br />

Sydney Catchment Authority Special Areas and in declared wilderness because current regulations and policies do not permit<br />

it.<br />

Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Improve access on existing<br />

authorised horse riding trails:<br />

Rileys Mountain Trail Blue<br />

Mountains<br />

National Park<br />

No<br />

Implement gate key<br />

borrowing system<br />

Year 1 – by March 2014<br />

Burrawang and Coreena Circuit Yellomundee<br />

RP<br />

No<br />

Implement gate key<br />

borrowing system<br />

Year 1 – by March 2014<br />

1


Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Improve horse riding opportunities<br />

on public access roads within NPWS<br />

Reserves<br />

Port Macquarie Road Capertee<br />

National Park<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Removal of cattle grid Years 2-3 – by March 2016<br />

<br />

Boyd Plateau Circuit (Ben Lomond<br />

(access from east side only), Boyd River<br />

Trail)<br />

Kanangra-<br />

Boyd National<br />

Park<br />

Requires<br />

Endorsement of<br />

Draft Plan of<br />

Management<br />

Years 2-3 – by March 2016<br />

Permit horse riding access to the<br />

following management trails:<br />

<br />

<br />

<br />

Bedford Creek Trail<br />

Andersons Trail<br />

Bowen Mountain West Trail<br />

Blue<br />

Mountains<br />

National Park<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

<br />

Burralow Trail<br />

<br />

Hillcrest Avenue Trail<br />

2


Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Permit horse riding access to the<br />

following management trails:<br />

Linden Ridge Trail* Blue<br />

Mountains<br />

National Park<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

*Requires<br />

approval from<br />

Sydney<br />

Catchment<br />

Authority<br />

<br />

<br />

<br />

<br />

<br />

T3 Trail<br />

Gospers Ridge (links with Wards Trail and<br />

Mailes Ridge Route)<br />

Powerline Trail<br />

Gees Arm North Trail<br />

Unnamed Trails between Blaxland Ridge<br />

Road/Putty Road and Wheeny Creek (Lot<br />

2, 11, 12, 14 access)<br />

Wollemi<br />

National Park<br />

Requires<br />

endorsement of<br />

South East<br />

Wollemi Horse<br />

Riding<br />

Management<br />

Plan<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

<br />

Boyd Plateau Circuit (Emperor Creek Trail<br />

& Box Creek Trail)<br />

Kanangra-<br />

Boyd National<br />

Park<br />

Requires<br />

Endorsement of<br />

Draft Plan of<br />

Management<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

Red Rock Trail Gardens of<br />

Stone National<br />

Park<br />

Requires<br />

amendment to<br />

existing Plan of<br />

Management<br />

Implement gate key<br />

borrowing system<br />

Not a priority<br />

3


Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Permit horse riding access to the<br />

following management trails:<br />

Canobla Gap Trail Wollemi<br />

National Park<br />

Requires<br />

Amendment to<br />

Existing Plan of<br />

Management<br />

Fitting of combination<br />

locks to existing gates<br />

Not a priority<br />

Allow horse riding access to the<br />

following dormant management<br />

trails:<br />

RAAF Trail Blue<br />

Mountains<br />

National Park<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Undertake environmental<br />

assessment<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

<br />

<br />

<br />

<br />

Cabbage Tree Trail<br />

Cora Creek Trail<br />

Ferrari Trail<br />

Long Ridge Trail<br />

Wollemi<br />

National Park<br />

Requires<br />

endorsement of<br />

South East<br />

Wollemi Horse<br />

Riding<br />

Management<br />

Plan<br />

Undertake environmental<br />

assessment<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

Gospers Lookout Trail Wollemi<br />

National Park<br />

Requires<br />

endorsement of<br />

South East<br />

Wollemi Horse<br />

Riding<br />

Management<br />

Plan<br />

Undertake environmental<br />

assessment<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

4


Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Allow horse riding access to the<br />

following dormant management<br />

trails:<br />

<br />

Boyd Plateau Circuit (Mount Emperor<br />

Trail)<br />

Kanangra-<br />

Boyd National<br />

Park<br />

Requires<br />

Endorsement of<br />

Draft Plan of<br />

Management<br />

Undertake environmental<br />

assessment<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

Jenolan River Trail Jenolan Karst<br />

Conservation<br />

Reserve<br />

Require<br />

amendment and<br />

endorsement of<br />

Draft Plan of<br />

Management and<br />

Undertake environmental<br />

assessment<br />

Implement gate key<br />

borrowing system<br />

Not a priority<br />

Allow horse riding access to the<br />

following bridle trails:<br />

Tabaraga Ridge to Burralow Creek Blue<br />

Mountains<br />

National Park<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Undertake environmental<br />

assessment<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

<br />

<br />

<br />

Lookdown Trail<br />

River Trail<br />

Blackboy Gully Trail<br />

Blue<br />

Mountains<br />

National Park<br />

(Mt Rileys<br />

Precinct)<br />

Requires<br />

endorsement of<br />

DRAFT Plan of<br />

Management<br />

Undertake environmental<br />

assessment<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

5


Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Allow horse riding access to the<br />

following bridle trails:<br />

Burrawang and Coreena circuit Yellomundee<br />

RP<br />

No<br />

Undertake environmental<br />

assessment<br />

Year 1 – by March 2014<br />

Seek partnership with<br />

horse riding groups to<br />

conduct track<br />

stabilisation works<br />

Implement gate key<br />

borrowing system<br />

<br />

<br />

<br />

Livingstone Track (Off Ruins Trail)<br />

Prickle track<br />

Wards Track<br />

Wollemi NP<br />

Requires<br />

endorsement of<br />

South East<br />

Wollemi Horse<br />

Riding<br />

Management<br />

Plan<br />

Undertake environmental<br />

assessment<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

Create “shared use” trails between<br />

horse riders and walkers:<br />

<br />

Mailes Ridge Route (no exit to Colo<br />

Meroo)<br />

Wollemi<br />

National Park<br />

Requires<br />

endorsement of<br />

South East<br />

Wollemi Horse<br />

Riding<br />

Management<br />

Plan<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

6


Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Create “shared use” trails between<br />

horse riders and walkers:<br />

<br />

<br />

The Rock Lookout Trail<br />

Rileys Lookout Loop Trail<br />

Blue<br />

Mountains<br />

National Park<br />

(Rileys Mt<br />

Precinct)<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

Further investigate horse riding<br />

opportunity through the<br />

establishment of new bridle trails<br />

which link with existing trails:<br />

Waterboard Trail extension Blue<br />

Mountains<br />

National Park<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Undertake environmental<br />

assessment<br />

Years 2-3 – by March 2016<br />

Jenolan River Trail extension Jenolan Karst<br />

Conservation<br />

Reserve<br />

Requires<br />

amendment and<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Undertake environmental<br />

assessment<br />

Not a priority<br />

7


Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Further investigate horse riding<br />

opportunity through the<br />

establishment of new bridle trails<br />

which link with existing trails:<br />

<br />

<br />

<br />

<br />

<br />

Cabbage Tree 18a extension<br />

Cabbage Tree 18b extension (Link Long<br />

Ridge Trail & Cabbage Tree Trail)<br />

Tootie Creek Trail extension<br />

Powerline Trail extension<br />

Ferrari Trail extension<br />

Wollemi<br />

National Park<br />

Requires<br />

endorsement of<br />

South East<br />

Wollemi Horse<br />

Riding<br />

Management<br />

Plan<br />

Undertake environmental<br />

assessment<br />

Years 2-3 – by March 2016<br />

<br />

Livingstone’s Track and Convict Track link<br />

<br />

Ironbark Ridge trail extension<br />

<br />

Prickle Track extension to Lyrebird<br />

Camping Area<br />

<br />

Gees Arm Nth to Gees Arm Sth link<br />

<br />

Gees Arm North Trail extension<br />

8


Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Provide horse riding infrastructure<br />

to improve accessibility and<br />

convenience<br />

Foster partnerships with horse riding groups to<br />

design horse friendly access structures<br />

In partnership with horse riding groups install<br />

horse riding infrastructure and undertake track<br />

restoration/construction works at priority sites<br />

Where warranted, improve community<br />

understanding of shared use trails through<br />

information signage<br />

All reserves No Ongoing<br />

All reserves No When funding becomes<br />

available<br />

All reserve No Ongoing<br />

Where warranted, install exclusion fencing either<br />

side of access gates to prevent unauthorised uses<br />

All reserves No Undertake environmental<br />

assessments<br />

When funding becomes<br />

available<br />

© State of New South Wales and the Office of Environment and Heritage<br />

Published by:<br />

Office of Environment and Heritage<br />

59–61 Goulburn Street, Sydney South 1232<br />

Ph: 1300 361 967<br />

TTY: (02) 9211 4723<br />

Email: info@environment.nsw.gov.au; Web: www.environment.nsw.gov.au<br />

Report pollution and environmental incidents: Environment Line: 131 555 (NSW only)<br />

OEH 2013/0404; June 2013<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!