15.01.2014 Views

Process Control System

Process Control System

Process Control System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Mechanical assembly<br />

B4 – 5<br />

• Filling level monitoring<br />

Filling monitoring can be achieved by means of capacitive proximity<br />

sensors.<br />

The proximity sensors are attached to a profile bar by means of a<br />

mounting bracket. The proximity sensors can be infinitely adjusted in<br />

height.<br />

The output signal is conducted to the controller via the binary input.<br />

0 V 24 V Out Alarm Out B1 Pt100 IN Bin<br />

+<br />

S<br />

-<br />

1<br />

2<br />

3<br />

+<br />

-<br />

1<br />

2<br />

-<br />

+<br />

+<br />

+<br />

+<br />

-<br />

-<br />

-<br />

-<br />

Analog Terminal<br />

BN<br />

BK<br />

BU<br />

BU<br />

BK<br />

BN<br />

BK<br />

BU<br />

H2<br />

B<br />

Pt100<br />

230V/115V<br />

PE<br />

L1<br />

N<br />

H1<br />

S2<br />

S1<br />

M<br />

P<br />

24VDC<br />

0VDC<br />

By means of configuring the controller in the menu 'Additions', 'In<br />

Bin', it is possible to trigger an alarm<br />

− if the filling level has not been attained (direction of control action<br />

'Inv: Yes')<br />

or<br />

− if the filling level is exceeded (direction of control action 'Inv =<br />

No')<br />

Festo Didactic • <strong>Process</strong> <strong>Control</strong> <strong>System</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!