Nuclear Decommissioning: Management of Costs and Risks<br />
____________________________________________________________________________________________<br />
Practice<br />
From <strong>the</strong> very outset external managers were hired who have long experiences in <strong>the</strong> project<br />
management of large and complex construction projects. With this step it was assured on <strong>the</strong><br />
management level that favourable conditions for adapting <strong>to</strong> <strong>the</strong> very different task of<br />
decommissioning were in place. The typical methodology of project management, <strong>the</strong> <strong>to</strong>ols and <strong>the</strong><br />
very different planning and work approaches, as compared with <strong>the</strong> operational phase (see Table 2<br />
on page 47) were thus introduced from <strong>the</strong> outset, providing a different general approach <strong>to</strong><br />
planning and execution. This contrasts with o<strong>the</strong>r approaches where <strong>the</strong> adaptation of <strong>the</strong><br />
organisation and its work approach is achieved after long periods of slow conversion.<br />
Project management uses a set of IT planning <strong>to</strong>ols and accounting methods, usually called a project<br />
information system (PMIS 9 ). Such a system provides up-<strong>to</strong>-date information on <strong>the</strong> status of all<br />
relevant decisions, properties, resources, etc..<br />
PMIS systems can be applied as an add-on, accompanying o<strong>the</strong>r systems, or as stand-alone systems<br />
that include all relevant aspects of a project. Figure 22 provides an overview of <strong>the</strong> issues and aspects<br />
in <strong>the</strong> PMIS at EWN.<br />
Figure 22: Elements of project management at EWN<br />
Source: (EWN 2013a)<br />
9<br />
'A project management information system (PMIS) is <strong>the</strong> coherent organization of <strong>the</strong> information<br />
required for an organization <strong>to</strong> execute projects successfully. A PMIS is typically one or more software<br />
applications and a methodical process for collecting and using project information. These electronic<br />
systems 'help [<strong>to</strong>] plan, execute, and close project management goals'. PMIS systems differ in scope, design<br />
and features depending upon an organisation's operational requirements.'<br />
From: http://en.wikipedia.org/wiki/Project_management_information_system<br />
83