Link to the study - European Parliament - Europa
Link to the study - European Parliament - Europa
Link to the study - European Parliament - Europa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Policy Department D: Budgetary Affairs<br />
____________________________________________________________________________________________<br />
waste aspects (in relation <strong>to</strong> graphite retrieval and treatment). The decommissioning strategy for <strong>the</strong><br />
gas cooled reac<strong>to</strong>rs is seen as more global so that <strong>the</strong> decommissioning projects are interconnected<br />
and linked closely <strong>to</strong> <strong>the</strong> graphite waste path (Laurent 2011).<br />
Figure 12 shows <strong>the</strong> planned time schedule within <strong>the</strong> overall decommissioning strategy for all<br />
reac<strong>to</strong>rs of EDF. Note that <strong>the</strong> time scale in <strong>the</strong> figure covers <strong>the</strong> years until 2036.<br />
As can be seen from <strong>the</strong> figure, <strong>the</strong> decommissioning of <strong>the</strong> graphite reac<strong>to</strong>rs is substantially delayed<br />
until 2020, with <strong>the</strong> graphite removal stage being <strong>the</strong> critical path.<br />
Figure 12: The time schedule for overall decommissioning of all reac<strong>to</strong>rs with relevant<br />
miles<strong>to</strong>nes<br />
Source: (Laurent 2011)<br />
3.2.2. Organisation structure for <strong>the</strong> decommissioning<br />
The organisation structure of EDF in respect <strong>to</strong> decommissioning is divided between two core areas:<br />
engineering services specialized in decommissioning and acting site decommissioning.<br />
Engineering services are provided by a special unit responsible for decommissioning within EDF – <strong>the</strong><br />
Engineering Centre for Dismantling and <strong>the</strong> Environment/'Centre d'ingénierie de la déconstruction et de<br />
l'environnement (CIDEN)' – which was established in 2001. It is a subdivision of <strong>the</strong> Engineering<br />
Division of EDF.<br />
Acting site decommissioning on <strong>the</strong> different sites is headed by <strong>the</strong> production division.<br />
Figure 13 shows <strong>the</strong> overall organisation structure of EDF and how CIDEN and <strong>the</strong> sites are located<br />
within this structure.<br />
56