(9 NOll), National Highways (12 Nos.). Railways (12 Nos.). social forests (6 Nos.) and<br />
protected forests (6 Nos.).<br />
3.0 Stock of adequate height will be provided to DG set (1K 160 KVA) and DG Set (1x<br />
100 KVA). Water requirement will be met from ground water sooree. Oily effluent will be<br />
treated in effluenllreatn1efl1 plant (ETP) al all tankageslstorageklispalch facll~~.The ef11fre<br />
cross country pipeline will be monitored and controlled by Supervising Control & Data<br />
Acqu'silion (SCADA). The pipeline will be protected against external COffOllIon by three layer<br />
polyethylene (PE) coating for cross COI.Intry pipeline and three layered polypropylene and<br />
additionally by impressed current cathodic protection system. Excavated eal1h will be<br />
restored property and backfIlled.<br />
".0 The proposal was considered by the Expert Appraisal Commitlee (Induslry-2) in lts<br />
25"and 2""meetings held during 26"-30"'July. 2011 and 29" - 3,"October.<br />
2012respeclively.<br />
5.0 All the <strong>Petroleum</strong> prodllCl storage and transportations facilrties are listed at S.N. 6(a)<br />
under Category'S' and shoold have been appraised at the State level. However. due to<br />
applicability of general condition. pipeline passing through interstate boundary. project is<br />
treated as categOfY 'A' and appraised at the Central Level.<br />
6.0 Public hearing was conducted on 10"' April. 2012 for Bharatpur terminal. 1.... May,<br />
2012 !of Mathura Terminal, .... May, 2012 tor Kanpur Terrninaland 3'" April, 2012 for<br />
Palanpur Termilllli.<br />
7.0 The pro;eet has obtained slage-l forest clearance for diversion of forest land in the<br />
State of Haryana on 1".11.2012 and Ullar Pradesh on 11.03.2013 respectively from regional<br />
offICe of MoEF. Chandigarh and lucknow as per the documents submilted by Mis. HPClto<br />
this Ministry.<br />
6.0 The Ministry of Environment and Forests tlereby accords environmental clearance to<br />
the above project under the provisions of EIA NotifICation dated 1.... September, 2006<br />
subject to strlct compliance of the following specifIC and general condilions:<br />
A. SpeCIFIC CONDITIONS:<br />
l. Comments/recommendations shall be obtained from the Slate Forest Department<br />
regarding the impact of the proposed laying of pipeline on the sUfTOlJnding reserve<br />
forests.<br />
ii.<br />
iii.<br />
iv.<br />
All the cond~ions stipulated in the forest clearance shall be implemented.<br />
The project authorily I.e. Mis HPCL shall ensure restoration of the Right of WfroIlO<br />
preconstruction level as soon es construction activity completed. To ensure<br />
prevention of soil efosion. backfilled areas should be property compacted.<br />
Adequate buffer zone aroond the oil tankage shall be maintained, as mfrol be required<br />
as per 0150 or other statutOfY requirements.<br />
v. The company shall monilor PM10, 502. NOx& He and displayed periodically on the<br />
company's web site.