(9 NOll), National Highways (12 Nos.). Railways (12 Nos.). social forests (6 Nos.) and<br />

protected forests (6 Nos.).<br />

3.0 Stock of adequate height will be provided to DG set (1K 160 KVA) and DG Set (1x<br />

100 KVA). Water requirement will be met from ground water sooree. Oily effluent will be<br />

treated in effluenllreatn1efl1 plant (ETP) al all tankageslstorageklispalch facll~~.The ef11fre<br />

cross country pipeline will be monitored and controlled by Supervising Control & Data<br />

Acqu'silion (SCADA). The pipeline will be protected against external COffOllIon by three layer<br />

polyethylene (PE) coating for cross COI.Intry pipeline and three layered polypropylene and<br />

additionally by impressed current cathodic protection system. Excavated eal1h will be<br />

restored property and backfIlled.<br />

".0 The proposal was considered by the Expert Appraisal Commitlee (Induslry-2) in lts<br />

25"and 2""meetings held during 26"-30"'July. 2011 and 29" - 3,"October.<br />

2012respeclively.<br />

5.0 All the <strong>Petroleum</strong> prodllCl storage and transportations facilrties are listed at S.N. 6(a)<br />

under Category'S' and shoold have been appraised at the State level. However. due to<br />

applicability of general condition. pipeline passing through interstate boundary. project is<br />

treated as categOfY 'A' and appraised at the Central Level.<br />

6.0 Public hearing was conducted on 10"' April. 2012 for Bharatpur terminal. 1.... May,<br />

2012 !of Mathura Terminal, .... May, 2012 tor Kanpur Terrninaland 3'" April, 2012 for<br />

Palanpur Termilllli.<br />

7.0 The pro;eet has obtained slage-l forest clearance for diversion of forest land in the<br />

State of Haryana on 1".11.2012 and Ullar Pradesh on 11.03.2013 respectively from regional<br />

offICe of MoEF. Chandigarh and lucknow as per the documents submilted by Mis. HPClto<br />

this Ministry.<br />

6.0 The Ministry of Environment and Forests tlereby accords environmental clearance to<br />

the above project under the provisions of EIA NotifICation dated 1.... September, 2006<br />

subject to strlct compliance of the following specifIC and general condilions:<br />

A. SpeCIFIC CONDITIONS:<br />

l. Comments/recommendations shall be obtained from the Slate Forest Department<br />

regarding the impact of the proposed laying of pipeline on the sUfTOlJnding reserve<br />

forests.<br />

ii.<br />

iii.<br />

iv.<br />

All the cond~ions stipulated in the forest clearance shall be implemented.<br />

The project authorily I.e. Mis HPCL shall ensure restoration of the Right of WfroIlO<br />

preconstruction level as soon es construction activity completed. To ensure<br />

prevention of soil efosion. backfilled areas should be property compacted.<br />

Adequate buffer zone aroond the oil tankage shall be maintained, as mfrol be required<br />

as per 0150 or other statutOfY requirements.<br />

v. The company shall monilor PM10, 502. NOx& He and displayed periodically on the<br />

company's web site.