B2 – 2 Notes on safety and procedure Notes on procedure r r Check all electrical connections and tubing lines prior to commissioning the system. Do not pour contaminated fluids into the container. This may clog the proportional valve and result in damage of the pump seals. Process Control System • Festo Didactic
Overview B3 – 1 B.3 – Overview The Process Control System may be used in initial vocational training, further training and retraining. The concept of the Process Control System is designed for professions such as process control electronics engineers, suppliers, process and waste disposal engineers. With the stations of the Process Control System, the processes of filling level, temperature and flow control can be tested. The system consists of individual modules which can be combined in various ways. Various degrees of expansion are possible in that stations and systems can be separately constructed and converted, piped up and commissioned. As such, they are open to your own ideas, approach to problem solving and project work. Only components generally employed in industry are used in order to ensure a realistic training environment. This training concept is the ideal solution for process technology-related training compared to simulated systems and large industrial systems, which are confined to a particular area. The following training contents can be taught by means of the Process Control System: • Measuring of non-electrical, process technology and control technology variables • Extension of measuring chains into closed control loops • Assembly, interconnection and commissioning of systems • Expansion, modification, commissioning, inspection, maintenance and upkeep of process control equipment and error diagnosis in the event of malfunction Festo Didactic • Process Control System
- Page 43 and 44: Fließbilder A10 - 5 A.10.5 - RI -
- Page 45 and 46: EMSR Stellenpläne A11 - 1 A.11 - E
- Page 47 and 48: EMSR Stellenpläne A11 - 3 A11.3 -
- Page 49 and 50: Stücklisten A12 - 1 A.12 - Stückl
- Page 51 and 52: Stücklisten A12 - 3 A.12.3 - Stüc
- Page 53 and 54: Stücklisten A12 - 5 Festo Didactic
- Page 55 and 56: Datenblätter A13 - 1 A.13 - Datenb
- Page 57 and 58: Regler 170696 1/2 Aufbau Der Regler
- Page 59 and 60: Motorregler 170698 1/1 Aufbau Der M
- Page 61 and 62: Analog-Terminal 170699 1/1 10VDC 24
- Page 63 and 64: Verrohrung 170701, 170702, 170703 1
- Page 65 and 66: Behälter 170707 1/1 Aufbau Der Beh
- Page 67 and 68: Temperatursensor 170709 1/1 Aufbau
- Page 69 and 70: Analoger Ultraschallsensor 170710 1
- Page 71 and 72: Durchflusssensor 170711 1/2 Aufbau
- Page 73 and 74: Pumpe 170712 1/2 Aufbau Die Pumpe i
- Page 75 and 76: Heizung 170713 1/1 Aufbau Die Heizu
- Page 77 and 78: Proportionalventil 170714 1/2 Aufba
- Page 79 and 80: 2/2-Wege-Magnetventil 170715 1/1 Au
- Page 81 and 82: Kugelhahn 170716 1/1 Aufbau Der Kug
- Page 83 and 84: Kapazitiver Näherungsschalter 2581
- Page 85 and 86: Festo Didactic • Process Control
- Page 87 and 88: Learning system for automation and
- Page 89 and 90: Table of contents B - III Table of
- Page 91 and 92: Introduction B1 - 1 B.1 - Introduct
- Page 93: Notes on safety and procedure B2 -
- Page 97 and 98: Overview B3 - 3 Sample configuratio
- Page 99 and 100: Overview B3 - 5 Sample construction
- Page 101 and 102: Overview B3 - 7 All configurations
- Page 103 and 104: Mechanical assembly B4 - 1 B.4 - Me
- Page 105 and 106: Mechanical assembly B4 - 3 B.4.2 -
- Page 107 and 108: Mechanical assembly B4 - 5 • Fill
- Page 109 and 110: Control elements B5 - 1 B.5 - Contr
- Page 111 and 112: Description of controlled systems B
- Page 113 and 114: Description of controlled systems B
- Page 115 and 116: Description of controlled systems B
- Page 117 and 118: Commissioning B7 - 1 B.7 - Commissi
- Page 119 and 120: Commissioning B7 - 3 r Use pump P t
- Page 121 and 122: Networking with Profibus B8 - 1 B.8
- Page 123 and 124: Standards and directives B9 - 1 B.9
- Page 125 and 126: Flow diagrams B10 - 1 B.10 - Piping
- Page 127 and 128: Flow diagrams B10 - 3 B.10.3 - PI -
- Page 129 and 130: Flow diagrams B10 - 5 B.10.5 - PI -
- Page 131 and 132: EMCS block diagrams B11 - 1 B.11 -
- Page 133 and 134: EMCS block diagrams B11 - 3 B.11.3
- Page 135 and 136: Parts lists B12 - 1 B.12 - Parts li
- Page 137 and 138: Parts lists B12 - 3 B.12.3 - Parts
- Page 139 and 140: Parts lists B12 - 5 Festo Didactic
- Page 141 and 142: Data sheets B13 - 1 B.13 - Data she
- Page 143 and 144: Controller 170696 1/2 Design The co
B2 – 2<br />
Notes on safety and procedure<br />
Notes on procedure<br />
r<br />
r<br />
Check all electrical connections and tubing lines prior to<br />
commissioning the system.<br />
Do not pour contaminated fluids into the container. This may clog<br />
the proportional valve and result in damage of the pump seals.<br />