Policy Department D: Budgetary Affairs<br />
____________________________________________________________________________________________________________________<br />
Administrational aspects:<br />
Was it necessary <strong>to</strong> majorly<br />
change <strong>the</strong> internal<br />
administrational structure <strong>to</strong><br />
adapt it <strong>to</strong> <strong>the</strong> new task?<br />
Did you encounter frictions in<br />
that change process?<br />
Are major administrational<br />
changes ahead <strong>to</strong> improve <strong>the</strong><br />
structures?<br />
Yes, <strong>the</strong> administrative structure was changed <strong>to</strong> be adapted <strong>to</strong> <strong>the</strong> new tasks, <strong>to</strong> be implemented in <strong>the</strong> nuclear<br />
facility. A <strong>to</strong>tally new direc<strong>to</strong>rate – Decommissioning was established and <strong>the</strong> structure of <strong>the</strong> enterprise was<br />
changed respectively, as well as its Rules of procedure, internal rules of <strong>the</strong> specialized divisions, instructions,<br />
programs, methodologies etc.<br />
No difficulties met by now.<br />
No significant administrative changes are foreseen. In case it is necessary for <strong>the</strong> improvement of <strong>the</strong> work,<br />
administrative changes might be done.<br />
Technical aspects:<br />
Which safety status has <strong>the</strong><br />
facility reached? What has <strong>to</strong> be<br />
done technically <strong>to</strong> reduce safety<br />
risks fur<strong>the</strong>r?<br />
Which technical challenges were<br />
encountered so far in <strong>the</strong><br />
project? How did those influence<br />
costs and time frame?<br />
Have lessons been learned by<br />
technical challenges so far?<br />
After <strong>the</strong> removal of <strong>the</strong> spent fuel <strong>the</strong> facility is kept in a safe status for a long period of time. Radiological<br />
moni<strong>to</strong>ring and radiological survey of <strong>the</strong> contaminated structures and materials are implemented.<br />
Environmental moni<strong>to</strong>ring is implemented according <strong>to</strong> <strong>the</strong> regula<strong>to</strong>r’s requirements.<br />
To decrease <strong>the</strong> risk and <strong>to</strong> maintain <strong>the</strong> concept of defense in depth, it is necessary <strong>to</strong> carry out<br />
decontamination of first circuit, of <strong>the</strong> assembly s<strong>to</strong>rage pool and after that <strong>to</strong> drain <strong>the</strong>m.<br />
The challenges are entirely in <strong>the</strong> area of early planning and its contradiction with <strong>the</strong> subsequent phases of <strong>the</strong><br />
projects. The projects, as a whole, during <strong>the</strong>ir management from KNPP accumulated delays of several years. As<br />
of <strong>to</strong>day, during last 2012 year, <strong>the</strong> majority of <strong>the</strong> projects were transferred for management from Kozloduy<br />
PMU <strong>to</strong> International Projects Division of SERAW. SERAW, as decommissioning and RAW management opera<strong>to</strong>r<br />
is highly motivated <strong>to</strong> finalize and timely complete <strong>the</strong> decommissioning projects. Thus no delays in <strong>the</strong><br />
projects transferred are observed.<br />
It is a continuous process <strong>the</strong>re <strong>the</strong> technical challenges overcome help <strong>to</strong> increase <strong>the</strong> competence level of<br />
decision making and executive teams, involved in <strong>the</strong> decommissioning activities.<br />
154