Nuclear Decommissioning: Management of Costs and Risks<br />
____________________________________________________________________________________________<br />
Annual planning is intended for <strong>the</strong> upcoming year;<br />
Day-<strong>to</strong>-day production planning is intended for a month, week, day, shift.<br />
The adopted structure of <strong>the</strong> Megaproject:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
1 st level Projects programs;<br />
2 nd level Projects subprograms;<br />
3 rd level Projects;<br />
4 th level Project WBS;<br />
5 th level Project work packages;<br />
6 th level Separate works of <strong>the</strong> project work packages;<br />
7 th level Operations.<br />
The projects within <strong>the</strong> Megaproject are grouped according <strong>to</strong> <strong>the</strong> project programs:<br />
<br />
<br />
<br />
<br />
<br />
<br />
Р.0 – The Programme related <strong>to</strong> <strong>the</strong> organizing of <strong>the</strong> enterprise activity (general types of<br />
activity).<br />
Р.1-The Programme related <strong>to</strong> preparation for <strong>the</strong> decommissioning.<br />
Р.2 – The Programme related <strong>to</strong> dismantling/demolition of facilities and <strong>the</strong> site res<strong>to</strong>ration.<br />
Р.3 – The Programme related <strong>to</strong> handling of <strong>the</strong> spent nuclear fuel (hereafter referred <strong>to</strong> as<br />
SNF).<br />
Р.4 – The Programme related <strong>to</strong> <strong>the</strong> waste management (except for initial solid radioactive<br />
waste treatment).<br />
Р.5 – The Programme related <strong>to</strong> <strong>the</strong> post-operation.<br />
These programmes are divided in<strong>to</strong> sub-programs.<br />
The systematic analysis and schedule revision is performed taking in<strong>to</strong> account <strong>the</strong> current status of<br />
decommissioning and taken decisions for <strong>the</strong> future periods, considering provided financial<br />
resources.<br />
A more detailed planning level covers <strong>the</strong> upcoming three years. These schedules are updated every<br />
year for <strong>the</strong> next year. In this way <strong>the</strong> previous experiences are taken in<strong>to</strong> account within <strong>the</strong> planning<br />
for <strong>the</strong> next year. The most detailed planning level is updated weekly.<br />
The time planning is linked with all <strong>the</strong> programs within <strong>the</strong> whole decommissioning project.<br />
To control quality and assess performance a project structure for each part of <strong>the</strong> project will be<br />
developed. A project control <strong>to</strong>ol for this purpose is planned <strong>to</strong> be introduced in I/2014. The<br />
addressed levels of <strong>the</strong> structure planning work packages are:<br />
Project Management<br />
Preparation<br />
Implementation of works<br />
Project closure<br />
159