14.01.2014 Views

OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...

OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...

OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Inspection<br />

• Surface preparation prior to applying any floor coatings.<br />

• Completed flooring system application.<br />

Cleaning<br />

Keep areas clean of excess materials and rubbish during and after application. Remove all<br />

spatters from surrounding equipment and substrates, and leave area in neat and clean condition<br />

Finish Schedule<br />

Thin Film Pigmented Flooring System<br />

Cove Base Primer Tnemec Series 237 Power-Tread 6.0 to 8.0 mils<br />

Cove Base Tnemec Series 237 Power-Tread 1/8”minimum applied<br />

1st Coat Tnemec Series 237 Power-Tread 6.0 to 8.0 mils<br />

2nd Coat Tnemec Series 280 Tneme-Glaze* 8.0 to 10.0 mils<br />

3rd Coat Tnemec Series 280 Tneme-Glaze 8.0 to 10.0 mils<br />

* Broadcast sand into second coat at a rate of 2 lbs per 100 square feet if specified for a non-skid<br />

finish.<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!