Nuclear Decommissioning: Management of Costs and Risks<br />
____________________________________________________________________________________________<br />
(Continued)<br />
The personnel and competence management/responsibilities (personnel planning)<br />
How was <strong>the</strong> personnel made familiar with <strong>the</strong> new task of decommissioning (training,<br />
task communication, etc.)?<br />
Which continuous measures has been introduced and set up (training on <strong>the</strong> job,<br />
internal and external courses, etc.), which measures proved <strong>to</strong> be<br />
advantageous/disadvantageous?<br />
Has <strong>the</strong> personnel majorly adopted <strong>the</strong>ir changed tasks (acceptance of <strong>the</strong> new targets,<br />
job satisfaction, self-complacency, expert excellence)?<br />
Do you see or encounter difficulties between internal and external workforce (with<br />
consultants, with construction companies, on competencies, etc.)?<br />
Administrational aspects<br />
Was it necessary <strong>to</strong> majorly change <strong>the</strong> internal administrational structure <strong>to</strong> adapt it <strong>to</strong><br />
<strong>the</strong> new task?<br />
Did you encounter frictions in that change process?<br />
Are major administrational changes ahead <strong>to</strong> improve <strong>the</strong> structures?<br />
Technical aspects<br />
Which safety status has <strong>the</strong> facility reached? What has <strong>to</strong> be done technically <strong>to</strong> reduce<br />
safety risks fur<strong>the</strong>r?<br />
Which technical challenges were encountered so far in <strong>the</strong> project? How did those<br />
influence costs and time frame?<br />
Have lessons been learned by technical challenges so far?<br />
Which technical challenges do you see currently and in <strong>the</strong> near future? How are you<br />
preparing for those?<br />
Waste management aspects<br />
Waste management is a necessary prerequisite for a smooth decommissioning. Do you<br />
have enough means <strong>to</strong> s<strong>to</strong>re, treat and dispose <strong>the</strong> wastes from decommissioning<br />
internally or externally?<br />
Did missing waste management means delay or obstruct your technical or regula<strong>to</strong>ry<br />
timeframe?<br />
If you see current or future difficulties with your long-term waste management, what will<br />
be <strong>the</strong> measures you see as promising <strong>to</strong> answer <strong>to</strong> that expectations?<br />
(Continued)<br />