14.01.2014 Views

OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...

OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...

OFFICIAL BID SHEET BID NUMBER: 12-39 FIRM CONTRACT ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

film thicknesses and a list of five projects where each product has been used and rendered<br />

satisfactory service. No request for substitution shall be considered that would decrease film<br />

thickness or offer a change in the generic type of coating or flooring specified.<br />

Bidders desiring to use coatings and flooring other than those specified shall submit those with<br />

their proposal based on the specified materials, together with the information from above and<br />

indicate the sum which will be added to or deducted from the base bid should alternate materials<br />

be accepted.<br />

Products for each specified function and system shall be of a single manufacturer.<br />

Materials<br />

Tnemec Series 237 Power-Tread epoxy primer and basecoat.<br />

Tnemec Series 280 Tneme-Glaze epoxy intermediate coat.<br />

Material Preparation<br />

Mix materials according to manufacturer's latest printed instructions paying particular attention<br />

to mixing times and temperatures.<br />

Do not use materials beyond manufacturer's recommended pot life or shelf life.<br />

Pre-work Inspection<br />

Examine surfaces to be coated and report conditions that would adversely affect appearance or<br />

performance of systems and which cannot be put into an acceptable condition by preparatory<br />

work as specified.<br />

Surface Preparation<br />

Concrete/Tile Floors:<br />

Allow new concrete to cure for 28 days.<br />

Mechanically shotblast floor to remove all laitance, curing compounds, and surface<br />

contaminants, and to provide a uniform minimum surface profile of a CSP 3-5 as noted in ICRI<br />

Guideline 03732. Fill all bugholes and cracks with a recommended surfacer.<br />

After shotblasting, verify that all surfaces are clean, dry and free of any contaminants that could<br />

adversely affect the adhesion of the flooring system as detailed in SSPC-SP 13/NACE No. 6<br />

Application<br />

Materials shall be mixed and applied according to manufacturer's latest printed instructions.<br />

Apply a 4” rolled radius cove base at all walls for thin film system unless indicated otherwise on<br />

drawings.<br />

Allow flooring systems to cure fully in accordance with manufacturer's instructions prior to<br />

allowing traffic.<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!