OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...
OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...
OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Inspection<br />
• Surface preparation prior to applying any floor coatings.<br />
• Completed flooring system application.<br />
Cleaning<br />
Keep areas clean of excess materials and rubbish during and after application. Remove all<br />
spatters from surrounding equipment and substrates, and leave area in neat and clean condition<br />
Finish Schedule<br />
Thin Film Pigmented Flooring System<br />
Cove Base Primer Tnemec Series 237 Power-Tread 6.0 to 8.0 mils<br />
Cove Base Tnemec Series 237 Power-Tread 1/8”minimum applied<br />
1st Coat Tnemec Series 237 Power-Tread 6.0 to 8.0 mils<br />
2nd Coat Tnemec Series 280 Tneme-Glaze* 8.0 to 10.0 mils<br />
3rd Coat Tnemec Series 280 Tneme-Glaze 8.0 to 10.0 mils<br />
* Broadcast sand into second coat at a rate of 2 lbs per 100 square feet if specified for a non-skid<br />
finish.<br />
7