HP Bitumen Handbook - Hindustan Petroleum Corporation Limited
HP Bitumen Handbook - Hindustan Petroleum Corporation Limited
HP Bitumen Handbook - Hindustan Petroleum Corporation Limited
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
11. bitumen requirements for<br />
various road applications<br />
Quantity of <strong>Bitumen</strong><br />
(Kg per 10sqm)<br />
11.9 Mix seal surfacing:<br />
a) Type A mix seal surfacing 22.0<br />
b) Type B mix seal surfacing 19.0<br />
11.10 Semi-dense bituminous concrete:<br />
Total bitumen content - not less than 4.0<br />
% of total weight<br />
of mix.<br />
11.11 Bituminous concrete:<br />
Total bitumen content - minimum 4.5 %<br />
of total weight of<br />
mix.<br />
11.12 Seal coat:<br />
a) Type A - Liquid seal coat comprising of<br />
application of a layer of bituminous binder<br />
followed by a cover of stone chippings. 9.8<br />
b) Type B - Premixed seal coat comprising of a thin<br />
application of fine aggregates premixed with<br />
bituminous binder. 6.8<br />
11.13 <strong>Bitumen</strong> mastic: 14 to 17<br />
11.14 Slurry Seal:<br />
Total bitumen emulsion content -<br />
180-250 litres per<br />
tonne of dry<br />
aggregate.<br />
23