The Antonine Wall Management Plan 2013-18 - Glasgow City Council
The Antonine Wall Management Plan 2013-18 - Glasgow City Council The Antonine Wall Management Plan 2013-18 - Glasgow City Council
appendix D AIM 6: INCREASE RESEARCH OPPORTUNITIES NATIONALLY AND INTERNATIONALLY AND USE THIS NEW RESEARCH TO UNDERPIN WORK TO PROTECT AND PROMOTE THE WORLD HERITAGE SITE SEA topics Biodiversity, flora and fauna will the management plan objective… Medium-term issues/ objectives • prevent damage and encourage favourable condition to designated sites and protected species and undesignated biodiversity, flora and fauna? • promote and enhance where appropriate enjoyment and understanding of the site from a natural heritage perspective? • contribute to effective adaptation to potential impacts of climate change on natural heritage? Material assets Cultural heritage Landscape and geodiversity • maintain or enhance (where appropriate) the tourism resource of the WHS and the wider area? • support national forestry policy? • protect and where appropriate enhance the historic environment? • promote positive effects for the historic environment through land management? • promote and enhance where appropriate enjoyment and understanding of the site from a cultural heritage perspective? • contribute to effective adaptation to potential impacts of climate change on cultural heritage? • protect and enhance the landscape and geodiversity value of the WHS? • promote positive effects for the landscape through land management? • contribute to effective adaptation to potential impacts of climate change on the landscape? • promote and enhance where appropriate enjoyment and understanding of the landscape value and geodiversity of the site? Summary and mitigation Issue: Developing a Research Strategy Objective 6. 1 A strategy for research on the Antonine Wall will be prepared. This will be taken forward in conjunction with all bodies undertaking research on the Antonine Wall in universities, museums, archaeological societies and commercial archaeological units. Objective 6.2 A programme for ongoing survey, fieldwork and analytical research will be developed, derived from the priorities identified in the Research Strategy Objective 6.3 Opportunities for international collaboration will be sought, to link wider Roman frontier studies and the ANTONINE WALL WHS These MP objectives will focus on the historic environment values of the site, and consequently there are no strong links with the biodiversity, flora and fauna objectives. However, there may be opportunity for research to increase understanding of the effects of climate change on these aspects of the site. These MP objectives will focus on the historic environment values of the site, and consequently there are no strong links with the material assets objectives. These objectives will contribute to understanding and enjoyment of the site. There is also potential for an increased understanding of the effects of climate change on the cultural heritage on the site, which would increase the positive effects. These MP objectives will focus on the historic environment values of the site, and consequently there are no strong links with the landscape and geodiversity objectives. However, there may be opportunity for research to increase understanding of the effects of climate change on these aspects of the site. With the exception of cultural heritage, which forms the focus of these objectives, the overall effect on wider environmental factors is expected to be neutral. However, there is an opportunity to increase positive effects though consideration of incorporation of research relating to climate change impacts. Recommendation: the research strategy objectives should consider the potential for increased understanding of climate change impacts on the site, in the context of both cultural and natural heritage. 72
Strategic Environmental Assessment: Environmental Report Issue: Disseminating information from Research Objective 6.5 Information provided publicly about the Antonine Wall will be accurate and to the highest standards Objective 6.6 Decisions about excavation and recording of sites on the Wall, and conservation and publications of finds should be informed both by appropriate legislative frameworks, and by the Antonine Wall Research Strategy These MP objectives will focus on the historic environment values of the site, and consequently there are no strong links with the biodiversity, flora and fauna objectives. Objective 6.7 Research discoveries, old and new, will be disseminated as widely as possible, and the results communicated in accessible, inclusive, informative and imaginative ways These MP objectives will focus on the historic environment values of the site, and consequently there are no strong links with the material assets objectives. These objectives will contribute to understanding and enjoyment of the site from a cultural heritage perspective. These MP objectives will focus on the historic environment values of the site, and consequently there are no strong links with the landscape and geodiversity objectives. With the exception of cultural heritage, which forms the focus of these objectives, the overall effect on wider environmental factors is expected to be neutral. 73
- Page 26 and 27: chapter nine 9.18 The Antonine Wall
- Page 28 and 29: chapter ten objectives will form th
- Page 30 and 31: chapter ten managing both cultural
- Page 32 and 33: chapter ten In East Dunbartonshire,
- Page 34 and 35: chapter ten English. Falkirk Counci
- Page 36 and 37: chapter ten future development of t
- Page 38 and 39: chapter ten Issue Impact of climate
- Page 40 and 41: APpendix a Statement of Outstanding
- Page 42 and 43: appendix b Jones R H. & Thiel A. (2
- Page 44 and 45: appendix c opportunity to contribut
- Page 46 and 47: appendix c • Signage and improved
- Page 48 and 49: APpendix D Strategic Environmental
- Page 50 and 51: appendix D 1.4 Assessment of the en
- Page 52 and 53: appendix D 2.3 The Strategic Enviro
- Page 54 and 55: appendix D 3.2 Environmental Baseli
- Page 56 and 57: appendix D Material Assets In We co
- Page 58 and 59: appendix D Table 4: Assessment Ques
- Page 60 and 61: appendix D nature. Matrix 4 in Anne
- Page 62 and 63: appendix D Matrix 2: Assessment of
- Page 64 and 65: appendix D Matrix 3: Assessment of
- Page 66 and 67: appendix D Issue: A conservation fr
- Page 68 and 69: appendix D AIM 2: PROMOTE AWARENESS
- Page 70 and 71: appendix D Issue: Marketing, Touris
- Page 72 and 73: appendix D Issue: Strengthening use
- Page 74 and 75: appendix D AIM 5: BALANCE WIDER ENV
- Page 78 and 79: appendix D Matrix 4: Assessment of
- Page 80 and 81: appendix D SEA Parameter Summary of
- Page 82 and 83: appendix D Designated Sites within
- Page 84 and 85: appendix D Figure 2: The Antonine W
- Page 86 and 87: appendix D The Antonine Wall runs t
- Page 88 and 89: appendix D The main bodies of water
- Page 90 and 91: appendix D Material Assets (Energy)
- Page 92 and 93: appendix D The canal is also import
- Page 94 and 95: APpendix E Respondent Information F
- Page 96 and 97: appendix E Q11 Do you agree with th
- Page 98 and 99: APpendix G GOVERNANCE MODEL FOR THE
- Page 100 and 101: appendix H German Limes (Obergerman
- Page 102 and 103: appendix H sets out a long-term str
appendix D<br />
AIM 6: INCREASE RESEARCH OPPORTUNITIES NATIONALLY AND INTERNATIONALLY AND USE THIS NEW RESEARCH TO UNDERPIN WORK TO PROTECT AND PROMOTE THE<br />
WORLD HERITAGE SITE<br />
SEA topics Biodiversity, flora and<br />
fauna<br />
will the management plan<br />
objective…<br />
Medium-term issues/<br />
objectives<br />
• prevent damage and<br />
encourage favourable<br />
condition to designated<br />
sites and protected<br />
species and undesignated<br />
biodiversity, flora and<br />
fauna?<br />
• promote and enhance<br />
where appropriate<br />
enjoyment and<br />
understanding of the site<br />
from a natural heritage<br />
perspective?<br />
• contribute to effective<br />
adaptation to potential<br />
impacts of climate change<br />
on natural heritage?<br />
Material assets Cultural heritage Landscape and<br />
geodiversity<br />
• maintain or enhance (where<br />
appropriate) the tourism<br />
resource of the WHS and<br />
the wider area?<br />
• support national forestry<br />
policy?<br />
• protect and where<br />
appropriate enhance the<br />
historic environment?<br />
• promote positive effects for<br />
the historic environment<br />
through land management?<br />
• promote and enhance<br />
where appropriate<br />
enjoyment and<br />
understanding of the site<br />
from a cultural heritage<br />
perspective?<br />
• contribute to effective<br />
adaptation to potential<br />
impacts of climate change<br />
on cultural heritage?<br />
• protect and enhance the<br />
landscape and geodiversity<br />
value of the WHS?<br />
• promote positive effects for<br />
the landscape through land<br />
management?<br />
• contribute to effective<br />
adaptation to potential<br />
impacts of climate change<br />
on the landscape?<br />
• promote and enhance<br />
where appropriate<br />
enjoyment and<br />
understanding of the<br />
landscape value and<br />
geodiversity of the site?<br />
Summary and mitigation<br />
Issue: Developing a Research Strategy<br />
Objective 6. 1<br />
A strategy for research on the<br />
<strong>Antonine</strong> <strong>Wall</strong> will be prepared. This<br />
will be taken forward in conjunction<br />
with all bodies undertaking research<br />
on the <strong>Antonine</strong> <strong>Wall</strong> in universities,<br />
museums, archaeological societies<br />
and commercial archaeological<br />
units.<br />
Objective 6.2<br />
A programme for ongoing survey,<br />
fieldwork and analytical research<br />
will be developed, derived from the<br />
priorities identified in the Research<br />
Strategy<br />
Objective 6.3<br />
Opportunities for international<br />
collaboration will be sought, to link<br />
wider Roman frontier studies and<br />
the ANTONINE WALL WHS<br />
<strong>The</strong>se MP objectives will<br />
focus on the historic<br />
environment values of the<br />
site, and consequently there<br />
are no strong links with the<br />
biodiversity, flora and fauna<br />
objectives. However, there may<br />
be opportunity for research to<br />
increase understanding of the<br />
effects of climate change on<br />
these aspects of the site.<br />
<strong>The</strong>se MP objectives will focus<br />
on the historic environment<br />
values of the site, and<br />
consequently there are no<br />
strong links with the material<br />
assets objectives.<br />
<strong>The</strong>se objectives will<br />
contribute to understanding<br />
and enjoyment of the site.<br />
<strong>The</strong>re is also potential for an<br />
increased understanding of<br />
the effects of climate change<br />
on the cultural heritage on the<br />
site, which would increase the<br />
positive effects.<br />
<strong>The</strong>se MP objectives will focus<br />
on the historic environment<br />
values of the site, and<br />
consequently there are no<br />
strong links with the landscape<br />
and geodiversity objectives.<br />
However, there may be<br />
opportunity for research to<br />
increase understanding of the<br />
effects of climate change on<br />
these aspects of the site.<br />
With the exception of<br />
cultural heritage, which<br />
forms the focus of these<br />
objectives, the overall effect<br />
on wider environmental<br />
factors is expected to be<br />
neutral. However, there is<br />
an opportunity to increase<br />
positive effects though<br />
consideration of incorporation<br />
of research relating to climate<br />
change impacts.<br />
Recommendation: the<br />
research strategy objectives<br />
should consider the potential<br />
for increased understanding<br />
of climate change impacts on<br />
the site, in the context of both<br />
cultural and natural heritage.<br />
72